Abu Raya-UTC Residence

BUDGET
MAY, 2023
ITEM AMOUNT NAME NOTES

1.Excavation and earthwork


1.1 Site Preparation
Clean site completely of any waste, refuse, and
65,000.00 Mohamed Thabet
garbage, and remove all debris outside the site
and land leveling work as drawings.

2.Demoilish & Constructions:


2.1 Demolish
Demolish and haul debris from site
gypsumand/ or block partition on walls and
any materials attached to them, such as tiles…
etc. 25,000.00 Mohamed Thabet

2.2 Masonry
supply and build bricks (12-25)cm thick, for
the new requested walls as shown on drawings.
Job includes plastering.

Total 90,000.00