Hauwei Equipment (CDMA)

SITE NAME - TIGER TOWN NUMBER - 1019

WORK DESCRIPTION

1 ANTENNA INFORMATION COMMENTS


HEIGHT -METERS/FEET AZIMUTH TILT
a. Sector Alpha 330FT 185 5
b. Sector Beta 330FT 275 5
c. Sector Gamma 330FT 345 8

2 FIBER FOR RRU'S COMMENTS


Optical Power (dBm)
RX TX
a Sector Alpha -6.00 -6.40
b Sector Beta -6.10 -6.10
c Sector Gamma -6.60 -6.20

3 INSPECTION OF ANTENNA CABLES,CONNECTORS AND GROUNDING


OK FAULT COMMENTS
a. Sector Alpha √
b. Sector Beta √
c. Sector Gamma √

4 INSPECTION OF POWER SUPPLY


COMMENTS
a. BTS Input power Volts
L1N
L2N
b. Power supply outlets Volts
OK FAULT
c. Surge suppressor √
d Battery connections √

Volts Amps
e0 Battery Load Test - measure voltage at start w/ AC Test for 120mins
No AC 53.93 9.22
after 10 min 52.82 -12.65 0:00
after 20 min 50.55 -13.39 1:10
after 30 min 50.65 -13.24 1:20
after 40 min 50.65 -13.24 1:30
after 50 min 50.53 -13.39 1:40
after 60 min 50.58 -13.39 1:50
after 70 min 50.52 -13.69 2:00
after 80 min 50.49 -13.54 2:10
after 90 min 50.34 -13.39 2:20
after 100 min 50.26 -13.39 2:30
after 110 min 50.15 -13.54 2:40
after 120min 50.05 -13.69 2:50
5 POWER DISTRIBUTION
Port Breaker Size Cable Size Description Commnets
a. Port 0 4 NA NA
b. Port 1 4 NA NA
c. Port 2 12 12 AFMU
d. Port 3 12 12 BBU
e. Port 4 20 NA NA
f. Port 5 20 NA NA
g. Port 6 20 10 DC SPRU SECT GAMA
h. Port 7 20 NA NA
i. Port 8 20 NA NA
j. Port 9 20 10 IPRAN PWR

6 AMP-HOUR MANUFACTURAR VOLTAGE COMMENTS


a. BATTERY 1 90Ah SHOTO 10.6 L-R
b. BATTERY 2 90Ah SHOTO 10.9
c. BATTERY 3 90Ah SHOTO 10.7
d. BATTERY 4 90Ah SHOTO 10.9
e. BATTERY 5 100Ah Northstar Red Battery 10.3 Bank 2
f BATTERY 6 100Ah Northstar red battery 10
g BATTERY 7 100Ah Northstar red battery 9.9
h. BATTERY 8 100Ah Northstar red battery 10.7

7 INSPECTION OF CABINET
OK Fault COMMENTS
a. Doors, locks and hinges √
b. Interior dust free √
c. Rectifiers √
d. Cables √
e. Cooling Unit √
f. Filters √
g. Grounding √
e. Access holes √

COMMENTS
ZTE Equipment (LTE & UMTS)
SITE NAME - TIGER TOWN

WORK DESCRIPTION

1 LTE & UMTS ANTENNA INFORMATION


HEIGHT -METERS/FEET AZIMUTH
a. Sector Alpha 330FT 180
b. Sector Beta 330FT 275
c. Sector Gamma 330FT 345

2 FIBER FOR RRU'S [LTE]


Optical Power (dBm)
TX
a Sector Alpha -5.01
b Sector Beta -5.08
c Sector Gamma -5.21

3 FIBER FOR RRU'S [UMTS]


Optical Power (dBm)
TX
a Sector Alpha -7.32
b Sector Beta -6.94
c Sector Gamma -6.82

4 INSPECTION OF ANTENNA CABLES,CONNECTORS AND GROUN


OK FAULT
a. Sector Alpha √
b. Sector Beta √
c. Sector Gamma √

5 DCPD6
Port Breaker Size Cable Size
Port 1 20A NA
Port 2 20A NA
Port 3 20A 12
Port 4 20A 12
Port 5 20A 12
Port 6 20A 10
Port 7 20A 10
Port 8 20A 10
Port 9 20A 14
uipment (LTE & UMTS)
NUMBER - 1019

WORK DESCRIPTION

FORMATION COMMENTS
ELEC. TILT [UMTS_LTE] MEC. TILT
0 8
4 7
6 7

[LTE] COMMENTS
Optical Power (dBm)
RX
-5.18
-4.99
-5.53

UMTS] COMMENTS
Optical Power (dBm)
RX
-6.89
-9.04
-7.58

NTENNA CABLES,CONNECTORS AND GROUNDING


COMMENTS

DCPD6
Description Commnets
NA OFF
NA OFF
PWR GAMMA ON
PWR BETA ON
PWR ALPHA ON
FDD PWR S3 ON
FDD PWR S2 ON
FDD PWR S1 ON
PM3 PWR ON
Broadband - WIFI
SITE NAME - TIGER TOWN NUMBER - 101
WORK DESCRIPTION
LSW1
TAG 4644 5905
DL 163.7 163.41
UL 840.66 840.63

1 ANTENNA INFORMATION
HEIGHT -METERS/FEET AZIMUTH TILT
a. AP1 330ft 45 6
b. AP-1C 330ft 45 6
c. AP-1D 330ft 45 6
d. AP-2 330ft 45 6
e. AP-2B 330ft 345 6
f. AP-2C 330ft 345 6
g AP-2D 330ft 34 6

2 INSPECTION OF ANTENNA CABLES,CONNECTORS AND GROUNDING


ANTENNA RADIO ARRESTOR GPS & Cable
a. AP1 √ √ √ √
b. AP-1C √ √ √ √
c. AP-1D √ √ √ √
d. AP-2 √ √ √ √
e. AP-2B √ √ √ √
f. AP-2C √ √ √ √
g. AP-2D √ √ √ √

3 INSPECTION OF POWER SUPPLY _POE n INVERTER


POE FAULT COMM
a. AP1 gets power fr
b. AP-1C gets power fr
c. AP-1D gets power fr
d. AP-2 gets power fr
e. AP-2B gets power fr
f. AP-2C gets power fr
g. AP-2D gets power fr

LOAD OK Fault
a. Inverter INV 1 √
b. Inverter INV 2 √
FI
NUMBER - 1019

COMMENTS

ORS AND GROUNDING


CABLE/CON COMMENTS






OE n INVERTER
COMMENTS
gets power from switch
gets power from switch
gets power from switch
gets power from switch
gets power from switch
gets power from switch
gets power from switch

COMMENTS
Tower
SITE NAME - TIGER TOWN

WORK DESCRIPTION
Tower Type: SELF SUPPORT
Height: 330 Ft

1 TOWER INSPECTION

a. Lighting Rod and connections


b. Tower lights
c. Cable trays
d Ground Resistance
e. Climbing ladder
f. Base
g. Paint
h. Busbar
i. Anchor's (If Applicable)

2 TOWER INVENTORY
Height Alpha Beta
340 lightening Arrestor
330 CDMA ANTHENA & RRU AP2, AP2B, AP2 & AP2D
330 AP1, AP1C, & AP1D CDMA ANTHENA & RRU
330 UMTS, LTE ANTHENA & RRU UMTS, LTE ANTHENA & RRU
300
280
260
240
220
200
180
160
140
120
100
80
60
40
20
0
Tower
NUMBER - 1019

WORK DESCRIPTION

TOWER INSPECTION
OK FAULT COMMENTS








N/A

COMMENTS
Beta Gamma
lightening Arrestor
P2, AP2B, AP2 & AP2D UMTS, LTE ANTHENA & RRU
DMA ANTHENA & RRU CDMA ANTHENA & RRU
TS, LTE ANTHENA & RRU
Port Allocation
SITE NAME - TIGER TOWN

WORK DESCRIPTION

NO. Rack/Cabinet Location DEVICE

1 Huawei Cabinet PDU


2 Huawei Cabinet PDU
3 Huawei Cabinet PDU
4 Huawei Cabinet PDU

5 ZTE RACK Mikrotik 3657


6 ZTE RACK Mikrotik 3657
7 ZTE RACK Mikrotik 3657
8 ZTE RACK Mikrotik 3657
9 ZTE RACK Mikrotik 3657
10 ZTE RACK Mikrotik 3657

11 ZTE RACK Mikrotik 4644


12 ZTE RACK Mikrotik 4644
13 ZTE RACK Mikrotik 4644
14 ZTE RACK Mikrotik 4644
15 ZTE RACK Mikrotik 4644
16 ZTE RACK Mikrotik 4644

17 ZTE RACK Mikrotik 5905


18 ZTE RACK Mikrotik 5905
19 ZTE RACK Mikrotik 5905
20 ZTE RACK Mikrotik 5905
21 ZTE RACK Mikrotik 5905

22 ZTE RACK IPRAN


23 ZTE RACK IPRAN
24 ZTE RACK IPRAN
25 ZTE RACK IPRAN
26 ZTE RACK IPRAN
27 ZTE RACK IPRAN
28 ZTE RACK IPRAN
29 ZTE RACK IPRAN
30 ZTE RACK IPRAN
31 ZTE RACK IPRAN
ZTE RACK IPRAN
ZTE RACK IPRAN
ZTE RACK IPRAN
ZTE RACK IPRAN

31 FORTINET 200F

33 ZTE RACK #3 ZTE IDU


Port Allocation
NUMBER - 1019

WORK DESCRIPTION

PORT DESCRIPTION

2 AFMU
3 BBU
6 DC SPRU SECT GAMA
9 IPRAN PWR

1 PT1-IPRAN

19 CISCO 1900 SWITCH


21 CISCO 1900 SWITCH
23 PT23-D1 TO QUALITY POULTRY
24 PT24-DI TO IPRAN

1 IPRAN SLOT 4 PORT 3


6 AP1
8 AP1 LOWER
14 AP2
16 AP 2-B
22 BELIZE LIVE STOCK DI

1 IPRAN
10 AP1- 1C
12 AP-1D
14 AP-2C
16 AP-2D

CARD 3 Port 2
CARD 3 Port 3 Ceragon IDU Main- Bmp-Tea Elec Port 1
CARD 4 Port 1 FEO CMPT
CARD 4 Port 2 ETH-0 LPU
CARD 4 Port 3 TIGER TOWN LSW Port 1
CARD 4 Port 4 ZTE LSW MNGT
CARD4 Port 5 Mikrotik P1
CARD 4 Port 6 Mikrotik P24
CARD 4 Port 7 PORT1 MIKROTIK 5905
CARD 4 Port 8 ELTEK POWER PLANT
CARD9 PORT1&2 ODF1
CARD10 FGT_X1 TO IPRAN-PT10
11 PORT3&4 ODF 1 UNITEDVILLE
12 PORT1&2 ODF1 HTV

X1 FGT_X1 TO IPRAN-PT10
X2 JUSHER 10G SCN ODF P8
#2 PORT 1-#4 PORT 1 SLOT 3, PORT 3
FIBER DESCRIPT
SITE NAME - TIGER TOWN

WORK DESCRIPTION

Source ODF Spliced


No. Tube Strand
SCN 1 HATTIVILLE SCN ↔
SCN 2 HATTIVILLE SCN ↔
3 UNITEDVILLE ↔
4 UNITEDVILLE ↔
5 MORE FM ↔
6 MORE FM ↔
7 ↔
8 ↔
9 ↔
10 ↔
11 ↔
12 ↔

Source ODF
No. Tube Strand
CCV 1
2
3 IPRAN SLOT 3 PORT 2
4
5
6
7
8
9
10
11
12
R DESCRIPTION
NUMBER - 1019

WORK DESCRIPTION

Fiber Destination
Strand Tube No.
1 IPRAN CARD 11
2 IPRAN CARD 11
3 IPRAN CARD 9
4 IPRAN CARD 9
5 IPRAN CARD3
6 IPRAN CARD 3
7
8 USHER 10G
9
10
11
12

Spliced Fiber
Strand Tube No.
↔ 1
↔ 2
↔ FORTINET SCN ODF P8 3
↔ 4
↔ 5
↔ 6
↔ 7
↔ 8
↔ 9
↔ 10
↔ 11
↔ 12
Destination
Generator
SITE NAME - TIGER TOWN NUM
WORK DESCRIPTION

Generator Maintenance Report Form


Model Number DE16E3S
Serial Number CAT00C22JGBY10065
Preliminary checks
GOOD
1. Check belts √
2. Check for coolant leaks √
3. Check for oil leaks √
4. Check for fuel leaks ( inside genset ) √
5. Check coolant level ( top up if necessary ) √
6. Check oil level ( top up if necessary ) √
7. Check battery electrolyte level ( top up if necessary ) √
8. Check Racor filter for presence of water √

Preload checks
1. Check control panel for active alarms √
2. Record trickle charger voltage
3. Check base tank / day tank fuel level
4. Check bulk tank fuel level
5. Inspect fuel lines for leaks √

Load testing ( 1 hr on load )


Fail mains and let engine run for 15 minutes on land before taking the following measurements
L1N L2N
Genset output voltage 239 120
Genset output current 240
Frequency 61.4
Running Genset
1. Battery voltage 13.8
2. AC Output 240
3. RPM 1844
4. Running hours 62.5
5. Temperature 167
6. Pressure 63
7. Amps
8. KWHr Percent
9. Fuel Level Percent

During load exercise check that: GOOD


1. Rain guard at end of exhaust pipe outside building is open √
2. Radiator exhaust louver is open √
3. There aren't exhaust leaks inside building √

During load exercise perform the following activities GOOD


1. Wipe down genset enclosure √
2. Sweep out gen room √
3. Inspect fire extinguisher √
4. Test emergency lights √

Post load test checks


Restore BEL supply, wait for genset to shutdown and perform the following checks GOOD
1. Ensure that genset control panel does not have any alarms √
2. Ensure that rain guard closes back √
3. Ensure that exhaust louver is closed √
4. Ensure that the ATS is in normal position and load is on BEL √
5. Veirfy correct time & date setting on ATS √
5. Ensure that all load circuits are closed and all equipment is functioning normally √
6. Lock back genset access panels √
NUMBER - 1019

NOT GOOD
Record if further action is needed
Record if further action is needed
Record if further action is needed
Record if further action is needed
Record qty added
Record qty added
Record qty added
Drain if necessary

Record and clear alarms


Volts
Record fuel level
Record fuel level
Record any leaks found

ments

Hz

Volts
Volts
Hz
Hrs
deg F
psi
psi

NOT GOOD
NOT GOOD

NOT GOOD
Power Plant
SITE NAME - TIGER TOWN
WORK DESCRIPTION

AMP-HOUR MANUFACTURAR
BATTERY 1 150Ah MASTER SAFE
BATTERY 2 150Ah MASTER SAFE
BATTERY 3 150Ah MASTER SAFE
BATTERY 4 150Ah MASTER SAFE
BATTERY 5 125Ah MARATHON
BATTERY 6 125Ah MARATHON
BATTERY 7 125Ah MARATHON
BATTERY 8 125Ah MARATHON
BATTERY 9 125Ah MARATHON
BATTERY 10 125Ah MARATHON
BATTERY 11 125Ah MARATHON
BATTERY 12 125Ah MARATHON

POWER PLANT
General
Ensure that equipment racks are level and properly bolted down
Ensure that equipment racks are clean and dust free. Clean as necessary
Ensure that all covers are in place and properly secured

Power Frame & Controller


Visual inspection of power frame(s) and controller unit(s)
Check controller visual alarm indicators for any current alarms
Review alarm log. Record and reset alarms found. Clear alarm log
Record voltage and current readings

Power Modules
Visual inspection of installed power modules for alarms. Record if found
Reset any modules with alarms as specified by manufacturer. Replace if necessary
Record number of power slots available, number in use and spare positions

Load Audit
Open Load Distribution Center
Record available number of distribution positions, in use and spare
Record breaker size, cable size and breaker position of positions in use
Ensure proper lug is used ( single, double ) and bolts are properly tightened

BATTERIES
General
Ensure that battery racks are level and properly bolted down
Ensure that battery racks are clean and dust free. Clean as necessary
Ensure that all covers are in place and properly secured

Cells
Individually inspect each battery for heat buildup, swelling, leakeage, venting
Individually inspect each battery post for intergrity
Individually inspect each battery post for proper torqueing. Retorque if necessary
Manually inspect battery interconnects for heat buildup
Record voltage, temperature and internal resistance / conductance for each battery

Load test
Record battery voltage across each battery string
Fail AC supply
Record battery voltage across each battery string
With AC supply off repeat voltage readings across each string every 10 mins for 1 hour
Restore AC supply
Record load current and system voltage upon AC supply return
Wait until load current drops back to pre load test value. Record time
Ensure that all loads are on line and back to normal
Ensure there aren't any alarms present. Address if found
Battery Discharge Record Shee
Date:
Site: SITE NAME - TIGER TOWN
Bank # 2

Time (min) Voltage Load


53.98 30
0 50.54 28
10 49.55 30 0:00
20 49.55 30 1:10
30 49.61 28 1:20
40 49.66 29 1:30
50 49.65 29 1:40
60 49.64 29 1:50
70 49.58 28 2:00
80 49.57 28 2:10
90 49.44 28 2:20
100 49.37 29 2:30
110 49.22 29 2:40
120 49.08 29 2:50

Pictures
Batteries
Load Center
Controller Readings
Alarms
er Plant
NUMBER - 1019
RK DESCRIPTION

ANUFACTURAR VOLTAGE COMMENTS


MASTER SAFE 9.9
MASTER SAFE 10
BANK #1
MASTER SAFE 10.2
MASTER SAFE 10
MARATHON 10.1
MARATHON 10.1
BANK #2
MARATHON 10.4
MARATHON 10.4
MARATHON 10.4
MARATHON 10
BANK #3
MARATHON 10
MARATHON 10.2

OK NK Comments

ü
ü
ü

ü
ü
ü
ü

ü
ü
___2__ Available __7____ In use ____0___ Spare

Use table provided


Use table provided
Address as needed
ü
ü
ü

ü
ü
ü
ü
ü

ü
ü
ü
ü
ü
____44___ Amps ___53.98__ Volts
___1___ Min
ü
ü
Building and Compound
SITE NAME - TIGER TOWN

WORK DESCRIPTION

INSPECTION OF SURROUNDING AREA

FENCE
No. Item Status Action Needed

1 Foundation & Block work


G

2 Fence fittings & chain link


NG

3 Gate(s) & Gate locks


G

4 Drainage ports
G

COMPOUND
1 Fire Break ( if applicable )
G

2 Bushing
G

3 Access way(s)
G

4 Culvert(s)
G

5 Drain(s)
G

6 Filling & Levelling


G

7 Garbage disposal
NONE

8 Compound cleanliness
G

BUILDING ( one per building )


1 Exterior Walls
G

2 Columns & Beams


G
3 Stairs
G

4 Rails
G

5 Doors
G

6 Door Locks
NG

7 Roof
G

8 Eves
N/A

9 External Lights
G

10 Internal walls
G

11 Interior Painting
G

12 Interior Floor
G

BUILDING ( cont )
13 Interior Ceiling
G

14 Interior Lights
G

15 Windows ( if applicable )
N/A

16 Louvers ( if applicable )
N/A

17 Burglar bars ( if applicable )


N/A

18 Bathroom fixtures ( if applicable )


N/A

19 Plumbing ( if applicable )
N/A

20 Furniture ( if applicable )
N/A

21
AC 1
WORKING GOOD
Air Condition
WORKING GOOD
AC 2

22 Air Condition Drainage


G

23 Fire Extinguishers
N/A
N/A

24 Intrusion Alarm System


N/A

25 Fire Alarm System


NA

26 Smoke Detectors
N/A

27 Interior Cleaning
N/A

28 Storage of Spares and manuals


N/A

Saturday, December 30, 1899 0


mpound
NUMBER - 1019

RROUNDING AREA

Comments
0
Main Ground Grid
Open Handhole
Inspect handhole, metal brackets, insulators, bus bar(s), ground cables, nuts & bolts
Replace, repair or maintain damaged/ faulty material as necessary
Disconnect cables from bus bar, polish bus bar, and apply No-Oxide grease. Reinstall bus bars
Check cables for proper crimping and reconnect to ground bar. Ensure adequate torque
Ensure cables are properly labelled. Relabel as necessary

Equipment Ground Bar ( EGB )


Inspect metal brackets, insulators, bus bar(s), ground cables, nuts & bolts
Replace, repair or maintain damaged/ faulty material as necessary
Disconnect cables from bus bar, polish bus bar, and apply No-Oxide grease. Reinstall bus bars
Check cables for proper crimping and reconnect to ground bar. Ensure adequate torque
Ensure cables are properly labelled on both ends i.e. bus bar and eqpt. Relabel as necessary

Equipment Frame Grounds


Inspect all equipment frames and cabinets to ensure they are grounded
Inspect all frame grounds to ensure cable integrity and proper installation
Install frame ground for any equipment not grounded. Record any new grounds installed
Remove any frame grounds found for equipment removed. Record grounds removed
Ensure that where installed, DC power plant positive bus is grounded to MGB with 2/0 cable
Ensure that all frame grounds are properly labelled on both ends. Relabel as necessary
Inspect all internal cable trays to ensure that they are daisy chained and referenced to the EGB
Inspect grounding halo inside equipment room for cable integrity and proper installation

Tower Ground
Inspect tower leg grounds to ensure cable integrity and proper installation
Inspect grounding plates and nuts & bolts. Service, repair or replace as necessary
Inspect equipment ground cable running up the tower for cable integrity and proper installation
Inspect lightning arrestor ground cable for cable cable integrity and proper installation
Megger grounding cable on each tower leg
i
OK NK Comments

ü
ü
ü
ü
ü

ü
ü
ü
ü
ü

ü
ü
ü
ü
ü
ü
ü
ü

ü
ü
ü
ü
Leg 1 __0.6___ Leg 2 ___0.5____ Leg 3 ____1.0______
Material Qty
Door Locks 1
Inventory ü
HW Cabinet ü
ZTE RACK ü
Focus Power Plan ü
wifi ü
transmision ü
A/Cs ü
tower light ü
Inverter ü
panel box ü

Test
Hw Battery ü
ZTE BatteryGenset ATS ü
Focus Battery ü
Tower light ü
Yard Light ü

Misc Tasks
Clean Cabinet ü
Inspect / clean genset ü
Clean Building ü
Inspect Antennas ü
check Azimuth ü
Check Tilt ü
Check EMS LTE Alarms ü
Check EMS UMTS Alarms ü
Check EMS Radio Link Alarms ü
Check BSC CDMA Alarms ü
Check CN Maestro ü
IP: 172.20.19.6 ü
IP: 172.20.19.21 ü

Tower
lightning Arrester ü
Equipment Grounding ü
Tower general structure ü
Pictures ü
general view ü
compound ü