IMMEDIATE ACTION
1. Barricaded the area and movement of person immediate stopped
2. Concrete from TM started get down with the help of tough rider till the empty of TM.
3. Clear the soil and boulders beneath the wheel.
4. TM was driven in reverse position and get free from stuck
E'
fatmH. R' Construc'tiotr
,ffi"J.r.
<=>2,r;4
ProP' H' P' Pawali
lNSERT PHOTOS
/
ROOT CAUSE
1. Vehicle movement path not defined
2. Non compaction of ground
3. Lack of supervision
ffiFs$uo,l=l*i
Vehicle movement path shall be defined. RR Construction 27"'June2020
Compaction of vehicle movement path shall be done. RR Construction To be discussed
SIGNATURES
lnvestigating Officers Shrikant Nalawade Position Project Manager
Name
Signature Shrikant Nalawade Date 25-June-2020
nvestigating Officers
I Davalsab Kumbhar Position Safety officer
Name
Signature Davalsab Kumbhar Date 25-June-2020
fgr B. R. Construction