A,SUBSTRUCTURE
1,MASONARY STONE WORK
2,DEMOLISHING WORK
Filling by dumping with selected material from the site or from the querry site.if Imported
material, the unit rate shall include all materials within the entire excavation, for
transporting materials within the free haul distance of 5km, and for preparing,Levelling
and compacting the material to the specified densities.If nesseccery used roller to
2.1 compacting well and levelling the surface. m3 180 417.93 75,227
Carefully dismantle the existing cobel stone road and cart away of unwanted material as
per Engineers direction.After carefully removing make ready to construct new cobel stone
road paving.The unit price include selected material from quarry site well rolled, levelled
2.2 and compact. M2 2,000 135.18 270,360
Sub Total…………………………………birr 345,587
Supply and spread 5 to 7cm base course of fine crashed aggregate size 01 from
stone crusher site , keeping the design slope so as to enable cobblestone paving
1.1 following the slope.
a-if nessaccery use new size 01 material from crusher site. M2 2,000 67.42 134,840
2.Cobblestone Paving
Repair and lay to the required level 10x10x10 cm shaped cobble stone which handed
over during the desmtling of the existing cobelstone road of as per the layout, design &
slope for the main body of the road 15x10x10 cm shaped edge cobblestones following the
2.1 design pattern of the cobble stones road pavement. M2 1,500 100 150,000
a-if nessaccery use new size 10x10x10 cm shaped cobble stone to replace
2.2 losting from the main body of the existing cobelstone road. M2 500 -
Supply,fill and compact fine crushed aggregate of size 00,to the 10mm spaces or voids
between the cobblestones to prevent the movement of the stones due to traffic and
3.1 make the pavement stiff. The surface should be cleaned afterward M2 2,000 89.87 179,740
4.Curb stone
fix the demolished 15x25 cm shaped curb stones,at every 20m interval across the
walkway pavement and sidewalk, along both sides of the road with a cement mortar base
of 1:4 mix and backed with C-15 concrete on the external sides of the road , for support,
4.1 as shown in the design and fill joints with cement mortar of 1:4 mix. ML 150 235.16 35,274
Sub Total…………………………………birr 499,854
MAINTENANCE OF EXISTING COBBLESTONE PAVEMENT
BILL AND SPECIFICATION OF QUANTITY
AWADAY SUB CITY MUNICIPALITY 2016 PROJECT
TOTAL SUMMARY OF PROJECT