N.I.O.E.C DOCUMENT CODE PAGE 1 OF 7

PROJECT : PRJ.NO UNIT PHASE DISC. DOC.TYPE SERIAL REV. DATE


BANDAR ABBAS 30" BRANCH
PIPELINE NIOEC230 02 EB ME DS P0202 A0 04-03-20

Data Sheet

For

P-0202 Drain Pump

(UNIT 02)

A4

A3

A2

A1

A0 4-Mar-20 ISSUED FOR APPROVAL M.R.H M.R.H M.K.N

REV. DATE DESCRIPTION PREPARED CHECKED APPROVED


CONT. No. : REF.No.
NATIONAL IRANIAN
OIL ENGINEERING & CONSTRUCTION
COMPANY
N.I.O.E.C DOCUMENT CODE PAGE 1 OF 7

PROJECT : PRJ.NO UNIT PHASE DISC. DOC.TYPE SERIAL REV. DATE


BANDAR ABBAS 30" BRANCH
PIPELINE NIOEC230 02 EB ME DS P0202 A0 04-03-20
CONT. No. : REF.No. :

PROJECT : BANDAR ABBAS 30" BRANCH PIPELINE


N.I.O.E.C
PAGE 2 OF 7

REVISION INDEX
REV. REV. REV.
A1 A2 A3 A4 A1 A2 A3 A4 A1 A2 A3 A4
PAGE. PAGE. PAGE.

1 1 1
2 2 2
3 3 3
4 4 4
5 5 5
6 6 6
7 7 7
#NAME?
THIS DOCUMENT IS THE PROPERTY OF N.I.O.E.C IT IS CONFIDENTIAL AND ALL RIGHTS RESERVED TO THE OWNER NEITHER THE WHOLE NOR ANY PART OF THIS
DOCUMENT MAY BE DISCLOSED TO ANY THIRD PARTY, REPRODUCED, STORED IN ANY RETRIEVAL SYSTEM OR TRANSMITTED IN ANY FORM O
CONT. No. : 8635-XX/XX-XX/XXX-XXXX-AX REF.No. :
CON. No.: REF NO.

N.I.O.E.C PROJECT : BANDAR ABBAS BRANCH PIPELINE PAGE 3 OF 7

CENTRIFUGAL PUMP DATA SHEET (SI UNIT)


P-0202
1 APPLICABLE TO: PROPOSAL PURCHASE AS BUILT
2 FOR N.I.O.E.C UNIT 1 R
e
3 SITE SREVICE CONDENSATE/ CRUDE OIL v
4 No. of Req'd: ---- 1 Service ---- / Stand by ----
5 NOTES : INFORMATION BELOW TO BE COMPLETED BY PURCHASER BY MANUFACTURER BY MANUFACTURER OR PURCHASER
6 DATA SHEETS REVISIONS
7 ITEM NO. ATTACHED ITEM NO. ATTACHED ITEM NO. ATTACHED NO. DATE BY
8 PUMP P-0202 1
9 MOTOR 2
10 GEAR 3
11 TURBINE 4
12 APPLICABLE OVERLAY STANDARD(S) : 5
13 OPERATING CONDITIONS (5.1.3) LIQUID (5.1.3) (Note 1)
14 FLOW, NORMAL 25 (m3/h) RATED 27.5 (m3/h) LIQUID TYPE OR NAME CONDENSATE
15 OTHER HAZARDOUS FLAMMABLE (5.1.5)
16 SUCTION PRESSURE MAX / RATED 1.2 / 1.04 (bara) MIN. NORMAL MAX.
17 DISCHARGE PRESSURE 3.4 (bara) PUMPING TEMP (OC) 15 40
18 DIFFERENTIAL PRESSURE 2.3 (bara) VAPOUR PRESS . (bara) 0.83
19 DIFF. HEAD 31.9 (m) NPSHA 2.9 (m) RELATIVE DENSITY (SG): 0.747
20 PROCESS VARIATIONS (5.1.4) VISCOSITY (CSt) 0.99
21 STARTING CONDITIONS (5.1.4) SPECIFIC HEAT, CP (kj/kg .k.)
22 SERVICE: CONT INTERMITTENT (STARTS/DAY) CHLORIDE CONCENTRATION (6.5.2.4) (mg/kg)
23 PARALLEL OPERATION REQ'D (5.1.13) H2S CONCENTRATION (ppm) WET (5.12.1.12c)
24 SITE DATA (5.1.3) CORROSIVE / EROSIVE AGENT (5.12.1.9)
25 LOCATION: (5.1.30) MATERIALS (5.12.1.1)
26 INDOOR HEATED OUTDOOR UNHEATED ANNEX H CLASS (5.12.1.1) S-6(Note 6)
27 ELECTRICAL AREA CLASSIFICATION (5.1.24 / 6.1.4) MIN DESIGN METAL TEMP (5.12.4.1) (OC)
28 ZONE 2 CLASS II B T3 REDUCED HARDNESS MATERIALS REQ D. (5.12.1.12)
29 WINTERIZATION REQ D. TROPICALIZATION REQ D. BARREL / CASE IMPELLER
30 SITE DATA (5.1.30) (Note 3) CASE / IMPELLER WEAR RINGS
31 ALTITUDE (m) BAROMETER (bara) SHAFT
32 RANGE OF AMBIENT TEMPS:MIN,MAX. / (OC) DIFFUSERS
33 RELATIVE HUMIDITY:MIN / MAX / (%) PERFORMANCE
34 UNUSUAL CONDITIONS: (5.1.30) DUST FUMES PROPOSAL CURVE NO. (r/min)
35 OTHER IMPELLER DIA RATED MAX. MIN. (mm)
36 IMPELLER TYPE
37 DRIVER TYPE RATED POWER (kw) EFFICIENCY (%)
38 INDUCTION MOTOR STEAM TURBINE GEAR MINIMUM CONTINUOUS FLOW :
39 OTHER THERMAL (m3/h) STABLE (m3/h)
40 PREFERRED OPER. REGION TO (m3/h)
41 MOTOR DRIVER (6.1.1 / 6.1.4) ALLOWABLE OPER. REGION TO (m3/h)
42 MANUFACTURER MAX. HEAD @ RATED IMPELLER (m)
43 (kw) (r/min) MAX. POWER @ RATED IMPELLER (kw)
44 FRAME ENCLOSURE NPSHR AT RATED FLOW (m) (5.1.10)
45 HORIZONTAL VERTICAL SERVICE FACTOR MAX SUCTION SPECIFIC SPEED : (5.1.11)
46 VOLTS / PHASE / HERTZ / / MAX . SOUND PRESS LEVEL REQ. D (dba) (5.1.16)
47 TYPE EST MAX. SOUND PRESS LEVEL (dba) (5.1.16)
48 MINIMUM STARTING VOLTAGE (6.1.5) EST MAX. SOUND POWER LEVEL (dba) (5.1.16)
49 INSULATION TEMP. RISE UTILITY CONDITIONS (5.1.3)
50 FULL LOAD AMPS ELECTRICITY VOLTAGE PHASE HERTZ
51 LOCKED ROTOR AMPS DRIVERS
52 STARTING METHOD HEATING
53 LUBE SYSTEM VOLTAGE DIP 80% OTHER (6.1.5)
54 BEARINGS (TYPE / NUMBER) : STEAM MAX. PRESS. MAX. TEMP MIN. PRESS. MIN. TEMP
55 RADIAL / DRIVERS
Form No. : FRM-RE-001-1.Rev. 1

56 THRUST / HEATING
57 VERTICAL THRUST CAPACITY COOLING WATER: (5.1.19) SOURCE N/A
58 UP (N) DOWN (N) SUPPLY TEMP. (OC) MAX. RETURN TEMP. (OC)
59 NORM. PRESS. (bara) DESIGN PRESS. (bara)
60 MIN. RET. PRESS. (bara) MAX. ALLOW. D.P. (bara)
61 CHLORIDE CONCENTRATION : (mg/kg)
62 e Ref. : C:\WINDOWS\Profiles\s.sanai\Desktop\FRM-PCD\PCD-RE-118 (Rev-1).doc
CON. No.: REF NO.:

N.I.O.E.C PROJECT : BANDAR ABBAS BRANCH PIPELINE PAGE 4 OF 7

SUBMERGE PUMP DATA SHEET (SI UNIT)


P-0202
1 CONSTRUCTION SURFACE PREPARATION AND PAINT Rev
2 ROTATION : (VIEWED FROM COUPLING END) CW CCW MANUFACTURER'S STANDARD OTHER SEE BELOW
3 PUMP TYPE : (1.3) (Note 4) SPECIFICATION NO.
4 VS1 VS2 VS3 VS4 VS5 VS6 VS7 PUMP :
5 CASING MOUNTING : PUMP SURFACEPREPARATION
6 INLINE SUMP COVER PLATE PRIMER
7 SEPARATE MOUNTING PLATE(8.3.8.3.1) FINISH COAT
8 SEPARATE SOLE PLATE(8.3.8.3.3) BASEPLATE/COLUMN : (6.3.1.7)
9 CASING SPLIT: PUMP SURFACEPREPARATION
10 AXIAL RADIAL PRIMER
11 CASING TYPE : FINISH COAT
12 SINGLE VOLUTE MULTIPLE VOLUTE DIFFUSER SHIPMENT : (7.4.1)
13 CASE PRESSURE RATING : DOMESTIC EXPORT EXPORT BOXING REQUIRED
14 MAX. ALLOWABLE WORKING PRESSURE (bar) OUTDOOR STORAGE MORE THAN 6 MONTHS
15 @ (OC) SPARE ROTOR ASSEMBLY PACKAGED FOR :
16 HYDRO TEST PRESSURE (bar) HORIZONTAL STORAGE VERTICAL STORAGE
17 SUCTION PRESS. REGIONS MUST BE DESIGNED FOR MAWP(5.3.6) TYPE OF SHIPPING PREPARATION
18 NOZZLE CONNECTIONS : (5.4.2) HEATING AND COOLING(Note 7)
19 SIZE FLANGE FACG POSITION HEATING JACKET REQ D. (5.8.9)
20 RATING COOLING REQ D.
21 SUCTION 150# SUBMERGED COOLING WATER PIPING PLAN (6.5.3.1)
22 DISCHARGE 150# TOP C.W. PIPING:
23 BALANCE DRUM PIPE TUBING: FITTINGS
24 PRESSURE CASING AUX. CONNECTIONS : (5.4.3) C.W. PIPING MATERIALS:
25 NO. SIZE (DN) TYPE S.STEEL C.STEEL GALVANIZED
26 DRAIN COOLING WATER REQUIREMENTS :
27 VENT BEARING HOUSING (m3/h)@ (bar)
28 WARM-UP HEAT EXCHANGER (m3/h)@ (bar)
29 BALANCE/LEAK-OFF STEAM PIPING TUBING PIPE
30 MACHINED AND STUDDED CONNECTIONS : (5.4.3.8) BEARING AND LUBRICATION
31 CYLINDRICAL THREADS REQUIRED (5.4.3.3) BEARING (TYPE / NUMBER ) :
32 ROTOR : RADIAL /
33 COMPONENT BALANCE TO ISO 1940 G 1.0 (5.9.4.4) THRUST /
34 SHRINK FIT-LIMITED MOVEMENT IMPELLERS
35 COUPLINGS :(6.2.2) (Note 5) LUBRICATION (5.11.3,5.11.4) :
36 MANUFACTURER MODEL GREASE FLOOD FLINGER
37 PURGE OIL MIST PURE OIL MIST
38 SPACER LENGTH (mm) SERVICE FACTOR CONSTANT LEVEL OILER PREFERENCE (5.10.2.2) :
39 RIGID
40 THROUGH COUPLINGS: OIL VISC. ISO GRADE
41 MANUFACTURER MODEL REVIEW AND APPROVE THRUST BEARING SIZE
42 RATING(kw per 100r/min) LUBE OIL HEATER REQUIRED: STEAM ELECTRIC
43 SPACER LENGTH (mm) SERVICE FACTOR
44 RIGID INSTRUMENTATION(6.4.2)
45 DRIVER HALF COUPLING MOUNTED BY: ACCELEROMETER (6.4.2.1)
46 PUMP MFR. DRIVER MFR PURCHASER PROVISION FOR MOUNTING ONLY (5.10.2.11)
47 COUPLING BALANCED TO ISO 1940-1 G 6.3 (6.2.3) FLAT SURFACE REQ D (5.102.1.2)
48 COUPLING PER ISO 14691 (6.2.4) PRESSURE GAUGE TYPE
49 COUPLING PER ISO 14
10441 (6.2.4) REMARKS :
50 COUPLING PER API 671 (6.2.4)
51 NON SPARK COUPLING GUARD (6.2.14C) MASSES(kg)
52 COUPLING GUARD STANDARD PER (6.2.14a) PUMP
53 MECHANICAL SEAL : (5.8.1) (Note 6) BASEPLATE
54 SEAL MANUFACTURER DRIVER
55 CATEGORY 2 TOTAL
Form No. : FRM-RE-001-1.Rev. 1

56 TYPE(SEAL CODE) A GEAR


57 ARRANGMENT 13/61 (Note 4)
63 JACKET REQUIRED (2.7.3.17)
64 SEAL CHAMBER DATA:(2.1.6/2.1.7)
65 TEMPERATURE
66 PRESSURE
67 FLOW
CON. No.: REF NO.:

N.I.O.E.C PROJECT : BANDAR ABBAS BRANCH PIPELINE PAGE 5 OF 7

SUBMERGE PUMP DATA SHEET (SI UNIT)


P-0202
1 SPARE PARTS (TABLE 18) VERTICAL PUMPS (CONT.) Rev.
2 START-UP NORMAL MAINTENANCE PUMP AND STRUCTURE DYNAMIC ANALYSIS (8.3.5)
3 SPECIFY FOR 2 YEARS OPERATION DRAIN PIPED TO SURFACE (8.3.13.5)
4 OTHER PURCHASER REQUIREMENTS QA INSPECTION AND TESTING(Note 8)
5 SHOP INSPECTION (7.1.4) PERF. CURVE APPROVAL
6 COORDINATION MEETING REQUIRED (9.1.3) TEST WITH SUBSTITUTE SEAL (7.3.3.2b)
7 MAXIMUM DISCHARGE PRESSURE INCLUDE (5.3.2) TEST NON-WIT WIT OBSERVE
8 MAX. RELATIVE DENSITY HYDROSTATIC TEST OF BOWLS
9 MAX. DIA. IMPELLER AND / OR NO. OF STAGES AND COLUMN (8.3.13.2)
10 OPERATION TO TRIP SPEED HYDROSTATIC (7.3.2)
11 CONNECTION DESIGN APPROVAL (5.1.2.3.4) PERFORMANCE (7.3.3)
12 TORSIONAL ANALYSIS REQUIRED (5.9.2.1) RETEST ON SEAL LKGE (7.3.3.2d)
13 TORSIONAL ANALYSIS REPORT (5.9.2.6) NPSH (7.3.4.2)
14 PROGRESS REPORTS (9.3.3) COMPLETE UNIT TEST (7.3.4.3)
15 OUTLINE OF PROCEDURES FOR OPTIONAL TESTS (9.2.5) SOUND LEVEL TEST (7.3.4.4)
16 ADDITIONAL DATA REQUIRING 20 YEARS RETENTION (7.2.2.10) CLEANLINESS PRIOR TO
17 MANIFOLD PIPING TO SINGLE CONNECTION (6.5.1.6) FINAL ASSEMBLY (7.2.2.2)
18 VENT DRAIN COOLING WATER NOZZLE LOAD TEST (6.3.6)
19 MOUNT SEAL RESERVOIR OFF BASEPLATE (6.5.1.4) 4 HR. MECH. RUN TEST (7.3.4.7.2)
20 FLANGES REQ D IN PLACE OF SOCKET WELD UNIONS (6.5.2.8) MECHANICAL RUN UNTIL OIL
21 CONNECTION BOLTING TEMP STABLE (7.3.4.7.1)
22 PTFE COATING ASTM A153 GALVANIZED 4 HR. MECHANICAL RUN AFTER
23 PAINTED SS OIL TEMP STABLE (7.3.4.7.3)
24 INSTALLATION LIST IN PROPOSAL (9.2.3L) TRUE PEAK VELOCITY
25 DATA (7.3.3.4d)
26 VERTICAL PUMPS RESONANCE TEST (8.3.9.2)
27 PUMP THRUST : (+)UP (-)DOWN AUXILIARY EQUIPMENT
28 AT MIN. FLOW (N) (N) TEST (7.3.4.5)
29 AT RATED FLOW (N) (N) IMPACT TESTING (5.12.4.3)
30 MAX THRUST (N) (N) PER EN 13445
31 SOLE PLATE REQ D. (8.3.8.3.3) (m) X (m) PER ASME VIII
32 SEPARATE MOUNTING PLATE REQUIRED (8.3.8.3.1) VENDOR KEEP REPAIR AND HT RECORDS (7.2.1.1c)
33 SOLE PLATE THICKNESS (mm) VENDOR SUBMIT TEST PROCEDURES (7.3.1.2 / 9.2.5)
34 COLUMN PIPE : FLANGED THREADED VENDOR SUBMIT TEST DATA WITHIN 24 HOURS (7.3.3.3e)
35 DIAMETER (mm) LENGTH (m) INCLUDE PLOTTED VIBRATION SPECTRA (5.9.3.3)
36 GUIDE BUSHINGS RECORD FINAL ASSEMBLY RUNNING CLEARANCES
37 NUMBER COMPLETION OF INSPECTION CHECK LIST (7.1.6)
38 LINE SHAFT BEARING SPACING (mm) MATERIAL CERTIFICATION REQUIRED (5.12.1.8)
39 GUIDE BUSHINGS LUBE : CASING IMPELLER SHAFT
40 WATER OIL OTHER SHAFT SLEEVE , WEAR RINGS ,
41 GREASE PUMPAGE
42 LINESHAFT : OPEN ENCLOSED CASTING REPAIR PROCEDURE APPROVAL REQ D (5.12.2.5)
43 INSPECTION REQUIRED FOR CONNECTION WELDS (5.12.3.4)
44 LINE SHAFT DIAMETER : (mm) MAG PARTICLE LIQUID PENETRANT
45 TUBE DIAMETER : (mm) RADIOGRAPHIC ULTRASONIC
46 LINESHAFT COUPLING : INSPECTION REQUIRED FOR CASTINGS (7.2.1.3) (5.12.1.5)
47 LINE SHAFT DIAMETER : SLEEVE & KEY THREADED MAG PARTICLE LIQUID PENETRANT
48 SUCTION CAN THICKNESS (mm) RADIOGRAPHIC ULTRASONIC
49 LENGTH (m) HARDNESS TEST REQUIRED (7.2.2.3)
50 DIAMETER (m) ADDITIONAL SUBSURFACE EXAMINATION (7.2.1.3)
51 SUCTION STRAINER TYPE FOR
52 FLOAT & ROD FLOAT SWITCH METHOD
53 IMPELLER COLLETS ACCEPTABLE (5.6.3)
54 HARDENED SLEEVES UNDER BEARINGS (8.3.10.5)
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
CON. No.: REF NO.:

N.I.O.E.C PROJECT : BANDAR ABBAS BRANCH PIPELINE PAGE 6 OF 7

CENTRIFUGAL PUMP DATA SHEET (SI UNIT)


P-0202
1 APPLICABLE TO: PROPOSALS PURCHASE AS BUILT
2 FOR N.I.O.E.C UNIT 2 R
e
3 SITE SREVICE CONDENSATE/CRUDE OIL v
4
5 NOTES INFORMATION BELOW TO BE COMPLETE BY PURCHASER BY MANUFACTURER BY MANUFACTURER OR PURCHASER
6
7 PRESSURE VESSEL DESIGN CODE REFERENCES.
8 THESE REFERENCES MUST BE LISTED BY THE MANUFACTURER
9 CASTING FACTORS USED IN DESIGN (5.3.4) (TABLE 3 )
10 SOURCE OF MATERIAL PROPERTIES
11
12 WELDING AND REPAIRS (5.12.3)
13 THESE REFERENCES MUST BE LISTED BY THE PURCHASER. DEFAULT TO TABLE 10 IF NO PURCHASER PREFERENCE IS STATED)
14 ALTERNATIVE WELDING CODES AND STANDARDS (5.12.3.1)
15 WELDING REQUIREMENT (APPLICABLE CODE OR STANDARD) PURCHASER DEFINED DEFAULT PER TABLE 10
16 WELDER OPERATOR QUALIFICATION
17 WELDING PROCEDURE QUALIFICATION
18 NON-PRESSURE RETAINING STRUCTURAL WELDING SUCH AS BASEPLATES OR SUPPORTS
19 MAGNETIC PARTICLE OR LIQUID PENETANT EXAMINATION OF THE PLATE EDGES
20 POST WELD HEAT TREATMENT
21 POST WELD HEAT TREATMENT OF CASING FABRICATION WELDS
22
23 MATERIAL INSPECTION (7.2.2.1)(7.2.1.3)
24 THESE REFERENCES MUST BE LISTED BY THE PURCHASER. DEFAULT TO TABLE 10 IF NO PURCHASER PREFERENCE IS STATED)
25 ALTERNATIVE MATERIAL INSPECTIONS AND ACCEPTANCE CRITERIA (SEE TABLE 13)
26 TYPE OF INSPECTION METHODS FOR FABRICATIONS CASTINGS
27 RADIOPRAPGY
28 ULTRASONIC INSPECTION
29 MAGNETIC PARTICLE INSPECTION
30 LIQUID PENETRANT INSPECTION
31 REMARKS
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
Form No. : FRM-RE-001-1.Rev. 1

50
51
52
53
PRESSURE DESIGN CODE
WELDING REQUIREMENTS
PURCHASER DEFINED MATERIAL INSPECTIONS
CON. No.: REF NO.:

N.I.O.E.C PROJECT : BANDAR ABBAS BRANCH PIPELINE PAGE 7 OF 7

CENTRIFUGAL PUMP DATA SHEET (SI UNIT)


P-0202
Note 1: CRUDE OIL SHALL BE HANDELED BY PIPELINE, COMPLETE FLUID PROPERTIES ARE AS PROJECT DESIGN BASIS.
1
2 Note 2: deleted
3 Note 3: FOR SITE CONDITION SEE PROJECT SPECIFICATION FOR SITE CONDITION.
4 Note 4: TO BE REVIEWED AND CONFIRMED BY PUMP VENDOR.
5 Note 5: FLEXIBLE SPACER TYPE COUPLING SHALL BE USED.
6 Note 6: MECHANICAL SEAL SHALL BE AS PER API 682 AND VENDOR SHALL FILL OUT MECHANICAL SEAL DATASHEET
7 OF API 682 DURING DETAIL ENGINEERING PHASE. ALSO SPECIFIED SEAL SPECIFICATIONS IN THIS DATA SHEET
8 SHALL BE REVIEWED AND VERIFIED BY PUMP AND SEAL VENDORS.
9 Note 7: VENDOR SHALL CONSIDERED AND SPECIFY PROPER COOLING PLAN AS PER API 610 (10TH EDITION), ANNEX B.
10 Note 8: All TESTS AND INSPECTION SHALL BE AS PER ITEM 7.3. OF PROJECT SPECIFICATION FOR
11 CENTRIFUGAL PUMPS FOR GENERAL REFINERY SERVICES.
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
56

You might also like