WORK DESCRIPTION
Volts Amps
e0 Battery Load Test - measure voltage at start w/ AC Test for 120mins
No AC 53.93 9.22
after 10 min 52.82 -12.65 0:00
after 20 min 50.55 -13.39 1:10
after 30 min 50.65 -13.24 1:20
after 40 min 50.65 -13.24 1:30
after 50 min 50.53 -13.39 1:40
after 60 min 50.58 -13.39 1:50
after 70 min 50.52 -13.69 2:00
after 80 min 50.49 -13.54 2:10
after 90 min 50.34 -13.39 2:20
after 100 min 50.26 -13.39 2:30
after 110 min 50.15 -13.54 2:40
after 120min 50.05 -13.69 2:50
5 POWER DISTRIBUTION
Port Breaker Size Cable Size Description Commnets
a. Port 0 4 NA NA
b. Port 1 4 NA NA
c. Port 2 12 12 AFMU
d. Port 3 12 12 BBU
e. Port 4 20 NA NA
f. Port 5 20 NA NA
g. Port 6 20 10 DC SPRU SECT GAMA
h. Port 7 20 NA NA
i. Port 8 20 NA NA
j. Port 9 20 10 IPRAN PWR
7 INSPECTION OF CABINET
OK Fault COMMENTS
a. Doors, locks and hinges √
b. Interior dust free √
c. Rectifiers √
d. Cables √
e. Cooling Unit √
f. Filters √
g. Grounding √
e. Access holes √
COMMENTS
ZTE Equipment (LTE & UMTS)
SITE NAME - TIGER TOWN
WORK DESCRIPTION
5 DCPD6
Port Breaker Size Cable Size
Port 1 20A NA
Port 2 20A NA
Port 3 20A 12
Port 4 20A 12
Port 5 20A 12
Port 6 20A 10
Port 7 20A 10
Port 8 20A 10
Port 9 20A 14
uipment (LTE & UMTS)
NUMBER - 1019
WORK DESCRIPTION
FORMATION COMMENTS
ELEC. TILT [UMTS_LTE] MEC. TILT
0 8
4 7
6 7
[LTE] COMMENTS
Optical Power (dBm)
RX
-5.18
-4.99
-5.53
UMTS] COMMENTS
Optical Power (dBm)
RX
-6.89
-9.04
-7.58
DCPD6
Description Commnets
NA OFF
NA OFF
PWR GAMMA ON
PWR BETA ON
PWR ALPHA ON
FDD PWR S3 ON
FDD PWR S2 ON
FDD PWR S1 ON
PM3 PWR ON
Broadband - WIFI
SITE NAME - TIGER TOWN NUMBER - 101
WORK DESCRIPTION
LSW1
TAG 4644 5905
DL 163.7 163.41
UL 840.66 840.63
1 ANTENNA INFORMATION
HEIGHT -METERS/FEET AZIMUTH TILT
a. AP1 330ft 45 6
b. AP-1C 330ft 45 6
c. AP-1D 330ft 45 6
d. AP-2 330ft 45 6
e. AP-2B 330ft 345 6
f. AP-2C 330ft 345 6
g AP-2D 330ft 34 6
LOAD OK Fault
a. Inverter INV 1 √
b. Inverter INV 2 √
FI
NUMBER - 1019
COMMENTS
OE n INVERTER
COMMENTS
gets power from switch
gets power from switch
gets power from switch
gets power from switch
gets power from switch
gets power from switch
gets power from switch
COMMENTS
Tower
SITE NAME - TIGER TOWN
WORK DESCRIPTION
Tower Type: SELF SUPPORT
Height: 330 Ft
1 TOWER INSPECTION
2 TOWER INVENTORY
Height Alpha Beta
340 lightening Arrestor
330 CDMA ANTHENA & RRU AP2, AP2B, AP2 & AP2D
330 AP1, AP1C, & AP1D CDMA ANTHENA & RRU
330 UMTS, LTE ANTHENA & RRU UMTS, LTE ANTHENA & RRU
300
280
260
240
220
200
180
160
140
120
100
80
60
40
20
0
Tower
NUMBER - 1019
WORK DESCRIPTION
TOWER INSPECTION
OK FAULT COMMENTS
√
√
√
√
√
√
√
√
N/A
COMMENTS
Beta Gamma
lightening Arrestor
P2, AP2B, AP2 & AP2D UMTS, LTE ANTHENA & RRU
DMA ANTHENA & RRU CDMA ANTHENA & RRU
TS, LTE ANTHENA & RRU
Port Allocation
SITE NAME - TIGER TOWN
WORK DESCRIPTION
31 FORTINET 200F
WORK DESCRIPTION
PORT DESCRIPTION
2 AFMU
3 BBU
6 DC SPRU SECT GAMA
9 IPRAN PWR
1 PT1-IPRAN
1 IPRAN
10 AP1- 1C
12 AP-1D
14 AP-2C
16 AP-2D
CARD 3 Port 2
CARD 3 Port 3 Ceragon IDU Main- Bmp-Tea Elec Port 1
CARD 4 Port 1 FEO CMPT
CARD 4 Port 2 ETH-0 LPU
CARD 4 Port 3 TIGER TOWN LSW Port 1
CARD 4 Port 4 ZTE LSW MNGT
CARD4 Port 5 Mikrotik P1
CARD 4 Port 6 Mikrotik P24
CARD 4 Port 7 PORT1 MIKROTIK 5905
CARD 4 Port 8 ELTEK POWER PLANT
CARD9 PORT1&2 ODF1
CARD10 FGT_X1 TO IPRAN-PT10
11 PORT3&4 ODF 1 UNITEDVILLE
12 PORT1&2 ODF1 HTV
X1 FGT_X1 TO IPRAN-PT10
X2 JUSHER 10G SCN ODF P8
#2 PORT 1-#4 PORT 1 SLOT 3, PORT 3
FIBER DESCRIPT
SITE NAME - TIGER TOWN
WORK DESCRIPTION
Source ODF
No. Tube Strand
CCV 1
2
3 IPRAN SLOT 3 PORT 2
4
5
6
7
8
9
10
11
12
R DESCRIPTION
NUMBER - 1019
WORK DESCRIPTION
Fiber Destination
Strand Tube No.
1 IPRAN CARD 11
2 IPRAN CARD 11
3 IPRAN CARD 9
4 IPRAN CARD 9
5 IPRAN CARD3
6 IPRAN CARD 3
7
8 USHER 10G
9
10
11
12
Spliced Fiber
Strand Tube No.
↔ 1
↔ 2
↔ FORTINET SCN ODF P8 3
↔ 4
↔ 5
↔ 6
↔ 7
↔ 8
↔ 9
↔ 10
↔ 11
↔ 12
Destination
Generator
SITE NAME - TIGER TOWN NUM
WORK DESCRIPTION
Preload checks
1. Check control panel for active alarms √
2. Record trickle charger voltage
3. Check base tank / day tank fuel level
4. Check bulk tank fuel level
5. Inspect fuel lines for leaks √
NOT GOOD
Record if further action is needed
Record if further action is needed
Record if further action is needed
Record if further action is needed
Record qty added
Record qty added
Record qty added
Drain if necessary
ments
Hz
Volts
Volts
Hz
Hrs
deg F
psi
psi
NOT GOOD
NOT GOOD
NOT GOOD
Power Plant
SITE NAME - TIGER TOWN
WORK DESCRIPTION
AMP-HOUR MANUFACTURAR
BATTERY 1 150Ah MASTER SAFE
BATTERY 2 150Ah MASTER SAFE
BATTERY 3 150Ah MASTER SAFE
BATTERY 4 150Ah MASTER SAFE
BATTERY 5 125Ah MARATHON
BATTERY 6 125Ah MARATHON
BATTERY 7 125Ah MARATHON
BATTERY 8 125Ah MARATHON
BATTERY 9 125Ah MARATHON
BATTERY 10 125Ah MARATHON
BATTERY 11 125Ah MARATHON
BATTERY 12 125Ah MARATHON
POWER PLANT
General
Ensure that equipment racks are level and properly bolted down
Ensure that equipment racks are clean and dust free. Clean as necessary
Ensure that all covers are in place and properly secured
Power Modules
Visual inspection of installed power modules for alarms. Record if found
Reset any modules with alarms as specified by manufacturer. Replace if necessary
Record number of power slots available, number in use and spare positions
Load Audit
Open Load Distribution Center
Record available number of distribution positions, in use and spare
Record breaker size, cable size and breaker position of positions in use
Ensure proper lug is used ( single, double ) and bolts are properly tightened
BATTERIES
General
Ensure that battery racks are level and properly bolted down
Ensure that battery racks are clean and dust free. Clean as necessary
Ensure that all covers are in place and properly secured
Cells
Individually inspect each battery for heat buildup, swelling, leakeage, venting
Individually inspect each battery post for intergrity
Individually inspect each battery post for proper torqueing. Retorque if necessary
Manually inspect battery interconnects for heat buildup
Record voltage, temperature and internal resistance / conductance for each battery
Load test
Record battery voltage across each battery string
Fail AC supply
Record battery voltage across each battery string
With AC supply off repeat voltage readings across each string every 10 mins for 1 hour
Restore AC supply
Record load current and system voltage upon AC supply return
Wait until load current drops back to pre load test value. Record time
Ensure that all loads are on line and back to normal
Ensure there aren't any alarms present. Address if found
Battery Discharge Record Shee
Date:
Site: SITE NAME - TIGER TOWN
Bank # 2
Pictures
Batteries
Load Center
Controller Readings
Alarms
er Plant
NUMBER - 1019
RK DESCRIPTION
OK NK Comments
ü
ü
ü
ü
ü
ü
ü
ü
ü
___2__ Available __7____ In use ____0___ Spare
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
____44___ Amps ___53.98__ Volts
___1___ Min
ü
ü
Building and Compound
SITE NAME - TIGER TOWN
WORK DESCRIPTION
FENCE
No. Item Status Action Needed
4 Drainage ports
G
COMPOUND
1 Fire Break ( if applicable )
G
2 Bushing
G
3 Access way(s)
G
4 Culvert(s)
G
5 Drain(s)
G
7 Garbage disposal
NONE
8 Compound cleanliness
G
4 Rails
G
5 Doors
G
6 Door Locks
NG
7 Roof
G
8 Eves
N/A
9 External Lights
G
10 Internal walls
G
11 Interior Painting
G
12 Interior Floor
G
BUILDING ( cont )
13 Interior Ceiling
G
14 Interior Lights
G
15 Windows ( if applicable )
N/A
16 Louvers ( if applicable )
N/A
19 Plumbing ( if applicable )
N/A
20 Furniture ( if applicable )
N/A
21
AC 1
WORKING GOOD
Air Condition
WORKING GOOD
AC 2
23 Fire Extinguishers
N/A
N/A
26 Smoke Detectors
N/A
27 Interior Cleaning
N/A
RROUNDING AREA
Comments
0
Main Ground Grid
Open Handhole
Inspect handhole, metal brackets, insulators, bus bar(s), ground cables, nuts & bolts
Replace, repair or maintain damaged/ faulty material as necessary
Disconnect cables from bus bar, polish bus bar, and apply No-Oxide grease. Reinstall bus bars
Check cables for proper crimping and reconnect to ground bar. Ensure adequate torque
Ensure cables are properly labelled. Relabel as necessary
Tower Ground
Inspect tower leg grounds to ensure cable integrity and proper installation
Inspect grounding plates and nuts & bolts. Service, repair or replace as necessary
Inspect equipment ground cable running up the tower for cable integrity and proper installation
Inspect lightning arrestor ground cable for cable cable integrity and proper installation
Megger grounding cable on each tower leg
i
OK NK Comments
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
Leg 1 __0.6___ Leg 2 ___0.5____ Leg 3 ____1.0______
Material Qty
Door Locks 1
Inventory ü
HW Cabinet ü
ZTE RACK ü
Focus Power Plan ü
wifi ü
transmision ü
A/Cs ü
tower light ü
Inverter ü
panel box ü
Test
Hw Battery ü
ZTE BatteryGenset ATS ü
Focus Battery ü
Tower light ü
Yard Light ü
Misc Tasks
Clean Cabinet ü
Inspect / clean genset ü
Clean Building ü
Inspect Antennas ü
check Azimuth ü
Check Tilt ü
Check EMS LTE Alarms ü
Check EMS UMTS Alarms ü
Check EMS Radio Link Alarms ü
Check BSC CDMA Alarms ü
Check CN Maestro ü
IP: 172.20.19.6 ü
IP: 172.20.19.21 ü
Tower
lightning Arrester ü
Equipment Grounding ü
Tower general structure ü
Pictures ü
general view ü
compound ü