LOCATION:- Batu
SUMMERY
A) COBLESTONE ROAD CONSTRACTION
ML 542.00 0.00 0
Sub-total:------------------------------------------------- 0
2 SITE CLEARING AND EARTHWORK
2.1 Site Clearing and Grubbing
Remove trees, tree roots, bushes, big stones, grass and other obstacles
within road width of the road reserve to allow movement of workers for
smooth surveying and setting out works. Those trees to be retained, as
ordered by the Engineer, will be kept undamaged. The material or debris as
a result of clearing and grubbing will be deposited to the location as
directed by the engineer.
Sub-total:------------------- Err:509
Compacted cobble stone paved Carage way with rullo /by heavey roller
directed by the engineer and wake way by hand compacter ,to raise the
level of the road fixed by the engineer or as per the Road design to the
specification.
M2 5420.00 Err:509 Err:509
Sub-total:------------------------------------------------- Err:509
LOCATION:- Batu
SUMMERY
Err:509
2 SITE CLEARING AND EARTHWORK Birr Err:509 0 Err:509
Err:509
3 BACK FILL Birr Err:509 0 Err:509
Err:509
4 COBBLESTONE PAVING AND ATHER FINSHING WORK Birr Err:509 0 Err:509
0
5 STROM WATER DRAINS Birr Err:509 0 0
0
6 COMPACTION Birr Err:509 0 0
Err:509
VAT(15%):--------- Birr Err:509 0 Err:509
Err:509
TOTAL WITH VAT:---------- Birr Err:509 0 Err:509
Prd:- Sefu T.
PROJECT :- From along hospital coble stone road to Batu Elemetary no. 2(kera) school
Description Unit Quntity Excuted Qty U/Price Amount
A) COBLESTONE ROAD CONSTRACTION
1 SURVEYING AND SETTING OUT
1.1 Surveying,Leveling And Setting Out
Fix Station points, PI, at 100-200m intervals for reference of the Centerline
of the Road. Where there is a Horizontal curve or vertical curve the
interval of the PIs will be less than 100 m Befor excution of any work of
coble stone road constraction and Fix centerline of the road by putting
pegs at 20m intervals including setting of horizontal and vertical
curves.Set out also cross-section of the road at 20m intervals or less as
convenient, if terrain is very ragged, by placing pegs on center, two sides
and drainage lines of the road as well as following design patterns of the
cobblestone Afte finishing the excution of erthwork for coble stone road ML 412.00 232.00 0.00 0
constraction and Gathered nessesery data such as OGL/NGLand Dich bed
elvation surveying data by the interval of 20m for Masinary Dranage.Fix
Levelling /Setting out using levelling insturment/other insturment for
laying out the slope of drainage bed according to your surveying data for
Masinary Dranage. The price including all works wich described above.
Sub-total:------------------------------------------------- 0
2 SITE CLEARING AND EARTHWORK
2.1 Site Clearing and Grubbing
Remove trees, tree roots, bushes, big stones, grass and other obstacles with
17m width of the road reserve to allow movement of workers for smooth
surveying and setting out works. Those trees to be retained, as ordered by
the Engineer, will be kept undamaged. The material or debris as a result of M2 4120.00 1160.00 39802.50
clearing and grubbing will be deposited to the location as directed by the
engineer.
46170900
2.2 Top Soil Excavation 0
Excavate the top 5-10 cm top soil to remove the soil with grass and organic
layer of the soil which is very weak, compressible and not required for
road construction. The excavated material will be deposited at a place M3 412.00 0.00 Err:509
directed by the Engineer.
Err:509
2.3 Cut and fill soft Material 0
Excavation to the level and compaction in between the slots
(cutting/excavation) 10-20cm, leveling and embankment, compaction and
preparing the subgrade] and compacter must be heavey M3 824.00 1520.00 46.60
roller/compacter.
70832
2.4 Load and Cartaway surplus excavated materials from the site to a distance
not exceeding 5km,directed by engineer.
M3 2060.00 Err:509 Err:509
Err:509
Sub-total:------------------------------------------------- Err:509
Prd:- Sefu T.
3 BACK FILL
3.1 Sub Base -layer
3.2 Base-layer(Red ash)
Supply, spread 10-30cm,Redash baselayer as directed by the Engineer. M3 618.00 Err:509 Err:509
Err:509
3.3 Base-layer(fine crushed aggregate) 0
Laying under cobblestone paving and Supply, spread to level 5 to 7 cm
base course, fine crushed aggregate from stone crusher site, keeping the
design slope so as to enable Cobblestone paving following the slope. M2 4120.00 Err:509 Err:509
Err:509
0
Sub-total:------------------------------------------------- Err:509
4 COBBLESTONE PAVING AND ATHER FINSHING WORK.
4.1 Cobblestone Paving
Prd:- Sefu T.
PROJECT :- From Yohannes Torneteryl to end fence of Public Library(FHI) with one side masonery
drainage
Procurement Reference Number:- Batu /ULGDP-II/ W-007/2010
Summery of Bill of Quantity and Specification
1 Setting Out Birr
2 Excavation Birr
3 Masonory work Birr
4 Concrete work Birr
5 Renforcment. Birr
6 Formwork. Birr
Total Amount For RCC Single Slab cover Birr
Total amount for 2 (Two) RCC slab cover(culvert)
VAT
TOTAL with VAT
-
s.no . Descripition unit Quatity unit rate(ETB)
Amount(ETB)
Setting Out
Setting out the space of constraction. ml 8.00
SUB-TOTAL:-_______________________________
2 Excavation
2.1
For Aditional Trench excavation in ordinary soil to a depth of
m3 15.30
1200mm from NDL ground level.to one side of the Dranage .
back Fill under lean concret And Around masory wall with
imported and non expansive material 20% from the site and
2.2 M3 1.04
80% borrow selected materials from outside well rolled and
compact .
Load and Cartaway surplus excavated materials from the site
2.3 M3 14.26
to a distance not exceeding 5km
SUB-TOTAL:-_______________________________
3 MASONRY WORK
construct hard trachytic roughly dressed stone masonry wall
3.1 800mm below ground level bedded in cement mortar mix m3 7.68
ratio (1:3)
SUB-TOTAL:-------------------------------------------------
4 Concrete work
supply and provide Renforcment concrete quality C-25 for
4.1 m3 5.20
250mm thick RC slab.
4.2 supply and provide 5mm thick top Plastering with ratio of 1:3. m2 20.80
SUB-TOTAL:-------------------------------------------------
5 Renforcment.
5.1 16 diameter of renforcment bar . kg 1,000.00
SUB-TOTAL:-------------------------------------------------
6 Formwork.
6.1 Wooden/ Steel formwork . m2 25.20
SUB-TOTAL:-------------------------------------------------
Grand Total
Prd:- Sefu T.
PROJECT :- From Yohannes Torneteryl to end fence of Public Library(FHI) with one side masonery
drainage
Procurement Reference Number:- Batu /ULGDP-II/ W-007/2010
Summery of Bill of Quantity and Specification
1 Setting Out - Birr
2 Excavation - Birr
3 Masonory work - Birr
4 Concrete work - Birr
5 Renforcment. - Birr
6 Formwork. - Birr
Total Amount For RCC Single Slab cover - Birr
Total Amount For One RCC Slab cover(Culvert)
VAT
TOTAL with VAT
back Fill under lean concret And Around masory wall with
imported and non expansive material 20% from the site and
2.2 M3 2.08
80% borrow selected materials from outside well rolled and
compact .
Load and Cartaway surplus excavated materials from the site
2.3 M3 30.10
to a distance not exceeding 5km
SUB-TOTAL:-_______________________________
3 MASONRY WORK
construct hard trachytic roughly dressed stone masonry wall
3.1 800mm below ground level bedded in cement mortar mix m3 15.36
ratio (1:3)
SUB-TOTAL:-------------------------------------------------
4 Concrete work
supply and provide Renforcment concrete quality C-25 for
4.1 m3 10.40
250mm thick RC slab.
4.2 supply and provide 5mm thick top Plastering with ratio of 1:3. m2 41.60
SUB-TOTAL:-------------------------------------------------
5 Renforcment.
5.1 16 diameter of renforcment including all cost. kg 1,300.00
SUB-TOTAL:-------------------------------------------------
6 Formwork.
6.1 Wooden/ Steel formwork . m2 49.20
SUB-TOTAL:-------------------------------------------------
Grand Total
Prd:- Sefu T.
Takeoff Sheet
Project:- Cobblestone Road from back side of Hara Dambel Hotel to Tessema Hotel
Re LWD Prod. Units Description Rep LWD Prod. Units Description
p
Base layer(Red-ash) 3.2)Filling Voids by Crushed Fine
1 80 2.1.1)Supply and spread selected 1 80 3.2.1) supply 5-7cm finely crushed stone
granular red ash 15-20 thick under to fill voids between cobble stone (for
lane way. lane way).
3)COBBLESTONE PAVING
1 80
3.0.1)Supply and pave approved
quality of 10x10x10 cm cube
shaped coble stone made of hard
core rock. Quality will checked
through test (On lane way).
14.50 1160 m2 Total sum
1 120 3.1.1)Supply and pave approved
quality of 10x10x10 cm cube
shaped coble stone made of hard
core rock. Quality will checked
through test (On walk way).
360 m2 Total sum
3
As per the attached measurements the value of work executed and/or materials
supplied to date is: Total Sum with VAT Todate Err:509
Paynt. Amount Deductions/Additions
No. Date (Birr)
1 1 Previous Payment -
2 2 Advance Repaid (20%) Err:509
3 4 Retention (5%) Err:509
4 5 Penalty
SUMMERY
item description Contract Previous Now Total Todate Total
executed Total
no agrement amount(Birr) amount(Birr) amount(Birr)
1 Excavation & Earth Work Err:509 - Err:509 Err:509
2 Masonery work Birr
Err:509 - Err:509 Err:509
3 Concrete Work Birr
- - #REF! #REF!
4 Finishing work Birr
Err:509 - Err:509 Err:509
TOTAL - :---------------------- Birr Err:509 - Err:509 Err:509
VAT(15%):-------------------- Birr
Err:509 - Err:509 Err:509
TOTAL WITH VAT:------------ Birr
Err:509 - Err:509 Err:509
SUMMARY OF BILL OF QUANTITY AND SPECIFICATIONS
Project : Pedestrain Walk Way from Asir Aleka Mekonnen to BGI Store
Client : Adola Woyu Municipality
Location : Oda Dola Kebele
Length : 150m
GRAND SUMMARY
A. TERRAZZO PAVEMENT WORK
1. EXCAVATION & EARTH WORK……… BIRR 286,631.25
2. CONCRETE WORK……………..…………… BIRR 84,973.14
3. FINISHING WORK…………...……………… BIRR 1,292,415.00
TOTAL A BIRR 1,664,019.39
B. RETAINING WALL WORK
1. EXCAVATION & EARTH WORK……… BIRR 109,552.35
2. CONCRETE WORK……………..…………… BIRR 29,145.00
3. MASONRY WORK……………………………… BIRR 618,067.50
TOTAL B BIRR 756,764.85
C. SEAT AND SHADING WORK
1. SEATING WORK………………………………… BIRR 84,336.80
2. SHADING WORK……………..……………… BIRR 35,580.54
TOTAL C BIRR 119,917.34
TOTAL A + B + C 2,540,701.58
15% VAT……………………. BIRR 381,105.24
1.2
Top soil excavation(cut) to a depth of 25cm - 30cm & level the surface
with heavy machine (grader) compact with 16 tons roller machine to M3 225.00 176.90 39,802.50
the maximum compaction density.price includes,showering & soil test.
1.3 Load and Cartaway surplus excavated materials from the site to a
M3 225.00 127.70 28,732.50
distance directed by engineer.
1.4 Supply, spread and compact 15cm thick sub-base granular material
from approved borrow sites and compacting to specified camber and M3 112.50 357.30 40,196.25
width to 98% of modified AASHTO density.
1.5
supply,laying & spread fine crushed aggregate to make level under
terazzo paving with 7-10cm thick by keeping the design slope so as to M2 750.00 237.20 177,900.00
enable terazzo paving.
Sub-total 286,631.25
2. Concrete work
2.1 C-25,360kg/m3,filled in to form work & vibrated -
a
60x20cm C-25 class of concrete at the edges of terazzo pavement and
for a purpose of expansion joints between terazzo pavements as per
M3 4.20 11,646.70 48,916.14
site supervisor instruction. Price shall include 30cmx30cm trenching
for concrete.
3.3 Construct 40cm high greenery coverings above terrazo pavement using
12cm thick Brick Wall ( Size 6x12x24 cm ) according to drawing.
Price shall includes 15x20cm concrete bedding for bricks and pointing M2 40.00 2,623.50 104,940.00
of all exposed surface of brick wall in cement sand mortar of 1 : 3
3.4 Supply and Plant variety of partially grownTrees & flowers planting of
selected variety. (indigenous trees requiring limited or no watering) for
outsideof footpath and to a location shown on the drawing. No 25.00 6,000.00 150,000.00
Sub-total 1,292,415.00
B. RETAINING WALL WORK
1. Excavation & Earth Work
1.1
Trench excavation for masonry retaining wall to a depth not exceeding
70 cm from reduced level including 25cm work space and can be M3 73.50 482.40 35,456.40
recommended by suppervisor of the site.
1.2
Back fill and compact both sides of stone masonry Retaining wall with
M3 63.00 279.30 17,595.90
selected materials from site to a layer not exceeding 20cm thick.
1.3
Load and Cartaway surplus excavated materials from the site to a
M3 10.50 124.10 1,303.05
distance directed by engineer.
1.4 20cm thick grouted stone pavement under retaining wall bedded and
jointed wth 1:3 cement mortar ratio M2 90.00 613.30 55,197.00
Sub-total 109,552.35
2. Concrete work
2.1 5cm thick lean concrete with 150kg/m3 under retaining wall. M2 75.00 388.60 29,145.00
Sub-total 29,145.00
3. Masonry work
3.1 Construct Averege 40cm thick at the top and 50cm at the bottom with
required elevation.hard trachytic or equivalent stone masonry
Retaining wall jointed and bedded in cement sand mortar (1:3) ratio. M3 97.50 5,981.80 583,225.50
Price includes pointing and painting of the exposed masonry surface
and accessory steps for each and every houses.
3.2 40cm width and 5cm thick copping on top of stone masonry Retaining
wall in cement sand mortar (1:2) M2 60.00 580.70 34,842.00
Sub-total 618,067.50
C. SEAT AND SHADING WORK
1. Seating Work
1.1
Fabricate and mount sittings along pedestrain walkways using
50x50x3mm steel members and 20x3cm thick timber battens
according to structural drawing , price shall include one coat of anti
rust and two coats of synthathic enamel painting, varnishing the
battens, final paint(a colour type shall approved by site supervisor) and No 2.00 42,168.40 84,336.80
fixing timber battens by bolts to a sitting steels and concrete for steel
legs and all accessories. (The seat must be fabricated out of working
site and then brought and erected carefully and the locations for
seatings shall be comfirmed by site supervisor)
Sub-total 84,336.80
2. Shading Work
2.1 Suppply, assemble and mount 12cmx12cm Tsid wood post to provide
seat shade as per the detial drawing. price shall include concrete for
post foot , varnishing every members, one coat primer and two coats M 20.00 521.40 10,428.00
of oil paint and two coat of final paint (a colour type shall approved
by site supervisor) and all accessories.
2.2 Supply and fix 5x7cm zigba wood purlins to a posts according to
structural drawing , price shall include one coat primer and two coats
of oil paint and two coat of final paint (a colour type shall approved M 40.00 145.70 5,828.00
by site supervisor) and all accessories.
2.3 Plastic/Mica roof cover nailed to zigba purlins and roof measured in
horizontal projection and all necessary accessories.( Quality, type, M2 15.40 1,254.84 19,324.54
color and pattern of roofing shall approved by site supervisor)
Sub-total 35,580.54
PREPARED BY APPROVED BY
Take-Off Sheet
Project:-Pedesterian walk way from Tewodros Alemayehu lodge to end of Kanophi Resort ( Lot-8-) of 2015
Rep LWD Prod. Units Description Rep LWD Prod. Units Description
A)Earth Work 1 0 3.4) A)40*10cm size concerete curbstone for walk
way
188.65 188.65 ml 1.1)Fix points 1.00 0 m2
188.65 1.2) clearing off site - m2 Total sum
8
1509.20 m2 Total sum 1 0 3.5)Provide,cut & fix in position sawn zigba or sheet
metal panel formwork to
1.3)Top soil excavation 10.00 - m2 Total sum
1.3) Top soil excavation to depth 20-25cm & level
the surface with heavy machine (grader) compact
with 16 tons roller machine to the maximum
compaction density.price includes,showering & soil
test.
1 188.65
0.3
8
452.76 m3 Total sum
188.65
2 1.4)Trench excavation
0.3
0.625
70.74 m3 Total sum
1 188.65 1.5 )Backk fill under walking area selected material
0.8 fill from approved source & well rolled every 30cm
interval.
8 1207.36 m3 Total sum
SUMMERY
item description Contract prev.paid amount Now Total total update paid in
no agrement amount amount
1 earth work and setting out Birr
Err:509 Err:509 - Err:509
site clearing and earth work
Err:509 Err:509 - Err:509
2 back fill Birr
Err:509 65,240.00 Err:509 Err:509
3 Cobble stone paved Birr
Err:509 427,147.10 14,960.00 442,107.10
TOTAL Birr
- :---------------------- Err:509 Err:509 Err:509 Err:509
Birr
VAT(15%):-------------------- Err:509 Err:509 Err:509 Err:509
TOTAL WITH Birr
VAT:------------ Err:509 Err:509 Err:509 Err:509
CERTIFICATE OF PAYMENT 3
Date: 25/ 08 / 2011 E.C
Sheet: 3
Certificate of payment No.: 3
Project:- Cobblestone Road from back side of Hara Dambel Hotel to Tessema Hotel Amount(Birr)
Location:- Batu with Proc.Ref.No.:-Batu/ULGDP-II/W-08/2011
Client:- Batu City Administration,Municipality Office Main Contract 1,158,328.080
Contractor:- Berisa,Kuftu and friends GC-9(MSE) EWW Supplementary Contract
Consultant(Supervisor): - Terefe G. Variation Orders
Vat(15%) 173,749.21
Total Sum with vat 1,332,077.29
As per the attached measurements the value of work executed and/or materials
supplied to date is: Tota todate with VAT Err:509
Payment Amount Deductions/Additions
No. Date (Birr)
1 15-07-2011 287,829.67 1 Previous Payment 620,330.61
2 1/8/2011 332,500.94 2 Advance Repaid (20%) Err:509
3 4 Retention (5%) Err:509
4 5 Penalty
Top soil excavation(cut) to depth 25cm - 30cm & level the surface with heavy machine length = 150m
1 150 (grader) compact with 16 tons roller machine to the maximum compaction density.price width = 5m
5 includes,showering & soil test. depth = 0.3m
0.3 225.00 m3
1 150 Supply, spread and compact 15cm thick sub-base granular material from approved borrow
sites length = 150m
5 width = 5m
0.15 112.5 m3 depth = 0.15m
1 0 Fill & compact 5-7cm thick red-ash (scoria) in walk way area on the top of compacted
selected granural fill.
0
0 - m3
1 150 supply,laying & spread fine crushed aggregate to make level under terazzo paving with 7- length = 150m
10cm thick by keeping the design slope so as to enable terazzo paving. width = 5m
5 750.00 m2
2. Concrete work
60x20cm C-25 class of concrete at the edges of terazzo pavement and for a purpose of
5 7 expansion joints between terazzo pavements as per site supervisor instruction. length = 7m
0.2 width = 0.2m
0.6 4.2 m3 depth = 0.6m
2 7 Formwork for 60x20cm C-25 class of concrete at the edges of pavement and for a purpose of length = 7m
expansion joints between terazzo pavements as per site supervisor instruction depth = 0.6m
5 0.60 42.0
3. Finishing work
1 150 supply,laying & spread fine crushed aggregate mixed with cement paste under terazzo length = 150m
paving, tickness of 5-7cm by keeping the design slope so as to enable terazzo paving. width= 5m
5.00 750.0
Provide and lay terrazzo tiles of size 30x15x5cm (thickness to be specified by manfacturer)
and 60cm wide handicap terrazzo to accessible peoples with disabilities laid on fine
1 150 aggregate mixed with cement paste. Price shall includes materials and labour of good quality length = 150m
(color & pattern shall approved by site supervisor) and line drains of approved size by site width= 5m
supervisor at the edge of terazzo pavement where necessary and Price shall includes all
possible accessories.
5.00 750.0
1 4 Construct 40cm high greenery coverings above terrazo pavement using 12cm thick Brick length = 4m height=
Wall ( Size 6x12x24 cm ) according to drawing. 0.4m
25 0.40 40.0
25 1 Supply and Plant variety of partially grownTrees & flowers planting of selected variety.
(indigenous trees requiring limited or no watering) for outsideof footpath and to a location NO. 25
shown on the drawing.
25.0
B. RETAINING WALL WORK
1.Excavation&Earth work
Trench exca.
1 73.50 +
Cart away surplus excavated material Back fill
63.0 -
10.50 m3
1 150 20cm thick grouted stone pavement under retaining wall bedded and jointed wth 1:3 cement length = 150m
mortar ratio width = 0.6m
0.6 90.00 m2
2. Concrete work
1 150 length = 150m
5cm thick lean concrete quality C-5, 150 kg of cement/m3
0.50 75.0 m2 width = 0.5m
3. Masonry work
1 150 Construct Averege 40cm thick at the top and 70cm at the bottom with required length = 150m
elevation.hard trachytic or equivalent stone masonry Retaining wall jointed and bedded in width = 0.5m
0.50 cement sand mortar (1:3) ratio. depth = 1.3m
1.3 97.50 m3
Copping
1 150 40cm width and5cm Cement sand mortar ( 1:2) Copping on top of masonary length = 150m
0.4 60.00 m2 width = 0.4m
Fabricate and mount sittings along pedestrain walkways using 50x50x3mm steel members
and 20x3cm thick timber battens according to structural drawing , price shall include one coat
of anti rust and two coats of synthathic enamel painting, varnishing the battens, final paint(a length = 20m
colour type shall approved by site supervisor) and fixing timber battens by bolts to a sitting
steels and concrete for steel legs and all accessories.
2 1.00 2.0 No
2. Shading Work
Suppply, assemble and mount 12cmx12cm Tid wood post to provide seat shade as per the
length = 10m
detial drawing.
2 10.00 20.0 m
Supply and fix 5x7cm zigba wood purlins to a posts according to structural drawing length = 20m
2 20.00 40.0
m
Plastic/Mica roof cover nailed to zigba purlins and roof measured in horizontal projection and
2 3.5 length = 3.5m
all necessary accessories.
width= 2.2m
2.20 15.4 m2
PREPARED BY APPROVED BY
Take off sheet for Steel
Project: Pedestrain Walk Way from Asir Aleka Mekonnen to BGI Store
Client: Adola Woyu Town Municipality
Location: Oda Dola Kebele
STEEL WORK
PREPARED BY APPROVED BY
SUMMARY OF BILL OF QUANTITY AND SPECIFICATIONS
Project : Pedestrain Walk Way from BGI Store to PP Pool House
Client : Adola Woyu Municipality
Location : Oda Dola Kebele
Length : 150m
GRAND SUMMARY
A. TERRAZZO PAVEMENT WORK
1. EXCAVATION & EARTH WORK………………………………… BIRR 286,631.25
2. CONCRETE WORK……………..…………………………………… BIRR 84,973.14
3. FINISHING WORK…………...……………………………………. BIRR 1,292,415.00
TOTAL A BIRR 1,664,019.39
B. RETAINING WALL WORK
1. EXCAVATION & EARTH WORK………………………………… BIRR 128,657.10
2. CONCRETE WORK……………..…………………………………… BIRR 29,145.00
3. MASONRY WORK…………………………………………. BIRR 842,385.00
TOTAL B BIRR 1,000,187.10
C. SEAT AND SHADING WORK
1. SEATING WORK…………………………………… BIRR 84,336.80
2. SHADING WORK……………..……………………………………. BIRR 35,580.54
TOTAL C BIRR 119,917.34
TOTAL A + B + C 2,784,123.83
15% VAT……………………. BIRR 417,618.57
Prepared by Approved by
BILL OF QUANTITY AND SPECIFICATIONS
Project : Pedestrain Walk Way from BGI Store to PP Pool House
Client : Adola Woyu Municipality
Location : Oda Dola Kebele
Length : 150m
1.2
Top soil excavation(cut) to a depth of 25cm - 30cm & level the surface with
heavy machine (grader) compact with 16 tons roller machine to the M3 225.00 176.90 39,802.50
maximum compaction density.price includes,showering & soil test.
1.3
Load and Cartaway surplus excavated materials from the site to a distance
M3 225.00 127.70 28,732.50
directed by engineer.
1.4 Supply, spread and compact 15cm thick sub-base granular material from
approved borrow sites and compacting to specified camber and width to
M3 112.50 357.30 40,196.25
98% of modified AASHTO density.
1.5
supply,laying & spread fine crushed aggregate to make level under terazzo
paving with 7-10cm thick by keeping the design slope so as to enable M2 750.00 237.20 177,900.00
terazzo paving.
Sub-total 286,631.25
2. Concrete work
2.1 60x20cm C-25 class ofinconcrete
C-25,360kg/m3,filled to form at the &
work edges of terazzo pavement and for a
vibrated -
a purpose of expansion joints between terazzo pavements as per site
M3 4.20 11,646.70 48,916.14
supervisor instruction. Price shall include 30cmx30cm trenching for
Formwork
concrete. for 60x20cm C-25 class of concrete at the edges of pavement
and for a purpose of expansion joints between terazzo pavements as per site M2 42.00 858.50 36,057.00
b supervisor instruction
Sub-total 84,973.14
3. Finishing work
3.1 supply,laying & spread fine crushed aggregate mixed with cement paste
under terazzo paving, tickness of 5-7cm by keeping the design slope so as
to enable terazzo paving.(Fine aggregate should befrom approved stone M2 750.00 345.50 259,125.00
crusher site.)
3.2 Provide and lay terrazzo tiles of size 30x15x5cm (thickness to be specified
by manfacturer) and 60cm wide handicap terrazzo to accessible peoples
with disabilities laid on fine aggregate mixed with cement paste. Price shall
includes materials and labour of good quality (color & pattern shall
approved by site supervisor) and line drains of approved size by site
supervisor at the edge of terazzo pavement where necessary and Price shall M2 750.00 1,037.80 778,350.00
includes all possible accessories.
3.3 Construct 40cm high greenery coverings above terrazo pavement using
12cm thick Brick Wall ( Size 6x12x24 cm ) according to drawing. Price
shall includes 15x20cm concrete bedding for bricks and pointing of all
exposed surface of brick wall in cement sand mortar of 1 : 3 M2 40.00 2,623.50 104,940.00
3.4 Supply and Plant variety of partially grownTrees & flowers planting of
selected variety. (indigenous trees requiring limited or no watering) for No 25.00 6,000.00 150,000.00
outsideof footpath and to a location shown on the drawing.
Sub-total 1,292,415.00
B. RETAINING WALL WORK
1. Excavation & Earth Work
1.1
Trench excavation for masonry retaining wall to a depth not exceeding 70
cm from reduced level including 25cm work space and can be M3 105.00 482.40 50,652.00
recommended by suppervisor of the site.
1.2 Back fill and compact both sides of stone masonry Retaining wall with
M3 63.00 279.30 17,595.90
selected materials from site to a layer not exceeding 20cm thick.
1.3 Load and Cartaway surplus excavated materials from the site to a distance
M3 42.00 124.10 5,212.20
directed by engineer.
1.4 20cm thick grouted stone pavement under retaining wall bedded and
jointed wth 1:3 cement mortar ratio M2 90.00 613.30 55,197.00
Sub-total 128,657.10
2. Concrete work
2.1 5cm thick lean concrete with 150kg/m3 under retaining wall. M2 75.00 388.60 29,145.00
Sub-total 29,145.00
3. Masonry work
3.1 Construct Averege 40cm thick at the top and 50cm at the bottom with
required elevation.hard trachytic or equivalent stone masonry Retaining
M3 135.00 5,981.80 807,543.00
wall jointed and bedded in cement sand mortar (1:3) ratio. Price includes
pointing and painting of the exposed masonry surface and accessory steps
3.2 for each
40cm and and
width every houses.
5cm thick copping on top of stone masonry Retaining wall
in cement sand mortar (1:2) M2 60.00 580.70 34,842.00
Sub-total 842,385.00
C. SEAT AND SHADING WORK
1. Seating Work
1.1
Sub-total 84,336.80
2. Shading Work
2.1 Suppply, assemble and mount 12cmx12cm Tsid wood post to provide seat
shade as per the detial drawing. price shall include concrete for post foot ,
varnishing every members, one coat primer and two coats of oil paint and M 20.00 521.40 10,428.00
two coat of final paint (a colour type shall approved by site supervisor) and
all accessories.
2.2 Supply and fix 5x7cm zigba wood purlins to a posts according to
structural drawing , price shall include one coat primer and two coats of oil
paint and two coat of final paint (a colour type shall approved by site M 40.00 145.70 5,828.00
supervisor) and all accessories.
2.3 Plastic/Mica roof cover nailed to zigba purlins and roof measured in
horizontal projection and all necessary accessories.( Quality, type, color M2 15.40 1,254.84 19,324.54
and pattern of roofing shall approved by site supervisor)
Sub-total 35,580.54
PREPARED BY APPROVED BY
TAKE-OFF SHEET
Project : Pedestrain Walk Way from BGI Store to PP Pool House
Client : Adola Woyu Municipality
Location : Oda Dola Kebele
Length : 150m
1 150 Supply, spread and compact 15cm thick sub-base granular material from approved borrow length = 150m
5 sites width = 5m
0.15 112.5 m3 depth = 0.15m
1 0 Fill & compact 5-7cm thick red-ash (scoria) in walk way area on the top of compacted
0 selected granural fill.
0 - m3
1 150 supply,laying & spread fine crushed aggregate to make level under terazzo paving with 7- length = 150m
5 750.00 m2 10cm thick by keeping the design slope so as to enable terazzo paving. width = 5m
2. Concrete work
5 7 60x20cm C-25 class of concrete at the edges of terazzo pavement and for a purpose of length = 7m
0.2 expansion joints between terazzo pavements as per site supervisor instruction. width = 0.2m
0.6 4.2 m3 depth = 0.6m
2 7 Formwork for 60x20cm C-25 class of concrete at the edges of pavement and for a purpose length = 7m
5 0.60 42.0 of expansion joints between terazzo pavements as per site supervisor instruction depth = 0.6m
3. Finishing work
1 150 supply,laying & spread fine crushed aggregate mixed with cement paste under terazzo length = 150m
5.00 750.0 paving, tickness of 5-7cm by keeping the design slope so as to enable terazzo paving. width= 5m
Provide and lay terrazzo tiles of size 30x15x5cm (thickness to be specified by manfacturer)
1 150 and 60cm wide handicap terrazzo to accessible peoples with disabilities laid on fine
aggregate mixed with cement paste. Price shall includes materials and labour of good length = 150m
5.00 750.0 quality (color & pattern shall approved by site supervisor) and line drains of approved size width= 5m
by site supervisor at the edge of terazzo pavement where necessary and Price shall includes
all possible accessories.
1 4 Construct 40cm high greenery coverings above terrazo pavement using 12cm thick Brick length = 4m height=
25 0.40 40.0 Wall ( Size 6x12x24 cm ) according to drawing. 0.4m
25 1 Supply and Plant variety of partially grownTrees & flowers planting of selected variety.
(indigenous trees requiring limited or no watering) for outsideof footpath and to a location NO. 25
25.0 shown on the drawing.
B. RETAINING WALL WORK
1.Excavation&Earth work
Trench exca.
1 105.00 +
Cart away surplus excavated material Back fill
63.0 -
42.00 m3
1 150 20cm thick grouted stone pavement under retaining wall bedded and jointed wth 1:3 length = 150m
0.6 90.00 m2 cement mortar ratio width = 0.6m
2. Concrete work
1 150 length = 150m
5cm thick lean concrete quality C-5, 150 kg of cement/m3
0.50 75.0 m2 width = 0.5m
3. Masonry work
1 150 Construct Averege 40cm thick at the top and 70cm at the bottom with required length = 150m
0.50 elevation.hard trachytic or equivalent stone masonry Retaining wall jointed and bedded in width = 0.5m
1.8 135.00 m3 cement sand mortar (1:3) ratio. depth = 1.8m
Copping
1 150 40cm width and5cm Cement sand mortar ( 1:2) Copping on top of masonary length = 150m
0.4 60.00 m2 width = 0.4m
Supply and fix 5x7cm zigba wood purlins to a posts according to structural drawing length = 20m
2 20.00 40.0 m
Plastic/Mica roof cover nailed to zigba purlins and roof measured in horizontal projection
2 3.5 length = 3.5m
and all necessary accessories.
width= 2.2m
2.20 15.4 m2
PREPARED BY APPROVED BY
Take off sheet for SHS
Project: Pedestrain Walk Way from BGI Store to PP Pool House
Client: Adola Woyu Town Municipality
Location: Oda Dola Kebele
STEEL WORK
PREPARED BY APPROVED BY
SUMMARY OF BILL OF QUANTITY AND SPECIFICATIONS
Project : Pedestrain Walk Way from PP Pool House to Sharo Shop
Length : 140m
GRAND SUMMARY
TOTAL A + B + C 2,684,887.44
15% VAT……………………. BIRR 402,733.12
1.2 Top soil excavation(cut) to a depth of 25cm - 30cm & level the surface with heavy machine
(grader) compact with 16 tons roller machine to the maximum compaction density.price M3 210.00 176.90 37,149.00
includes,showering & soil test.
1.3 Load and Cartaway surplus excavated materials from the site to a distance directed by
M3 210.00 127.70 26,817.00
engineer.
1.4 Supply, spread and compact 15cm thick sub-base granular material from approved borrow
sites and compacting to specified camber and width to 98% of modified AASHTO density. M3 105.00 357.30 37,516.50
1.5 supply,laying & spread fine crushed aggregate to make level under terazzo paving with 7-
M2 700.00 237.20 166,040.00
10cm thick by keeping the design slope so as to enable terazzo paving.
Sub-total 267,522.50
2. Concrete work
2.1 C-25,360kg/m3,filled in to form work & vibrated -
a
60x20cm C-25 class of concrete at the edges of terazzo pavement and for a purpose of
expansion joints between terazzo pavements as per site supervisor instruction. Price shall M3 4.20 11,646.70 48,916.14
include 30cmx30cm trenching for concrete.
Formwork for 60x20cm C-25 class of concrete at the edges of pavement and for a purpose
M2 42.00 858.50 36,057.00
of expansion joints between terazzo pavements as per site supervisor instruction
b
Sub-total 84,973.14
3. Finishing work
3.1 supply,laying & spread fine crushed aggregate mixed with cement paste under terazzo
paving, tickness of 5-7cm by keeping the design slope so as to enable terazzo paving.(Fine M2 700.00 345.50 241,850.00
aggregate should befrom approved stone crusher site.)
3.2 Provide and lay terrazzo tiles of size 30x15x5cm (thickness to be specified by manfacturer)
and 60cm wide handicap terrazzo to accessible peoples with disabilities laid on fine
aggregate mixed with cement paste. Price shall includes materials and labour of good
quality (color & pattern shall approved by site supervisor) and line drains of approved size M2 700.00 1,037.80 726,460.00
by site supervisor at the edge of terazzo pavement where necessary and Price shall includes
all possible accessories.
3.3 Construct 40cm high greenery coverings above terrazo pavement using 12cm thick Brick
Wall ( Size 6x12x24 cm ) according to drawing. Price shall includes 15x20cm concrete
bedding for bricks and pointing of all exposed surface of brick wall in cement sand mortar M2 38.40 2,623.50 100,742.40
of 1 : 3
3.4 Supply and Plant variety of partially grownTrees & flowers planting of selected variety.
(indigenous trees requiring limited or no watering) for outsideof footpath and to a location No 24.00 6,000.00 144,000.00
shown on the drawing.
Sub-total 1,213,052.40
B. RETAINING WALL WORK
1. Excavation & Earth Work
1.1
Trench excavation for masonry retaining wall to a depth not exceeding 70 cm from reduced
M3 68.60 482.40 33,092.64
level including 25cm work space and can be recommended by suppervisor of the site.
1.2 Back fill and compact both sides of stone masonry Retaining wall with selected materials
M3 58.80 279.30 16,422.84
from site to a layer not exceeding 20cm thick.
1.3 Load and Cartaway surplus excavated materials from the site to a distance directed by
M3 9.80 124.10 1,216.18
engineer.
1.4 20cm thick grouted stone pavement under retaining wall bedded and jointed wth 1:3
cement mortar ratio M2 84.00 613.30 51,517.20
Sub-total 102,248.86
2. Concrete work
2.1 5cm thick lean concrete with 150kg/m3 under retaining wall. M2 70.00 388.60 27,202.00
Sub-total 27,202.00
3. Masonry work
3.1 Construct Averege 40cm thick at the top and 50cm at the bottom with required
elevation.hard trachytic or equivalent stone masonry Retaining wall jointed and bedded in
cement sand mortar (1:3) ratio. Price includes pointing and painting of the exposed M3 140.00 5,981.80 837,452.00
masonry surface and accessory steps for each and every houses.
3.2 40cm width and 5cm thick copping on top of stone masonry Retaining wall in cement sand
mortar (1:2) M2 56.00 580.70 32,519.20
Sub-total 869,971.20
C. SEAT AND SHADING WORK
1. Seating Work
1.1
Fabricate and mount sittings along pedestrain walkways using 50x50x3mm steel members
and 20x3cm thick timber battens according to structural drawing , price shall include one
coat of anti rust and two coats of synthathic enamel painting, varnishing the battens, final
paint(a colour type shall approved by site supervisor) and fixing timber battens by bolts to a No 2.00 42,168.40 84,336.80
sitting steels and concrete for steel legs and all accessories. (The seat must be fabricated out
of working site and then brought and erected carefully and the locations for seatings shall
be comfirmed by site supervisor)
Sub-total 84,336.80
2. Shading Work
2.1 Suppply, assemble and mount 12cmx12cm Tsid wood post to provide seat shade as per
the detial drawing. price shall include concrete for post foot , varnishing every members,
one coat primer and two coats of oil paint and two coat of final paint (a colour type shall M 20.00 521.40 10,428.00
approved by site supervisor) and all accessories.
2.2 Supply and fix 5x7cm zigba wood purlins to a posts according to structural drawing ,
price shall include one coat primer and two coats of oil paint and two coat of final paint (a M 40.00 145.70 5,828.00
colour type shall approved by site supervisor) and all accessories.
2.3 Plastic/Mica roof cover nailed to zigba purlins and roof measured in horizontal projection
and all necessary accessories.( Quality, type, color and pattern of roofing shall approved by M2 15.40 1,254.84 19,324.54
site supervisor)
Sub-total 35,580.54
PREPARED BY APPROVED BY
TAKE-OFF SHEET
Project : Pedestrain Walk Way from PP Pool House to Sharo Shop
Client : Adola Woyu Municipality
Location : Oda Dola Kebele
Length : 140m
1 140 Supply, spread and compact 15cm thick sub-base granular material from approved borrow length = 140m
5 sites width = 5m
0.15 105.0 m3 depth = 0.15m
1 0 Fill & compact 5-7cm thick red-ash (scoria) in walk way area on the top of compacted selected
0 granural fill.
0 - m3
1 140 supply,laying & spread fine crushed aggregate to make level under terazzo paving with 7- length = 140m
5 700.00 m2 10cm thick by keeping the design slope so as to enable terazzo paving. width = 5m
2. Concrete work
5 7 60x20cm C-25 class of concrete at the edges of terazzo pavement and for a purpose of length = 7m
0.2 expansion joints between terazzo pavements as per site supervisor instruction. width = 0.2m
0.6 4.2 m3 depth = 0.6m
2 7 Formwork for 60x20cm C-25 class of concrete at the edges of pavement and for a purpose of length = 7m
5 0.60 42.0 expansion joints between terazzo pavements as per site supervisor instruction depth = 0.6m
3. Finishing work
1 140 supply,laying & spread fine crushed aggregate mixed with cement paste under terazzo paving, length = 140m
5.00 700.0 tickness of 5-7cm by keeping the design slope so as to enable terazzo paving. width= 5m
Provide and lay terrazzo tiles of size 30x15x5cm (thickness to be specified by manfacturer)
1 140 and 60cm wide handicap terrazzo to accessible peoples with disabilities laid on fine
aggregate mixed with cement paste. Price shall includes materials and labour of good quality length = 140m
5.00 700.0 (color & pattern shall approved by site supervisor) and line drains of approved size by site width= 5m
supervisor at the edge of terazzo pavement where necessary and Price shall includes all
possible accessories.
1 4 Construct 40cm high greenery coverings above terrazo pavement using 12cm thick Brick Wall length = 4m
24 0.40 38.4 ( Size 6x12x24 cm ) according to drawing. height= 0.4m
24 1 Supply and Plant variety of partially grownTrees & flowers planting of selected variety.
(indigenous trees requiring limited or no watering) for outsideof footpath and to a location NO. 24
24.0 shown on the drawing.
B. RETAINING WALL WORK
1.Excavation&Earth work
Trench exca.
1 68.60 +
Cart away surplus excavated material Back fill
58.8 -
9.80 m3
1 140 20cm thick grouted stone pavement under retaining wall bedded and jointed wth 1:3 cement length = 140m
0.6 84.00 m2 mortar ratio width = 0.6m
2. Concrete work
1 140 length = 140m
5cm thick lean concrete quality C-5, 150 kg of cement/m3
0.50 70.0 m2 width = 0.5m
3. Masonry work
1 140 Construct Averege 40cm thick at the top and 70cm at the bottom with required elevation.hard length = 140m
0.50 trachytic or equivalent stone masonry Retaining wall jointed and bedded in cement sand width = 0.5m
2 140.00 m3 mortar (1:3) ratio. depth = 2m
Copping
1 140 40cm width and5cm Cement sand mortar ( 1:2) Copping on top of masonary length = 140m
0.4 56.00 m2 width = 0.4m
Supply and fix 5x7cm zigba wood purlins to a posts according to structural drawing length = 20m
2 20.00 40.0 m
Plastic/Mica roof cover nailed to zigba purlins and roof measured in horizontal projection and
2 3.5 length = 3.5m
all necessary accessories.
width= 2.2m
2.20 15.4 m2
PREPARED BY APPROVED BY
Take off sheet for SHS
Project: Pedestrain Walk Way from PP Pool House to Sharo Shop
Client: Adola Woyu Town Municipality
Location: Oda Dola Kebele
STEEL WORK
PREPARED BY APPROVED BY
SUMMARY OF BILL OF QUANTITY AND SPECIFICATIONS
Project : Pedestrain Walk Way from Commercial Bank to Mosque
Length : 75m
GRAND SUMMARY
A. TERRAZZO PAVEMENT WORK
1. EXCAVATION & EARTH WORK…………………………… BIRR 229,305.00
2. CONCRETE WORK……………..…………………………… BIRR 116,534.59
3. FINISHING WORK…………...………………………………… BIRR 962,548.80
TOTAL A BIRR 1,308,388.39
B. RETAINING WALL WORK
1. EXCAVATION & EARTH WORK…………………………… BIRR 54,776.18
2. CONCRETE WORK……………..…………………………… BIRR 14,572.50
3. MASONRY WORK…………………………………………. BIRR 309,033.75
TOTAL B BIRR 378,382.43
C. SEAT AND SHADING WORK
1. SEATING WORK…………………………………… BIRR 84,336.80
2. SHADING WORK……………..………………………………… BIRR 35,580.54
TOTAL C BIRR 119,917.34
TOTAL A + B + C 1,806,688.15
15% VAT……………………. BIRR 271,003.22
Prepared by Approved by
BILL OF QUANTITY AND SPECIFICATIONS
Project : Pedestrain Walk Way from Commercial Bank to Mosque
Client : Adola Woyu Municipality
P
Location : Lega Dufa Kebele r
e
Length : 75m v
.
e
x
Item Description Contract Amount
Unit Quantity Rate (ETB) q
t
A. TERRAZZO PAVEMENT WORK y
1. Excavation & Earth Work
1.1 Fix Station points, PI, at 10m intervals and setting out using the
leveling instrument for laying out using slope/grades of the LS 75.00 0.5% of TPC 0.00
road.pegging at 10m length interval and 600cm width.
1.2
Top soil excavation(cut) to a depth of 25cm - 30cm & level the surface
with heavy machine (grader) compact with 16 tons roller machine to M3 180.00 176.90 31,842.00
the maximum compaction density.price includes,showering & soil test.
1.3 Load and Cartaway surplus excavated materials from the site to a
M3 180.00 127.70 22,986.00
distance directed by engineer.
1.4 Supply, spread and compact 15cm thick sub-base granular material
from approved borrow sites and compacting to specified camber and M3 90.00 357.30 32,157.00
width to 98% of modified AASHTO density.
1.5 supply,laying & spread fine crushed aggregate to make level under
terazzo paving with 7-10cm thick by keeping the design slope so as to M2 600.00 237.20 142,320.00
enable terazzo paving.
Sub-total 229,305.00
2. Concrete work ###
2.1 60x20cm C-25 class ofinconcrete
C-25,360kg/m3,filled to form at the edges
work of terazzo pavement and
& vibrated -
a for a purpose of expansion joints between terazzo pavements as per
M3 5.76 11,646.70 67,084.99
site supervisor instruction. Price shall include 30cmx30cm trenching
Formwork for 60x20cm C-25 class of concrete at the edges of
for concrete.
pavement and for a purpose of expansion joints between terazzo M2 57.60 858.50 49,449.60
b pavements as per site supervisor instruction
Sub-total 116,534.59
3. Finishing work
3.1 supply,laying & spread fine crushed aggregate mixed with cement
paste under terazzo paving, tickness of 5-7cm by keeping the design
slope so as to enable terazzo paving.(Fine aggregate should befrom M2 600.00 345.50 207,300.00
approved stone crusher site.)
3.2 Provide and lay terrazzo tiles of size 30x15x5cm (thickness to be
specified by manfacturer) and 60cm wide handicap terrazzo to
accessible peoples with disabilities laid on fine aggregate mixed with
cement paste. Price shall includes materials and labour of good quality
(color & pattern shall approved by site supervisor) and line drains of M2 600.00 1,037.80 622,680.00
approved size by site supervisor at the edge of terazzo pavement where
necessary and Price shall includes all possible accessories.
3.3 Construct 40cm high greenery coverings above terrazo pavement using
12cm thick Brick Wall ( Size 6x12x24 cm ) according to drawing.
Price shall includes 15x20cm concrete bedding for bricks and pointing M2 20.80 2,623.50 54,568.80
of all exposed surface of brick wall in cement sand mortar of 1 : 3
3.4 Supply and Plant variety of partially grownTrees & flowers planting of
selected variety. (indigenous trees requiring limited or no watering) for
outsideof footpath and to a location shown on the drawing. No 13.00 6,000.00 78,000.00
Sub-total 962,548.80
B. RETAINING WALL WORK ###
1. Excavation & Earth Work ###
1.1 Trench excavation for masonry retaining wall to a depth not exceeding
70 cm from reduced level including 25cm work space and can be M3 36.75 482.40 17,728.20
recommended by suppervisor of the site.
1.2
Back fill and compact both sides of stone masonry Retaining wall with
M3 31.50 279.30 8,797.95
selected materials from site to a layer not exceeding 20cm thick.
1.3 Load and Cartaway surplus excavated materials from the site to a
M3 5.25 124.10 651.53
distance directed by engineer.
1.4 20cm thick grouted stone pavement under retaining wall bedded and
jointed wth 1:3 cement mortar ratio M2 45.00 613.30 27,598.50
Sub-total 54,776.18
2. Concrete work
2.1 5cm thick lean concrete with 150kg/m3 under retaining wall. M2 37.50 388.60 14,572.50
Sub-total 14,572.50
3. Masonry work
3.1 Construct Averege 40cm thick at the top and 50cm at the bottom with
required elevation.hard trachytic or equivalent stone masonry
Retaining wall jointed and bedded in cement sand mortar (1:3) ratio. M3 48.75 5,981.80 291,612.75
Price includes pointing and painting of the exposed masonry surface
and accessory steps for each and every houses.
3.2 40cm width and 5cm thick copping on top of stone masonry Retaining
wall in cement sand mortar (1:2) M2 30.00 580.70 17,421.00
Sub-total 309,033.75
C. SEAT AND SHADING WORK ###
1. Seating Work
1.1
Sub-total 84,336.80
2. Shading Work
2.1 Suppply, assemble and mount 12cmx12cm Tsid wood post to provide
seat shade as per the detial drawing. price shall include concrete for
post foot , varnishing every members, one coat primer and two coats M 20.00 521.40 10,428.00
of oil paint and two coat of final paint (a colour type shall approved
by site supervisor) and all accessories.
2.2 Supply and fix 5x7cm zigba wood purlins to a posts according to
structural drawing , price shall include one coat primer and two coats
of oil paint and two coat of final paint (a colour type shall approved M 40.00 145.70 5,828.00
by site supervisor) and all accessories.
2.3 Plastic/Mica roof cover nailed to zigba purlins and roof measured in
horizontal projection and all necessary accessories.( Quality, type, M2 15.40 1,254.84 19,324.54
color and pattern of roofing shall approved by site supervisor)
Sub-total 35,580.54
PREPARED BY APPROVED BY
TAKE-OFF SHEET
Project : Pedestrain Walk Way from Commercial Bank to Mosque
Client : Adola Woyu Municipality
Location : Lega Dufa Kebele
Length : 75m
1 75 length = 75m
Supply, spread and compact 15cm thick sub-base granular material from approved borrow sites
8 width = 8m
0.15 90.0 m3 depth = 0.15m
1 0
Fill & compact 5-7cm thick red-ash (scoria) in walk way area on the top of compacted selected granural fill.
0
0 - m3
1 75 supply,laying & spread fine crushed aggregate to make level under terazzo paving with 7-10cm thick by length = 75m
8 600.00 m2 keeping the design slope so as to enable terazzo paving. width = 8m
2. Concrete work
6 8 60x20cm C-25 class of concrete at the edges of terazzo pavement and for a purpose of expansion joints
between terazzo pavements as per site supervisor instruction. length = 8m
0.2 width = 0.2m
0.6 5.8 m3 depth = 0.6m
2 8 Formwork for 60x20cm C-25 class of concrete at the edges of pavement and for a purpose of expansion length = 8m
6 0.60 57.6 joints between terazzo pavements as per site supervisor instruction depth = 0.6m
3. Finishing work
1 75 supply,laying & spread fine crushed aggregate mixed with cement paste under terazzo paving, tickness of 5- length = 75m
8.00 600.0 7cm by keeping the design slope so as to enable terazzo paving. width= 8m
1 75 Provide and lay terrazzo tiles of size 30x15x5cm (thickness to be specified by manfacturer) and 60cm wide
handicap terrazzo to accessible peoples with disabilities laid on fine aggregate mixed with cement paste.
length = 75m
Price shall includes materials and labour of good quality (color & pattern shall approved by site supervisor)
8.00 600.0 width= 8m
and line drains of approved size by site supervisor at the edge of terazzo pavement where necessary and
Price shall includes all possible accessories.
1 4 Construct 40cm high greenery coverings above terrazo pavement using 12cm thick Brick Wall ( Size length = 4m
13 0.40 20.8 6x12x24 cm ) according to drawing. height= 0.4m
13 1 Supply and Plant variety of partially grownTrees & flowers planting of selected variety. (indigenous trees
NO. 13
13.0 requiring limited or no watering) for outsideof footpath and to a location shown on the drawing.
B. RETAINING WALL WORK
1.Excavation&Earth work
1 75 length = 75m
0.7 Trench excavation depth of not exceeding 70cm width = 0.75m
0.70 36.8 m3 depth = 0.7m
2 75 length = 75m
Back fill around Retaining masonry wall
0.3 width = 0.3m
0.7 31.5 m 3 depth = 0.7m
Trench exca.
1 36.75 +
Cart away surplus excavated material Back fill
31.5 -
5.25 m3
1 75 length = 75m
20cm thick grouted stone pavement under retaining wall bedded and jointed wth 1:3 cement mortar ratio
width = 0.6m
length = 75m
20cm thick grouted stone pavement under retaining wall bedded and jointed wth 1:3 cement mortar ratio
0.6 45.00 m2 width = 0.6m
2. Concrete work
1 75 length = 75m
5cm thick lean concrete quality C-5, 150 kg of cement/m3
0.50 37.5 m2 width = 0.5m
3. Masonry work
1 75 length = 75m
0.50 Construct Averege 40cm thick at the top and 70cm at the bottom with required elevation.hard trachytic or
width = 0.5m
equivalent stone masonry Retaining wall jointed and bedded in cement sand mortar (1:3) ratio.
1.3 48.75 m3 depth = 1.3m
Copping
1 75 40cm width and5cm Cement sand mortar ( 1:2) Copping on top of masonary length = 75m
0.4 30.00 m2 width = 0.4m
Supply and fix 5x7cm zigba wood purlins to a posts according to structural drawing length = 20m
2 20.00 40.0 m
Plastic/Mica roof cover nailed to zigba purlins and roof measured in horizontal projection and all necessary
2 3.5 length = 3.5m
accessories.
width= 2.2m
2.20 15.4 m2
PREPARED BY APPROVED BY
Take off sheet for Steel
Project: Pedestrain Walk Way from Commercial Bank to Mosque
Client: Adola Woyu Town Municipality
Location: Lega Dufa Kebele
STEEL WORK
PREPARED BY APPROVED BY
BILL OF QUANTITY AND SPECIFICATIONS
Project : Pedestrain Walk Way from Aseb Muslim Restaurant to Car Wash
Client : Adola Woyu Municipality
Location : Lega Dufa Kebele
Length : 151m
A) Sub Structure
1 Excavation & Earth Work
1.1 Fix Station points, PI, at 10m intervals and setting out using the
leveling instrument for laying out using slope/grades of the ML 100.00
road.pegging at 10m length interval and 600cm width.
1.2
Top soil excavation(cut) to a depth of 25cm - 30cm & level the surface
with heavy machine (grader) compact with 16 tons roller machine to M3 500.00
the maximum compaction density.price includes,showering & soil test.
1.3 Trench excavation for masonry retaining wall to a depth not exceeding
70 cm from reduced level including 25cm work space and can be M3 70.00
recommended by suppervisor of the site.
1.4
Back fill and compact both sides of stone masonry Retaining wall with
M3 90.00
selected materials from site to a layer not exceeding 20cm thick.
1.5 Load and Cartaway surplus excavated materials from the site to a
M3 105.00
distance directed by engineer.
1.6 Supply, spread and compact 15cm thick sub-base granular material
from approved borrow sites and compacting to specified camber and M3 112.50
width to 98% of modified AASHTO density
1.6 20cm thick grouted stone pavement under retaining wall bedded and
jointed wth 1:3 cement mortar ratio M2 90.00
1.7 Fill & compact 5cm-7cm thick red-ash (base course or scoria) in walk
M3 75.00
way area on the top of compacted selected granural fill.
1.8 supply,laying & spread fine crushed aggregate to make level under
terazzo paving with 7cm thick by keeping the design slope so as to M2 500.00
enable terazzo paving.
Sub-total:-------------------------------------------------
2 Masonery work
2.1 Construct Averege 40cm thick at the top and 70cm at the bottom with
required elevation.hard trachytic or equivalent stone masonry
Retaining wall jointed and bedded in cement sand mortar (1:3) ratio. M3 66.00
Price includes pointing and painting of the exposed masonry surface
and accessory steps for each and every houses.
2.2 40cm width and 5cm thick copping on top of stone masonry Retaining
wall in cement sand mortar (1:2) M2 40.00
Sub-total:-------------------------------------------------
3 Concrete work
3.1 5cm thick lean concrete with 150kg/m3 under retaining wall. M2 70.00
3.2 C-25,360kg/m3,filled in to form work & vibrated
a A) (40*15cm AGL and 40*15cm BGL ) size concerete curbstone for
walk way greenary as detailed in the design drawing.Price shall
includes placing of lean concrete and any excavation which may be M3 6.94
required preparation for concrete work & final finish of the concerete
surface as per the engineers approval.
b
60x20cm C-25 class of concrete at the edges of terazzo pavement and
for a purpose of expansion joints between terazzo pavements as per
M3 5.04
site supervisor instruction. Price shall include 30cmx30cm trenching
for concrete.
c Provide,cut & fix in position sawn zigba or sheet metal panel
formwork to greenary concrete. M2 92.48
4.1 Supply and Plant variety of partially grownTrees & flowers planting of
selected variety. (indigenous trees requiring limited or no watering) for
outsideof footpath and to a location shown on the drawing. No 25.00
Contract Amount
Rate
(ETB)
154.70 77,350.00
100 5 500
482.40 33,768.00
100 1 0.7 1 70
279.30 25,137.00
100 0.3 1.5 2 90
124.10 13,030.50
357.30 40,196.25
150 5 0.15 112.5
613.30 55,197.00
100 0.9 90
2,631.60 197,370.00
100 5 0.15 1 75
237.20 118,600.00
100 5 1 500
560,648.75
5,981.80 394,798.80
580.70 23,228.00
100 0.4 40
418,026.80
11,646.70 80,781.51
11,646.70 58,699.37
7 0.2 0.6 6 5.04
858.50 79,394.08
3.4 0.8 2 17 92.48
858.50 43,268.40
7 0.6 2 6 50.4
289,345.36
550
570,790.00
1,838,810.91
275,821.64
2,114,632.55
TAKE-OFF SHEET
Project : Pedestrain Walk Way from Dessie Shop to Ato Abera Beer Distribution
Client : Adola Woyu Municipality
Location : Oda Dola Kebele
Length : 150m
T D S Unit
1 150
5
0.3 225.00 m2
1 150
1
0.70 105.0 m3
2 150
0.3
1.5 135.0 m3
1 225.00 +
105.00 +
135.0 -
195.00 m3
1 150
0.9 135.00 m2
1 150
5
0.15 112.5 m3
1 150
5 750.00 m2
1 150
0.55
1.3 107.25 m3
1 150
0.4 60.00 m2
1 150
0.70 105.0 m2
25 3.4
0.2
0.8 13.6 m3
5 7
0.2
0.6 4.2 m3
2 3.4
25 0.80 136.0
2 7
5 0.60 42.0
2 2.5
1.50 7.5
2 20.00 40.0
2 10.00 20.0
1 150
5.00 750.0
PREPARED BY
TAKE-OFF SHEET
lk Way from Dessie Shop to Ato Abera Beer Distribution
unicipality
Descriptions
1.Excavation&Earth work
Top soil excavation(cut) to depth 25cm - 30cm & level the surface with heavy machine (grader)
compact with 16 tons roller machine to the maximum compaction density.price includes,showering
& soil test.
20cm thick grouted stone pavement under retaining wall bedded and jointed wth 1:3 cement mortar
ratio
Fill & compact 12cm - 15cm thick red-ash (scoria) in walk way area on the top of compacted
selected granural fill.
supply,laying & spread fine crushed aggregate to make level under terazzo paving with 5-7cm thick
by keeping the design slope so as to enable terazzo paving.
2. Masonry work
Construct Averege 40cm thick at the top and 70cm at the bottom with required elevation.hard
trachytic or equivalent stone masonry Retaining wall jointed and bedded in cement sand mortar
(1:3) ratio.
Copping
40cm width and5cm Cement sand mortar ( 1:2) Copping on top of masonary
3. Concrete work
5cm thick lean concrete quality C-5, 150 kg of cement/m3
(40*15cm AGL and 40*15cm BGL ) size of C-25 concerete curbstone for walk way greenary as
detailed in the design drawing.
60x20cm C-25 class of concrete at the edges of terazzo pavement and for a purpose of expansion
joints between terazzo pavements as per site supervisor instruction.
Formwork
Provide,cut & fix in position sawn zigba or sheet metal panel formwork to greenary concrete.
Formwork for 60x20cm C-25 class of concrete at the edges of pavement and for a purpose of
expansion joints between terazzo pavements as per site supervisor instruction
5. Roofing work
Roof cover in G-30 C.I.S. Nailed to zigba purlins and roof measured in horizontal projection.
Suppply, assemble and mount Dia.8-10cm dia eucaliptus wooden truss as per the detial drawing.
Supply and fix 5x7 cm zigba purlin as per the detial drawing. Price shall include anti-termite
treatment and all other neccassary accessories.
6. Finishing work
Provide and lay terrazzo tiles of size 30x15x5cm (thickness to be specified by manfacturer) laid on
cement mortar 1:3 including 40mm thick cement sand screed ,grouting the joints with white cement
and matching pigments,etc
APPROVED BY
Remarks
length = 150m
width = 5m
depth = 0.3m
length = 150m
width = 1m
depth = 0.7m
length = 150m
width = 0.25m
depth = 1.5m
length = 150m
width = 0.9m
length = 150m
width = 5m
depth = 0.15m
length = 150m
width = 5m
length = 150m
width = 0.55m
depth = 1.3m
length = 150m
width = 0.4m
length = 150m
width = 0.7m
length = 3.4m
width = 0.2m
depth = 0.8m
length = 7m
width = 0.2m
depth = 0.6m
length = 3.4m
depth = 0.8m
length = 7m
depth = 0.6m
length = 2.5m
width= 1.5m
length = 20m
length = 10m
length = 2.5m
width= 1.5m
SUMMARY OF BILL OF QUANTITY AND SPECIFICATIONS
Project : Pedestrain Walk Way from Siraj Umer Shop to Robe Clinic
Length : 140m
GRAND SUMMARY
TOTAL A + B + C 2,896,216.71
15% VAT……………………. BIRR 434,432.51
Prepared by Approved by
BILL OF QUANTITY AND SPECIFICATIONS
Project : Pedestrain Walk Way from Siraj Umer Shop to Robe Clinic
Client : Adola Woyu Municipality
P
Location : Lega Gefersa Kebele r
e
Length : 140m v
.
e
x
Item Description Contract Amount
Unit Quantity Rate (ETB) q
t
A. TERRAZZO PAVEMENT WORK y
1. Excavation & Earth Work
1.1 Fix Station points, PI, at 10m intervals and setting out using the
leveling instrument for laying out using slope/grades of the LS 140.00 0.5% of TPC 0.00
road.pegging at 10m length interval and 600cm width.
1.2
Top soil excavation(cut) to a depth of 25cm - 30cm & level the surface
with heavy machine (grader) compact with 16 tons roller machine to M3 315.00 176.90 55,723.50
the maximum compaction density.price includes,showering & soil test.
1.3 Load and Cartaway surplus excavated materials from the site to a
M3 315.00 127.70 40,225.50
distance directed by engineer.
1.4 Supply, spread and compact 15cm thick sub-base granular material
from approved borrow sites and compacting to specified camber and M3 157.50 357.30 56,274.75
width to 98% of modified AASHTO density.
1.5 supply,laying & spread fine crushed aggregate to make level under
terazzo paving with 7-10cm thick by keeping the design slope so as to M2 1,050.00 237.20 249,060.00
enable terazzo paving.
Sub-total 401,283.75
2. Concrete work ###
2.1 C-25,360kg/m3,filled in to form work & vibrated -
a
60x20cm C-25 class of concrete at the edges of terazzo pavement and
for a purpose of expansion joints between terazzo pavements as per
M3 4.80 11,646.70 55,904.16
site supervisor instruction. Price shall include 30cmx30cm trenching
for concrete.
3.3 Construct 40cm high greenery coverings above terrazo pavement using
12cm thick Brick Wall ( Size 6x12x24 cm ) according to drawing.
Price shall includes 15x20cm concrete bedding for bricks and pointing M2 38.40 2,623.50 100,742.40
of all exposed surface of brick wall in cement sand mortar of 1 : 3
3.4 Supply and Plant variety of partially grownTrees & flowers planting of
selected variety. (indigenous trees requiring limited or no watering) for
outsideof footpath and to a location shown on the drawing. No 24.00 6,000.00 144,000.00
Sub-total 1,697,207.40
B. RETAINING WALL WORK ###
1. Excavation & Earth Work ###
1.1 Trench excavation for masonry retaining wall to a depth not exceeding
70 cm from reduced level including 25cm work space and can be M3 68.60 482.40 33,092.64
recommended by suppervisor of the site.
1.2
Back fill and compact both sides of stone masonry Retaining wall with
M3 58.80 279.30 16,422.84
selected materials from site to a layer not exceeding 20cm thick.
1.3 Load and Cartaway surplus excavated materials from the site to a
M3 9.80 124.10 1,216.18
distance directed by engineer.
1.4 20cm thick grouted stone pavement under retaining wall bedded and
jointed wth 1:3 cement mortar ratio M2 84.00 613.30 51,517.20
Sub-total 102,248.86
2. Concrete work
2.1 5cm thick lean concrete with 150kg/m3 under retaining wall. M2 70.00 388.60 27,202.00
Sub-total 27,202.00
3. Masonry work
3.1 Construct Averege 40cm thick at the top and 50cm at the bottom with
required elevation.hard trachytic or equivalent stone masonry
Retaining wall jointed and bedded in cement sand mortar (1:3) ratio. M3 70.00 5,981.80 418,726.00
Price includes pointing and painting of the exposed masonry surface
and accessory steps for each and every houses.
3.2 40cm width and 5cm thick copping on top of stone masonry Retaining
wall in cement sand mortar (1:2) M2 56.00 580.70 32,519.20
Sub-total 451,245.20
C. SEAT AND SHADING WORK ###
1. Seating Work
1.1
Sub-total 84,336.80
2. Shading Work
2.1 Suppply, assemble and mount 12cmx12cm Tsid wood post to provide
seat shade as per the detial drawing. price shall include concrete for
post foot , varnishing every members, one coat primer and two coats M 20.00 521.40 10,428.00
of oil paint and two coat of final paint (a colour type shall approved
by site supervisor) and all accessories.
2.2 Supply and fix 5x7cm zigba wood purlins to a posts according to
structural drawing , price shall include one coat primer and two coats
of oil paint and two coat of final paint (a colour type shall approved M 40.00 145.70 5,828.00
by site supervisor) and all accessories.
2.3 Plastic/Mica roof cover nailed to zigba purlins and roof measured in
horizontal projection and all necessary accessories.( Quality, type, M2 15.40 1,254.84 19,324.54
color and pattern of roofing shall approved by site supervisor)
Sub-total 35,580.54
PREPARED BY APPROVED BY
TAKE-OFF SHEET
Project : Pedestrain Walk Way from Siraj Umer Shop to Robe Clinic
Client : Adola Woyu Municipality
Location : Lega Gefersa Kebele
Length : 140m
1 140 Supply, spread and compact 15cm thick sub-base granular material from approved borrow length = 140m
7.5 sites width = 7.5m
0.15 157.5 m3 depth = 0.15m
1 0 Fill & compact 5-7cm thick red-ash (scoria) in walk way area on the top of compacted
0 selected granural fill.
0 - m3
1 140 supply,laying & spread fine crushed aggregate to make level under terazzo paving with 7- length = 140m
7.5 1,050.00 m2 10cm thick by keeping the design slope so as to enable terazzo paving. width = 7.5m
2. Concrete work
5 8 60x20cm C-25 class of concrete at the edges of terazzo pavement and for a purpose of length = 8m
0.2 expansion joints between terazzo pavements as per site supervisor instruction. width = 0.2m
0.6 4.8 m3 depth = 0.6m
2 8 Formwork for 60x20cm C-25 class of concrete at the edges of pavement and for a purpose length = 8m
5 0.60 48.0 of expansion joints between terazzo pavements as per site supervisor instruction depth = 0.6m
3. Finishing work
1 140 supply,laying & spread fine crushed aggregate mixed with cement paste under terazzo length = 140m
7.50 1,050.0 paving, tickness of 5-7cm by keeping the design slope so as to enable terazzo paving. width= 7.5m
manfacturer) and 60cm wide handicap terrazzo to accessible peoples with disabilities
1 140 laid on fine aggregate mixed with cement paste. Price shall includes materials and labour length = 140m
7.50 1,050.0 of good quality (color & pattern shall approved by site supervisor) and line drains of width= 7.5m
1 4 approved size by site supervisor at the edge of terazzo pavement where necessary and
Construct 40cm high greenery coverings above terrazo pavement using 12cm thick Brick length = 4m height=
24 0.40 38.4 Wall ( Size 6x12x24 cm ) according to drawing. 0.4m
24 1 Supply and Plant variety of partially grownTrees & flowers planting of selected variety.
(indigenous trees requiring limited or no watering) for outsideof footpath and to a location NO. 24
24.0 shown on the drawing.
B. RETAINING WALL WORK
1.Excavation&Earth work
Trench exca.
1 68.60 +
Cart away surplus excavated material Back fill
58.8 -
9.80 m3
1 140 20cm thick grouted stone pavement under retaining wall bedded and jointed wth 1:3 length = 140m
0.6 84.00 m2 cement mortar ratio width = 0.6m
2. Concrete work
1 140 length = 140m
5cm thick lean concrete quality C-5, 150 kg of cement/m3
0.50 70.0 m2 width = 0.5m
3. Masonry work
1 140 Construct Averege 40cm thick at the top and 70cm at the bottom with required length = 140m
0.50 elevation.hard trachytic or equivalent stone masonry Retaining wall jointed and bedded in width = 0.5m
1 70.00 m3 cement sand mortar (1:3) ratio. depth = 1m
Copping
1 140 40cm width and5cm Cement sand mortar ( 1:2) Copping on top of masonary length = 140m
0.4 56.00 m2 width = 0.4m
Supply and fix 5x7cm zigba wood purlins to a posts according to structural drawing length = 20m
2 20.00 40.0 m
Plastic/Mica roof cover nailed to zigba purlins and roof measured in horizontal projection
2 3.5 length = 3.5m
and all necessary accessories.
width= 2.2m
2.20 15.4 m2
PREPARED BY APPROVED BY
Take off sheet Steel
Project: Pedestrain Walk Way from Azeb House to Siraj Umer Shop
Client: Adola Woyu Town Municipality
Location: Lega Gefersa Kebele
STEEL WORK
PREPARED BY APPROVED BY
SUMMERY OF BILL OF QUANTITY AND SPECIFICATIONS
Project : Pedestrain Walk Way Aseb Restaurant to Car Wash (ExcludingTeshome Tafa BLDG)
Client : Adola Woyu Municipality
Location : Lega Dufa Kebele
Length : 128m
GRAND SUMMARY
TOTAL A + B 2,726,138.02
15% VAT……………………. BIRR 408,920.70
Prepared by Approved by
BILL OF QUANTITY AND SPECIFICATIONS
Project : Pedestrain Walk Way Aseb Restaurant to Car Wash (ExcludingTeshome Tafa BLDG)
Client : Adola Woyu Municipality
P
Location : Lega Dufa Kebele r
e
Length : 128m v
.
e
x
Item Description Contract Amount
Unit Quantity Rate (ETB) q
t
A. TERRAZZO PAVEMENT WORK y
1. Excavation & Earth Work
1.1 Fix Station points, PI, at 10m intervals and setting out using the
leveling instrument for laying out using slope/grades of the LS 128.00 0.5% of TPC 0.00
road.pegging at 10m length interval and 600cm width.
1.2
Top soil excavation(cut) to a depth of 25cm - 30cm & level the surface
with heavy machine (grader) compact with 16 tons roller machine to M3 211.20 176.90 37,361.28
the maximum compaction density.price includes,showering & soil test.
1.3 Load and Cartaway surplus excavated materials from the site to a
M3 211.20 127.70 26,970.24
distance directed by engineer.
1.4 Supply, spread and compact 15cm thick sub-base granular material
from approved borrow sites and compacting to specified camber and M3 105.60 357.30 37,730.88
width to 98% of modified AASHTO density.
1.5 supply,laying & spread fine crushed aggregate to make level under
terazzo paving with 7-10cm thick by keeping the design slope so as to M2 1,050.00 237.20 249,060.00
enable terazzo paving.
Sub-total 351,122.40
2. Concrete work ###
2.1 C-25,360kg/m3,filled in to form work & vibrated -
a
60x20cm C-25 class of concrete at the edges of terazzo pavement and
for a purpose of expansion joints between terazzo pavements as per
M3 4.80 11,646.70 55,904.16
site supervisor instruction. Price shall include 30cmx30cm trenching
for concrete.
3.3 Construct 40cm high greenery coverings above terrazo pavement using
12cm thick Brick Wall ( Size 6x12x24 cm ) according to drawing.
Price shall includes 15x20cm concrete bedding for bricks and pointing M2 38.40 2,623.50 100,742.40
of all exposed surface of brick wall in cement sand mortar of 1 : 3
3.4 Supply and Plant variety of partially grownTrees & flowers planting of
selected variety. (indigenous trees requiring limited or no watering) for
outsideof footpath and to a location shown on the drawing. No 24.00 6,000.00 144,000.00
Sub-total 1,697,207.40
B. RETAINING WALL WORK ###
1. Excavation & Earth Work ###
1.1 Trench excavation for masonry retaining wall to a depth not exceeding
70 cm from reduced level including 25cm work space and can be M3 68.60 482.40 33,092.64
recommended by suppervisor of the site.
1.2
Back fill and compact both sides of stone masonry Retaining wall with
M3 58.80 279.30 16,422.84
selected materials from site to a layer not exceeding 20cm thick.
1.3 Load and Cartaway surplus excavated materials from the site to a
M3 9.80 124.10 1,216.18
distance directed by engineer.
1.4 20cm thick grouted stone pavement under retaining wall bedded and
jointed wth 1:3 cement mortar ratio M2 84.00 613.30 51,517.20
Sub-total 102,248.86
2. Concrete work ###
2.1 5cm thick lean concrete with 150kg/m3 under retaining wall. M2 70.00 388.60 27,202.00
Sub-total 27,202.00
3. Masonry work
3.1 Construct Averege 40cm thick at the top and 50cm at the bottom with
required elevation.hard trachytic or equivalent stone masonry
Retaining wall jointed and bedded in cement sand mortar (1:3) ratio. M3 70.00 5,981.80 418,726.00
Price includes pointing and painting of the exposed masonry surface
and accessory steps for each and every houses.
3.2 40cm width and 5cm thick copping on top of stone masonry Retaining
wall in cement sand mortar (1:2) M2 56.00 580.70 32,519.20
Sub-total 451,245.20
PREPARED BY APPROVED BY
TAKE-OFF SHEET
Project : Pedestrain Walk Way Aseb Restaurant to Car Wash (ExcludingTeshome Tafa BLDG)
Client : Adola Woyu Municipality
Location : Lega Dufa Kebele
Length : 128m
1 128 Supply, spread and compact 15cm thick sub-base granular material from approved length = 128m
5.5 borrow sites width = 5.5m
0.15 105.6 m3 depth = 0.15m
1 0 Fill & compact 5-7cm thick red-ash (scoria) in walk way area on the top of compacted
0 selected granural fill.
0 - m3
1 128 supply,laying & spread fine crushed aggregate to make level under terazzo paving with length = 128m
5.5 704.00 m2 7-10cm thick by keeping the design slope so as to enable terazzo paving. width = 5.5m
2. Concrete work
5 7 60x20cm C-25 class of concrete at the edges of terazzo pavement and for a purpose of length = 7m
0.2 expansion joints between terazzo pavements as per site supervisor instruction. width = 0.2m
0.6 4.2 m3 depth = 0.6m
2 7 Formwork for 60x20cm C-25 class of concrete at the edges of pavement and for a length = 7m
5 0.60 42.0 purpose of expansion joints between terazzo pavements as per site supervisor instruction depth = 0.6m
3. Finishing work
1 128 supply,laying & spread fine crushed aggregate mixed with cement paste under terazzo length = 128m
5.50 704.0 Provide and lay terrazzo
paving, tickness of 5-7cmtiles of size 30x15x5cm
by keeping (thickness
the design slope so as to be specified
enable by paving.
terazzo width= 5.5m
1 128 manfacturer) and 60cm wide handicap terrazzo to accessible peoples with disabilities
laid on fine aggregate mixed with cement paste. Price shall includes materials and length = 128m
5.50 704.0 labour of good quality (color & pattern shall approved by site supervisor) and line width= 5.5m
drains of approved size by site supervisor at the edge of terazzo pavement where
1 4 Construct
necessary 40cm highshall
and Price greenery coverings
includes aboveaccessories.
all possible terrazo pavement using 12cm thick length = 4m height=
22 0.40 35.2 Brick Wall ( Size 6x12x24 cm ) according to drawing. 0.4m
22 1 Supply and Plant variety of partially grownTrees & flowers planting of selected variety.
(indigenous trees requiring limited or no watering) for outsideof footpath and to a NO. 22
22.0 location shown on the drawing.
B. RETAINING WALL WORK
1.Excavation&Earth work
Trench exca.
1 62.72 +
Cart away surplus excavated material Back fill
53.8 -
8.96 m3
1 128 20cm thick grouted stone pavement under retaining wall bedded and jointed wth 1:3 length = 128m
0.6 76.80 m2 cement mortar ratio width = 0.6m
2. Concrete work
1 128 length = 128m
5cm thick lean concrete quality C-5, 150 kg of cement/m3
0.50 64.0 m2 width = 0.5m
3. Masonry work
1 128 Construct Averege 40cm thick at the top and 70cm at the bottom with required length = 128m
0.50 elevation.hard trachytic or equivalent stone masonry Retaining wall jointed and bedded width = 0.5m
1.2 76.80 m3 in cement sand mortar (1:3) ratio. depth = 1.2m
Copping
1 128 40cm width and5cm Cement sand mortar ( 1:2) Copping on top of masonary length = 128m
0.4 51.20 m2 width = 0.4m
PREPARED BY APPROVED BY
SUMMARY OF BILL OF QUANTITY AND SPECIFICATIONS
Project : Pedestrain Walk Way from Robe Clinic to Sefina House
Length : 155m
GRAND SUMMARY
TOTAL A + B 2,662,650.48
15% VAT……………………. BIRR 399,397.57
Prepared by Approved by
BILL OF QUANTITY AND SPECIFICATIONS
Project : Pedestrain Walk Way from Robe Clinic to Sefina House
Client : Adola Woyu Municipality P
Location : Lega Gefersa Kebele r
e
Length : 155m v
.
e
x
Item Description Contract Amount
Unit Quantity Rate (ETB) q
t
A. TERRAZZO PAVEMENT WORK y
1. Excavation & Earth Work
1.1 Fix Station points, PI, at 10m intervals and setting out using the
leveling instrument for laying out using slope/grades of the LS 155.00 0.5% of TPC 0.00
road.pegging at 10m length interval and 600cm width.
1.2
Top soil excavation(cut) to a depth of 25cm - 30cm & level the surface
with heavy machine (grader) compact with 16 tons roller machine to M3 232.50 176.90 41,129.25
the maximum compaction density.price includes,showering & soil test.
1.3 Load and Cartaway surplus excavated materials from the site to a
M3 232.50 127.70 29,690.25
distance directed by engineer.
1.4 Supply, spread and compact 35-40cm thick selected material from
approved borrow sites and compacting to specified camber and width M3 310.00 279.30 86,583.00
to 98% of modified AASHTO density.
1.5 Supply, spread and compact 15cm thick sub-base granular material
from approved borrow sites and compacting to specified camber and M3 116.25 357.30 41,536.13
width to 98% of modified AASHTO density.
1.6 supply,laying & spread fine crushed aggregate to make level under
terazzo paving with 7-10cm thick by keeping the design slope so as to M2 775.00 237.20 183,830.00
enable terazzo paving.
Sub-total 382,768.63
2. Concrete work ###
2.1 C-25,360kg/m3,filled in to form work & vibrated -
a
60x20cm C-25 class of concrete at the edges of terazzo pavement and
for a purpose of expansion joints between terazzo pavements as per site
M3 3.36 11,646.70 39,132.91
supervisor instruction. Price shall include 30cmx30cm trenching for
concrete.
3.4 Supply and Plant variety of partially grownTrees & flowers planting of
selected variety. (indigenous trees requiring limited or no watering) for
outsideof footpath and to a location shown on the drawing. No 26.00 6,000.00 156,000.00
Sub-total 1,337,195.10
B. RETAINING WALL WORK ###
1. Excavation & Earth Work ###
1.1 Trench excavation for masonry retaining wall to a depth not exceeding
70 cm from reduced level including 25cm work space and can be M3 75.95 482.40 36,638.28
recommended by suppervisor of the site.
1.2
Back fill and compact both sides of stone masonry Retaining wall with
M3 65.10 279.30 18,182.43
selected materials from site to a layer not exceeding 20cm thick.
1.3 Load and Cartaway surplus excavated materials from the site to a
M3 10.85 124.10 1,346.48
distance directed by engineer.
1.4 20cm thick grouted stone pavement under retaining wall bedded and
jointed wth 1:3 cement mortar ratio M2 93.00 613.30 57,036.90
Sub-total 113,204.09
2. Concrete work ###
2.1 5cm thick lean concrete with 150kg/m3 under retaining wall. M2 77.50 388.60 30,116.50
Sub-total 30,116.50
3. Masonry work
3.1 Construct Averege 40cm thick at the top and 50cm at the bottom with
required elevation.hard trachytic or equivalent stone masonry
Retaining wall jointed and bedded in cement sand mortar (1:3) ratio. M3 116.25 5,981.80 695,384.25
Price includes pointing and painting of the exposed masonry surface
and accessory steps for each and every houses.
3.2 40cm width and 5cm thick copping on top of stone masonry Retaining
wall in cement sand mortar (1:2) M2 62.00 580.70 36,003.40
Sub-total 731,387.65
PREPARED BY APPROVED BY
TAKE-OFF SHEET
Project : Pedestrain Walk Way from Robe Clinic to Sefina House
Client : Adola Woyu Municipality
Location : Lega Gefersa Kebele
Length : 155m
1 0 Fill & compact 5-7cm thick red-ash (scoria) in walk way area on the top of compacted selected
0 granural fill.
0 - m3
1 155 supply,laying & spread fine crushed aggregate to make level under terazzo paving with 7-10cm thick length = 155m
5 775.00 m2 by keeping the design slope so as to enable terazzo paving. width = 5m
2. Concrete work
4 7 60x20cm C-25 class of concrete at the edges of terazzo pavement and for a purpose of expansion length = 7m
0.2 joints between terazzo pavements as per site supervisor instruction. width = 0.2m
0.6 3.4 m3 depth = 0.6m
2 7 Formwork for 60x20cm C-25 class of concrete at the edges of pavement and for a purpose of length = 7m
4 0.60 33.6 expansion joints between terazzo pavements as per site supervisor instruction depth = 0.6m
3. Finishing work
1 155 supply,laying & spread fine crushed aggregate mixed with cement paste under terazzo paving, length = 155m
5.00 775.0 Provide
tickness and lay terrazzo
of 5-7cm tiles of
by keeping thesize 30x15x5cm
design slope so (thickness toterazzo
as to enable be specified by manfacturer) and 60cm
paving. width= 5m
1 155 wide handicap terrazzo to accessible peoples with disabilities laid on fine aggregate mixed with
length = 155m
cement paste. Price shall includes materials and labour of good quality (color & pattern shall
5.00 775.0 width= 5m
approved by site supervisor) and line drains of approved size by site supervisor at the edge of terazzo
1 4 Construct 40cm high
pavement where greenery
necessary andcoverings
Price shallabove terrazo
includes pavement
all possible using 12cm thick Brick Wall ( Size
accessories. length = 4m
26 0.40 41.6 6x12x24 cm ) according to drawing. height= 0.4m
26 1 Supply and Plant variety of partially grownTrees & flowers planting of selected variety. (indigenous
NO. 26
26.0 trees requiring limited or no watering) for outsideof footpath and to a location shown on the drawing.
B. RETAINING WALL WORK
1.Excavation&Earth work
Trench exca.
1 75.95 +
Cart away surplus excavated material Back fill
65.1 -
10.85 m3
1 155 20cm thick grouted stone pavement under retaining wall bedded and jointed wth 1:3 cement mortar length = 155m
0.6 93.00 m2 ratio width = 0.6m
2. Concrete work
1 155 length = 155m
5cm thick lean concrete quality C-5, 150 kg of cement/m3
width = 0.5m
length = 155m
5cm thick lean concrete quality C-5, 150 kg of cement/m3
0.50 77.5 m2 width = 0.5m
3. Masonry work
1 155 Construct Averege 40cm thick at the top and 70cm at the bottom with required elevation.hard length = 155m
0.50 trachytic or equivalent stone masonry Retaining wall jointed and bedded in cement sand mortar (1:3) width = 0.5m
1.5 116.25 m3 ratio. depth = 1.5m
Copping
1 155 40cm width and5cm Cement sand mortar ( 1:2) Copping on top of masonary length = 155m
0.4 62.00 m2 width = 0.4m
PREPARED BY APPROVED BY
Take off sheet for SH
Project: Pedestrain Walk Way from Sefina House to Azeb House
Client: Adola Woyu Town Municipality
Location: Oda Dola Kebele
STEEL WORK
STEEL WORK
Total
No. of No. of No of Length
member SHS SHS m
2 4 8 4.000
2 4 8 1.800
2 2 4 2.000
OTAL LENGTH
WEIGHT PER M.
TAL WEIGHT Kg.
SIZE OF SHS
50x50x3mm
32.00
14.40
8.00
54.400
2.920
158.848
SUMMERY OF BILL OF QUANTITY AND SPECIFICATIONS
Project : Pedestrain Walk Way from ERA Road to Mehret Clinic
Client : Adola Woyu Municipality
Location : Kilta Eba Kebele
Length : 140m
GRAND SUMMARY
TOTAL A + B 2,269,827.35
15% VAT……………………. BIRR 340,474.10
Prepared by Approved by
BILL OF QUANTITY AND SPECIFICATIONS
Project : Pedestrain Walk Way from ERA Road to Mehret Clinic
P
Client : Adola Woyu Municipality r
e
Location : Kilta Eba Kebele v
.
Length : 140m e
x
Contract Amount
Item Description Unit Quantity Rate
(ETB) q
t
A. TERRAZZO PAVEMENT WORK y
1. Excavation & Earth Work
1.1 Fix Station points, PI, at 10m intervals and setting out using the leveling instrument
for laying out using slope/grades of the road.pegging at 10m length interval and LS 140.00 0.5% of TPC 0.00
600cm width.
1.2 Top soil excavation(cut) to a depth of 25cm - 30cm & level the surface with heavy
machine (grader) compact with 16 tons roller machine to the maximum compaction M3 231.00 176.90 40,863.90
density.price includes,showering & soil test.
1.3 Load and Cartaway surplus excavated materials from the site to a distance directed
M3 231.00 127.70 29,498.70
by engineer.
1.4 Supply, spread and compact 15cm thick sub-base granular material from approved
borrow sites and compacting to specified camber and width to 98% of modified M3 115.50 357.30 41,268.15
AASHTO density.
1.5
supply,laying & spread fine crushed aggregate to make level under terazzo paving
M2 770.00 237.20 182,644.00
with 7-10cm thick by keeping the design slope so as to enable terazzo paving.
Sub-total 294,274.75
2. Concrete work ###
2.1 C-25,360kg/m3,filled in to form work & vibrated -
a
60x20cm C-25 class of concrete at the edges of terazzo pavement and for a purpose
of expansion joints between terazzo pavements as per site supervisor instruction. M3 4.20 11,646.70 48,916.14
Price shall include 30cmx30cm trenching for concrete.
Formwork for 60x20cm C-25 class of concrete at the edges of pavement and for a
purpose of expansion joints between terazzo pavements as per site supervisor M2 42.00 858.50 36,057.00
instruction
b
Sub-total 84,973.14
3. Finishing work
3.1 supply,laying & spread fine crushed aggregate mixed with cement paste under
terazzo paving, tickness of 5-7cm by keeping the design slope so as to enable
terazzo paving.(Fine aggregate should be from approved stone crusher site.)
M2 770.00 345.50 266,035.00
3.2 Provide and lay terrazzo tiles of size 30x15x5cm (thickness to be specified by
manfacturer) and 60cm wide handicap terrazzo to accessible peoples with
disabilities laid on fine aggregate mixed with cement paste. Price shall includes
materials and labour of good quality (color & pattern shall approved by site
supervisor) and line drains of approved size by site supervisor at the edge of terazzo
pavement where necessary and Price shall includes all possible accessories. M2 770.00 1,037.80 799,106.00
3.3 Construct 40cm high greenery coverings above terrazo pavement using 12cm thick
Brick Wall ( Size 6x12x24 cm ) according to drawing. Price shall includes 15x20cm
concrete bedding for bricks and pointing of all exposed surface of brick wall in
cement sand mortar of 1 : 3 M2 38.40 2,623.50 100,742.40
3.4 Supply and Plant variety of partially grownTrees & flowers planting of selected
variety. (indigenous trees requiring limited or no watering) for outsideof footpath No 24.00 6,000.00 144,000.00
and to a location shown on the drawing.
Sub-total 1,309,883.40
B. RETAINING WALL WORK ###
1. Excavation & Earth Work ###
1.1 Trench excavation for masonry retaining wall to a depth not exceeding 70 cm from
reduced level including 25cm work space and can be recommended by suppervisor M3 68.60 482.40 33,092.64
of the site.
1.2
Back fill and compact both sides of stone masonry Retaining wall with selected
M3 58.80 279.30 16,422.84
materials from site to a layer not exceeding 20cm thick.
1.3
Load and Cartaway surplus excavated materials from the site to a distance directed
M3 9.80 124.10 1,216.18
by engineer.
1.4 20cm thick grouted stone pavement under retaining wall bedded and jointed wth
1:3 cement mortar ratio M2 84.00 613.30 51,517.20
Sub-total 102,248.86
2. Concrete work ###
2.1 5cm thick lean concrete with 150kg/m3 under retaining wall. M2 70.00 388.60 27,202.00
Sub-total 27,202.00
3. Masonry work
3.1 Construct Averege 40cm thick at the top and 50cm at the bottom with required
elevation.hard trachytic or equivalent stone masonry Retaining wall jointed and
bedded in cement sand mortar (1:3) ratio. Price includes pointing and painting of the M3 70.00 5,981.80 418,726.00
exposed masonry surface and accessory steps for each and every houses.
3.2 40cm width and 5cm thick copping on top of stone masonry Retaining wall in
cement sand mortar (1:2) M2 56.00 580.70 32,519.20
Sub-total 451,245.20
PREPARED BY APPROVED BY
TAKE-OFF SHEET
Project : Pedestrain Walk Way from ERA Road to Mehret Clinic
Client : Adola Woyu Municipality
Location : Kilta Eba Kebele
Length : 140m
1 0 Fill & compact 5-7cm thick red-ash (scoria) in walk way area on the top of compacted selected
0 granural fill.
0 - m3
1 140 supply,laying & spread fine crushed aggregate to make level under terazzo paving with 7-10cm thick length = 140m
5.5 770.00 m2 by keeping the design slope so as to enable terazzo paving. width = 5.5m
2. Concrete work
5 7 60x20cm C-25 class of concrete at the edges of terazzo pavement and for a purpose of expansion length = 7m
0.2 joints between terazzo pavements as per site supervisor instruction. width = 0.2m
0.6 4.2 m3 depth = 0.6m
2 7 Formwork for 60x20cm C-25 class of concrete at the edges of pavement and for a purpose of length = 7m
5 0.60 42.0 expansion joints between terazzo pavements as per site supervisor instruction depth = 0.6m
3. Finishing work
1 140 supply,laying & spread fine crushed aggregate mixed with cement paste under terazzo paving, length = 140m
5.50 770.0 tickness of 5-7cm by keeping the design slope so as to enable terazzo paving. width= 5.5m
1 140 wide handicap terrazzo to accessible peoples with disabilities laid on fine aggregate mixed with
length = 140m
cement paste. Price shall includes materials and labour of good quality (color & pattern shall
5.50 770.0 width= 5.5m
approved by site supervisor) and line drains of approved size by site supervisor at the edge of terazzo
1 4 Construct 40cm high greenery coverings above terrazo pavement using 12cm thick Brick Wall ( Size length = 4m
24 0.40 38.4 6x12x24 cm ) according to drawing. height= 0.4m
24 1 Supply and Plant variety of partially grownTrees & flowers planting of selected variety. (indigenous
NO. 24
24.0 trees requiring limited or no watering) for outsideof footpath and to a location shown on the drawing.
B. RETAINING WALL WORK
1.Excavation&Earth work
Trench exca.
1 68.60 +
Cart away surplus excavated material Back fill
58.8 -
9.80 m3
1 140 20cm thick grouted stone pavement under retaining wall bedded and jointed wth 1:3 cement mortar length = 140m
0.6 84.00 m2 ratio width = 0.6m
2. Concrete work
1 140 length = 140m
5cm thick lean concrete quality C-5, 150 kg of cement/m3
0.50 70.0 m2 width = 0.5m
3. Masonry work
1 140 Construct Averege 40cm thick at the top and 70cm at the bottom with required elevation.hard length = 140m
0.50 trachytic or equivalent stone masonry Retaining wall jointed and bedded in cement sand mortar (1:3) width = 0.5m
1 70.00 m3 ratio. depth = 1m
Copping
1 140 40cm width and5cm Cement sand mortar ( 1:2) Copping on top of masonary length = 140m
0.4 56.00 m2 width = 0.4m
PREPARED BY APPROVED BY
SUMMERY OF BILL OF QUANTITY AND SPECIFICATIONS
Project : Pedestrain Walk Way from Adola Elementary School Entrance to Mikael Church Entrance
Client : Adola Woyu Municipality
Location : Lega Dufa Kebele
Length : 145m
GRAND SUMMARY
Prepared by Approved by
BILL OF QUANTITY AND SPECIFICATIONS
Project : Pedestrain Walk Way from Adola Elementary School Entrance to Mikael Church Entrance
Client : Adola Woyu Municipality
Location : Lega Dufa Kebele
Length : 145m
Contract Amount
Item Description Unit Quantity Rate
(ETB)
A) Sub Structure
1.3 Trench excavation for masonry retaining wall to a depth not exceeding
70 cm from reduced level including 25cm work space and can be M3 101.50 482.40 48,963.60
recommended by suppervisor of the site.
1.4
Back fill and compact both sides of stone masonry Retaining wall with
M3 104.40 279.30 29,158.92
selected materials from site to a layer not exceeding 20cm thick.
1.5 Load and Cartaway surplus excavated materials from the site to a
M3 214.60 124.10 26,631.86
distance directed by engineer.
1.6 Supply, spread and compact 15cm thick sub-base granular material
from approved borrow sites and compacting to specified camber and M3 108.75 357.30 38,856.38
width to 98% of modified AASHTO density
1.7 20cm thick grouted stone pavement under retaining wall bedded and
jointed wth 1:3 cement mortar ratio M2 130.50 613.30 80,035.65
1.8 Fill & compact 5cm-7cm thick red-ash (base course or scoria) in walk
M3 50.75 2,631.60 133,553.70
way area on the top of compacted selected granural fill.
1.9 supply,laying & spread fine crushed aggregate to make level under
terazzo paving with 7cm thick by keeping the design slope so as to M2 725.00 237.20 171,970.00
enable terazzo paving.
Sub-total:------------------------------------------------- 562,817.36
2 Masonery work
2.1 Construct Averege 40cm thick at the top and 70cm at the bottom with
required elevation.hard trachytic or equivalent stone masonry
Retaining wall jointed and bedded in cement sand mortar (1:3) ratio. M3 87.00 5,981.80 520,416.60
Price includes pointing and painting of the exposed masonry surface
and accessory steps for each and every houses.
2.2 40cm width and 5cm thick copping on top of stone masonry Retaining
wall in cement sand mortar (1:2) M2 58.00 580.70 33,680.60
Sub-total:------------------------------------------------- 554,097.20
3 Concrete work
3.1 5cm thick lean concrete with 150kg/m3 under retaining wall. M2 101.50 388.60 39,442.90
3.2 C-25,360kg/m3,filled in to form work & vibrated -
a A) (40*15cm AGL and 40*15cm BGL ) size concerete curbstone for
walk way greenary as detailed in the design drawing.Price shall
includes placing of lean concrete and any excavation which may be M3 13.06 11,646.70 152,059.32
required preparation for concrete work & final finish of the concerete
surface as per the engineers approval.
b
60x20cm C-25 class of concrete at the edges of terazzo pavement and
for a purpose of expansion joints between terazzo pavements as per
M3 4.20 11,646.70 48,916.14
site supervisor instruction. Price shall include 30cmx30cm trenching
for concrete.
c Provide,cut & fix in position sawn zigba or sheet metal panel
formwork to greenary concrete. M2 130.56 858.50 112,085.76
4.1 Supply and Plant variety of partially grownTrees & flowers planting of
selected variety. (indigenous trees requiring limited or no watering) for
outsideof footpath and to a location shown on the drawing. No 24.00 -
Sub-total 752,405.00
PREPARED BY APPROVED BY
TAKE-OFF SHEET
Project : Pedestrain Walk Way from Adola Elementary School Entrance to Mikael Church Entrance
Client : Adola Woyu Municipality
Location : Lega Dufa Kebele
Length : 145m
Supply, spread and compact 15cm thick sub-base granular material from approved borrow sites
3. Concrete work
1 145 5cm thick lean concrete quality C-5, 150 kg of cement/m3 length = 145m width
0.70 101.5 m2 = 0.7m
(40*15cm AGL and 40*15cm BGL ) size of C-25 concerete curbstone for walk way greenary as
detailed in the design drawing.
24 3.4 length = 3.4m width
0.2 = 0.2m depth =
0.8m
length = 3.4m width
= 0.2m depth =
0.8 13.1 m3 0.8m
60x20cm C-25 class of concrete at the edges of terazzo pavement and for a purpose of expansion
joints between terazzo pavements as per site supervisor instruction.
5 7 length = 7m width
0.2 = 0.2m depth =
0.6 4.2 m3 0.6m
Formwork
2 3.4 Provide,cut & fix in position sawn zigba or sheet metal panel formwork to greenary concrete. length = 3.4m depth
24 0.80 130.6 = 0.8m
Formwork for 60x20cm C-25 class of concrete at the edges of pavement and for a purpose of
2 7 length = 7m depth
expansion joints between terazzo pavements as per site supervisor instruction
= 0.6m
5 0.60 42.0
6. Finishing work
Provide and lay terrazzo tiles of size 30x15x5cm (thickness to be specified by manfacturer) laid on
1 145 cement mortar 1:3 including 40mm thick cement sand screed ,grouting the joints with white cement length = 145m
and matching pigments,etc width= 5m
5.00 725.0
PREPARED BY APPROVED BY
COMMERCIAL BANK OF ETHIOPIA TO MOSQUE
Description
Contract
A) Sub Structure Unit
Qty.
Sub-total:-------------------------------------------------
3.Concrete work
3.1 5cm thick lean concrete with 150kg/m3 under curbstone wall. m2 52.50
3.3 C-25,360kg/m3,filled in to form work & vibrated
3.4 A) (40*15cm AGL and 40*15cm BGL ) size concerete curbstone for m3 5.30
walk way greenary as detailed in the design drawing.Price shall
includes placing of lean concrete .any excavation which may be
required preparation for concreting work & final finish of the
concerete surface as per the engineers approval
3.5 Provide,cut & fix in position sawn zigba or sheet metal panel m2 70.72
formwork to greenary concrete.
Sub-total
4 Finishing work
4.1 30x15x5cm terrazo pavement around walk way fixed or binded with m2 375.00
cement mortar and Provide,& apply painting to all plastered surface
of retaining wall ,(colour,and pattern to be approved for terazzo
pavements) and Price shall includes all possible accessories.
4.1 Planting of special trees approved by supervisor for greenary part. No 74.00
124.10 9,772.88
613.30 41,397.75 75 0.9 67.5
390,339.38
5,981.80 370,093.97
858.50 60,713.12
3.4 0.8 2 13 70.72
142,842.13
375
-
389,175.00
1,292,450.47
193,867.57
1,486,318.04
MUSLIM RESTAURANT TO TESHOME TAFA
Description
Contract
A) Sub Structure Unit
Qty.
Sub-total:-------------------------------------------------
3.Concrete work
3.1 5cm thick lean concrete with 150kg/m3 under curbstone wall. m2 59.50
3.3 C-25,360kg/m3,filled in to form work & vibrated
3.4 A) (40*15cm AGL and 40*15cm BGL ) size concerete curbstone for m3 6.12
walk way greenary as detailed in the design drawing.Price shall
includes placing of lean concrete .any excavation which may be
required preparation for concreting work & final finish of the
concerete surface as per the engineers approval
3.5 Provide,cut & fix in position sawn zigba or sheet metal panel m2 81.60
formwork to greenary concrete.
Sub-total
4 Finishing work
4.1 30x15x5cm terrazo pavement around walk way fixed or binded with m2 425.00
cement mortar and Provide,& apply painting to all plastered surface
of retaining wall ,(colour,and pattern to be approved for terazzo
pavements) and Price shall includes all possible accessories.
4.1 Planting of special trees approved by supervisor for greenary part. No 74.00
124.10 1,845.99
613.30 46,917.45 85 0.9 76.5
387,131.44
5,981.80 419,473.73
858.50 70,053.60
3.4 0.8 2 15 81.6
164,453.10
425
-
441,065.00
1,412,123.27
211,818.49
1,623,941.76
MUSLIM RESTAURANT TO TESHOME TAFA
Description
Contract
A) Sub Structure Unit
Qty.
Sub-total:-------------------------------------------------
3.Concrete work
3.1 5cm thick lean concrete with 150kg/m3 under curbstone wall. m2 49.00
3.3 C-25,360kg/m3,filled in to form work & vibrated
3.4 A) (40*15cm AGL and 40*15cm BGL ) size concerete curbstone for m3 4.90
walk way greenary as detailed in the design drawing.Price shall
includes placing of lean concrete .any excavation which may be
required preparation for concreting work & final finish of the
concerete surface as per the engineers approval
3.5 Provide,cut & fix in position sawn zigba or sheet metal panel m2 65.28
formwork to greenary concrete.
Sub-total
4 Finishing work
4.1 30x15x5cm terrazo pavement around walk way fixed or binded with m2 350.00
cement mortar and Provide,& apply painting to all plastered surface
of retaining wall ,(colour,and pattern to be approved for terazzo
pavements) and Price shall includes all possible accessories.
4.1 Planting of special trees approved by supervisor for greenary part. No 74.00
124.10 9,121.35
613.30 38,637.90 70 0.9 63
364,316.75
5,981.80 345,448.95
11,646.70 57,022.24
858.50 56,042.88
3.4 0.8 2 12 65.28
132,106.52
350
-
363,230.00
1,205,102.22
180,765.33
1,385,867.56
MUSLIM RESTAURANT TO TESHOME TAFA
Description
Contract
A) Sub Structure Unit
Qty.
Sub-total:-------------------------------------------------
3.Concrete work
3.1 5cm thick lean concrete with 150kg/m3 under curbstone wall. m2 155.40
3.3 C-25,360kg/m3,filled in to form work & vibrated
3.4 A) (40*15cm AGL and 40*15cm BGL ) size concerete curbstone for m3 15.10
walk way greenary as detailed in the design drawing.Price shall
includes placing of lean concrete .any excavation which may be
required preparation for concreting work & final finish of the
concerete surface as per the engineers approval
3.5 Provide,cut & fix in position sawn zigba or sheet metal panel m2 201.28
formwork to greenary concrete.
Sub-total
4 Finishing work
4.1 30x15x5cm terrazo pavement around walk way fixed or binded with m2 1,110.00
cement mortar and Provide,& apply painting to all plastered surface
of retaining wall ,(colour,and pattern to be approved for terazzo
pavements) and Price shall includes all possible accessories.
4.1 Planting of special trees approved by supervisor for greenary part. No 74.00
124.10 28,927.71
613.30 122,537.34 222 0.9 199.8
1,155,404.55
5,981.80 1,095,566.67
11,646.70 175,818.58
858.50 172,798.88
3.4 0.8 2 37 201.28
409,005.90
1110
-
1,151,958.00
3,811,935.12
571,790.27
4,383,725.39
MUSLIM RESTAURANT TO TESHOME TAFA
Description
Contract
A) Sub Structure Unit
Qty.
Sub-total:-------------------------------------------------
3.Concrete work
3.1 5cm thick lean concrete with 150kg/m3 under curbstone wall. m2 98.00
3.3 C-25,360kg/m3,filled in to form work & vibrated
3.4 A) (40*15cm AGL and 40*15cm BGL ) size concerete curbstone for m3 9.79
walk way greenary as detailed in the design drawing.Price shall
includes placing of lean concrete .any excavation which may be
required preparation for concreting work & final finish of the
concerete surface as per the engineers approval
3.5 Provide,cut & fix in position sawn zigba or sheet metal panel m2 130.56
formwork to greenary concrete.
Sub-total
4 Finishing work
4.1 30x15x5cm terrazo pavement around walk way fixed or binded with m2 700.00
cement mortar and Provide,& apply painting to all plastered surface
of retaining wall ,(colour,and pattern to be approved for terazzo
pavements) and Price shall includes all possible accessories.
4.1 Planting of special trees approved by supervisor for greenary part. No 74.00
124.10 18,242.70
613.30 77,275.80 140 0.9 126
728,633.50
5,981.80 552,718.32
858.50 112,085.76
3.4 0.8 2 24 130.56
264,213.05
700
-
726,460.00
2,272,024.87
340,803.73
2,612,828.60
MUSLIM RESTAURANT TO TESHOME TAFA
Description
Contract
A) Sub Structure Unit
Qty.
1 Excavation & Earth Work
1.1 Fix Station points, PI, at 100 intervals and setting out using the
leveling instrument for laying out using slope/grades of the
road.pegging at 20m length interval and 850cm width.
ML 440.00
1.3
Bulk excavation to depth 25cm - 30cm & level the surface with heavy
machine (grader) compact with 16 tons roller machine to the M3
maximum compaction density.price includes,showering & soil test.
755.00
1.4 Trench excavation for masonry retaining wall;can be recommended
m3
by suppervisor of the site 105.70
1.5
Backk fill fine selected materials & compact well in layers not
exceeding 20cm thick;between both masonary walk way that design
location area of width 8m height from 65cm to 80cm.price M3
inlcudes,showering,well rolled,level surface with heavy
machine,grader & compact with 16 tonsler machine.
135.90
1.6 Fill & compact 12cm - 15cm thick red-ash (scoria) in walk way area on
m3
the top of compacted selected granural fill. 113.25
1.7
supply,laying & spread fine crushed aggregate to make level under
terazzo paving with 5-7cm thick by keeping the design slope so as to m3
enable terazzo paving. 755.00
1.8 Load and Cartaway surplus excavated materials from the site to a
distance not exceeding 5km,directed by engineer. M3 158.55
Hard core under retaining wall m3 135.90
Sub-total:-------------------------------------------------
2 Masonery work
2.1 For walk way did masonery wall top width of 25-30cm,height 80 to m3 124.58
100cm & base width 45-50cm which is vary from one step to another
Sub-total:-------------------------------------------------
step of masonery wall as per order of project suppervisor.
3.Concrete work
3.1 5cm thick lean concrete with 150kg/m3 under curbstone wall. m2 105.70
3.3 C-25,360kg/m3,filled in to form work & vibrated
3.4 A) (40*15cm AGL and 40*15cm BGL ) size concerete curbstone for m3 10.61
walk way greenary as detailed in the design drawing.Price shall
includes placing of lean concrete .any excavation which may be
required preparation for concreting work & final finish of the
concerete surface as per the engineers approval
3.5 Provide,cut & fix in position sawn zigba or sheet metal panel m2 141.44
formwork to greenary concrete.
Sub-total
4 Finishing work
4.1 30x15x5cm terrazo pavement around walk way fixed or binded with m2 755.00
cement mortar and Provide,& apply painting to all plastered surface
of retaining wall ,(colour,and pattern to be approved for terazzo
pavements) and Price shall includes all possible accessories.
4.1 Planting of special trees approved by supervisor for greenary part. No 74.00
124.10 19,676.06
613.30 83,347.47 151 0.9 135.9
785,883.28
858.50 121,426.24
3.4 0.8 2 26 141.44
286,049.45
755
-
783,539.00
2,600,654.46
390,098.17
2,990,752.63
Take off sheet for SH
Project: Project :Pedestrain Walk Way from Dessie Shop to Ato Abera Beer Distribu
Client: Client : Adola Woyu Town Municipality
Location: Location : Oda Dola Kebele
STEEL WORK
Prepared by
ake off sheet for SHS
Ato Abera Beer Distribution
STEEL WORK
Total
No. of No. of No of Length
member SHS SHS m
2 4 8 3.500
2 4 8 1.800
2 2 4 2.000
OTAL LENGTH
WEIGHT PER M.
TAL WEIGHT Kg.
Approved by
SIZE OF SHS
50x50x3mm
28.00
14.40
8.00
50.400
2.920
147.168
oved by