Fix station PI. At 100-200m intervals for reference of the center line of the road.
Where there is a horizontal curve or vertical curve the interval of the PI will be Km 0.20 7,170.00 1,429.29
less than 100m.
1.2
Setting out
Fix center line of the road by putting pegs at 20m intervals including setting of
horizontal and vertical curve s. set out also cross-section of the road at 20m
intervals or less as convenient, if terrain is very ragged, by placing pegs on
center, two sides and drainage lines of the road as well as following design
patterns of the cobblestone. Pegs for cobblestone roads are in most cases made Km 0.20 7,170.00 1,429.29
from pieces of reinforcement steel for accuracy and strength for driving them
deep into the ground. The number of pegs along the cross-section of the road
ranges from 7 to 13 depending on the pattern of the cobblestone and requirement
of side drains.
Remove big stones, grass and other obstacles within width of the road reserve to
allow movement of workers for smooth surveying and setting out works. The 1,778.97
Ha 0.20 8,924.16
material or debris as a result of cleaning and grubbing will be deposited to the
location as directed by the engineer.
Excavate the top 20cm soil to remove the soil with grass & organic layer of the
soil which is very weak, compressible and not required for road construction. m2 1,993.43 9.31 18,550.62
The excavated material will be deposited at a place directed by the Engineer.
Cartaway the excavated material and deposited at a place directed by the 30,738.69
2.6 m3 1,196.06 25.70
Engineer. At least(4 to 5km).
Supply and lay to the required level 10*10*10, 9x9x9 & 8x8x8cm shaped
cobble stones made of hard rocks as per the lay out design & slope for the main 291,638.81
m2 1,515.01 192.50
body of the road and 17*15*15cm shaped edge cobble stone s following the
design pattern of the cobblestone road pavement
Supply, fill and compact the 10mm space or void between the cobblestone with
fine crushed aggregate to prevent the movement of the stones due to traffic and m2 1,515.01 42.88 64,963.49
make the pavement stiff. The surface should be cleaned after wards.
Supply and fix 40*20cm shaped curbstone, 30 to 40cm long each, between
pavement and side walk, along both sides of the road, storm water way, with a
cement mortar base of 1:3 mix and backed with c-15 concrete on the external 45,818.66
ml 797.37 57.46
side of the road, for support, as shown in the design and fill joints with cement
mortar of 1:3 mix. Additional hand tools for the activity are measuring box (for
sand and crushed aggregate),bucket, plasterer knife,etc.
4.2
Supply and fix 20*20cm shaped Big stone, 20cm long each, along trasverse
direction of the pavement with in the interval of every 20m to make the cobble
stone pavement tough with a cement mortar base of 1:3 mix and backed with c-
15 concrete on the both side of the big stone, for support, as shown in the design ml 91.20 81.46 7,429.34
and fill joints with cement mortar of 1:3 mix. Additional hand tools for the
activity are measuring box (for sand and crushed aggregate),bucket, plasterer
knife,etc.
supply and fix 50*30cm shaped curvedstone side drains to drain rain water
where necessary, the curved part is 5cm deep out of 10 cm thick. the length of 1,594.74 188,275.48
ml 118.06
the stone pcs is 30 to 50cm and to be laid on a compacted base and c-15
concerte and joint filled with cement mortar 1:3.
5.1
199.343
199.343
1 7.6 1515.0068 3.1 Laying of fine aggregate
199.343
7.6 1515.0068 3.2Cobblestone Paving
199.343
1 7.6 1515.0068 3.3 Filling voids
4.Curbstone
199.343 4.1.Curbstones
4 797.372
4.2.Big stone
12 1
7.6 91.2
Prepared by Chacked by
CERTIFICATE OF PAYMENT NO-2
Chainage
PAYMENT CERITFICATE
Date
1-As per the attached statement the value of work executed and /or
Descripti materials supplied by the contractor to date before vat is 858,411.21
NO. on Amount (BIRR)
With VAT
………………………….
after rebate
1 Adv 233,819.87 VAT 15% 128,761.68
4. Penality
Fix center line of the road by putting pegs at 20m intervals including setting of
horizontal and vertical curve s. set out also cross-section of the road at 20m
intervals or less as convenient, if terrain is very ragged, by placing pegs on
center, two sides and drainage lines of the road as well as following design
patterns of the cobblestone. Pegs for cobblestone roads are in most cases made Km 0.18 0.18 0.18 7,500.00 1,353.59 1,353.59 - 1,353.59
from pieces of reinforcement steel for accuracy and strength for driving them
deep into the ground. The number of pegs along the cross-section of the road
ranges from 7 to 13 depending on the pattern of the cobblestone and requirement
of side drains.
2. Earth work
Remove big stones, grass and other obstacles within width of the road reserve to
allow movement of workers for smooth surveying and setting out works. The 1,890.77 1,890.77 - 1,890.77
Ha 0.21 0.21 0.21 9,215.57
material or debris as a result of cleaning and grubbing will be deposited to the
location as directed by the engineer.
Excavate the top 20cm soil to remove the soil with grass & organic layer of the
soil which is very weak, compressible and not required for road construction. m2 2,051.71 2,051.71 2,051.71 9.16 18,791.46 18,791.46 - 18,791.46
The excavated material will be deposited at a place directed by the Engineer.
Cartaway the excavated material and deposited at a place directed by the 47,369.97 47,369.97 - 47,369.97
2.6 m3 1,231.03 1,231.03 1,231.03 38.48
Engineer. At least(4 to 5km).
3.Cobblestone Paving
Laying of fine crushed aggregate base course Supply, 10cm red ash & 5cm fine
aggregate, spread to level and compact 7cm base course, fine crushed aggregate 70,261.97 - 49,722.39 49,722.39
3.1 m2 1,618.57 1,145.41 1,145.41 43.41
from stone crusher site, keeping the design slope so as to enable cobblestone
paving following the slope.
Supply and lay to the required level 10*10*10, 9x9x9 & 8x8x8cm shaped
cobble stones made of hard rocks as per the lay out design & slope for the main 326,748.12 - 231,230.32 231,230.32
m2 1,618.57 1,145.41 1,145.41 201.88
body of the road and 17*15*15cm shaped edge cobble stone s following the
design pattern of the cobblestone road pavement
Supply, fill and compact the 10mm space or void between the cobblestone with
fine crushed aggregate to prevent the movement of the stones due to traffic and m2 1,618.57 1,145.41 1,145.41 43.41 70,261.97 - 49,722.39 49,722.39
make the pavement stiff. The surface should be cleaned after wards.
4.2
Supply and fix 20*20cm shaped Big stone, 20cm long each, along trasverse
direction of the pavement with in the interval of every 20m to make the cobble
stone pavement tough with a cement mortar base of 1:3 mix and backed with c-
15 concrete on the both side of the big stone, for support, as shown in the design ml 141.40 103.40 103.40 57.17 8,083.13 - 5,910.86 5,910.86
and fill joints with cement mortar of 1:3 mix. Additional hand tools for the
activity are measuring box (for sand and crushed aggregate),bucket, plasterer
knife,etc.
supply and fix 50*30cm shaped curvedstone side drains to drain rain water
where necessary, the curved part is 5cm deep out of 10 cm thick. the length of 1,443.82 1,443.82 121,375.06 121,375.06 - 121,375.06
ml 1,443.82 84.07
the stone pcs is 30 to 50cm and to be laid on a compacted base and c-15
concerte and joint filled with cement mortar 1:3.
5.1
Total carried to summary ,ETH BIRR 121,375.06 121,375.06 - 121,375.06
152.257
10
0.4 609.03
28.221
18.75
0.4 211.66
820.69 m3
2.5(Cartaway the excavated)
410.34 2.2
820.69 2.3
1,231.03 m3
4.Curbstone
4.1.Curbstones
2 2 152.257 609.03
2 2 28.221 112.88
721.91 ml
5.Storm Water Drains
5.1.Curved stone side drains
2 4 152.257 1,218.06
2 4 28.221 225.77
1,443.82 ml
Prepared by Chacked by
___________________ ______________________
Project:- Lama Busu Home to Jameynesh Bedada Cobble Stone Road Second
Chainage
Location :Shashemene,Alelu Kebele
Client :------------------Shashemene City Municipality
Take of sheet
T D S Description
0.1523 0.1523 1.1 Surveying
152.257
304.514 2.2
609.028 2.3
913.542 2.4
152.257
1 7.6 1157.1532 3.1 Laying of fine aggregate
152.257
7.6 1157.1532 3.2Cobblestone Paving
152.257
1 7.6 1157.1532 3.3 Filling voids
4.Curbstone
152.257 4.1.Curbstones
4 609.028
4.2.Big stone
10 1
7.6 76
Prepared by Chacked by
___________________ ______________________
Project:- Lama Busu Home to Jameynesh Bedada Cobble Stone Road Second
Chainage
Location :Shashemene,Alelu Kebele
Client :------------------Shashemene City Municipality
Take of sheet
T D S Description
0.0282 0.028221 1.1 Surveying
0.0282 0.028221 1.2 Setting out
Earth Work
28.221
18.75 529.14375 2.1.Clearing and grubbing
28.221
18.75 529.14375 2.2 Top soil excavation
28.221
18.75
0.4 211.6575 2.3. Bulk Excavation
28.221
18.75
0.4 211.6575 2.4 Back fill using subbase material
2.5(Cartaway the excavated)
105.82875 2.2
211.6575 2.3
317.48625 sum of tota 2.5
Cobble Ston Paving
28.221
1 16.35 461.41335 3.1 Laying of fine aggregate
28.221
16.35 461.41335 3.2Cobblestone Paving
28.221
1 16.35 461.41335 3.3 Filling voids
4.Curbstone
28.221 4.1.Curbstones
4 112.884
4.2.Big stone
4 1
16.35 65.4
5.Storm Water Drains
2 28.221 5.1.Curved stone side drains
4 225.768
Prepared by Chacked by
___________________ ______________________
CERTIFICATE OF PAYMENT NO-2
PROJECT
Lama Busu Home to Jameynesh Bedada Cobble Stone Road Second Chainage
PROJECT :-Lama Busu Home to Jameynesh Bedada Cobble Stone Road Second
Chainage MAIN CONTRACT 1,016,608.14
LOCATION :- Shashemene,Alelu Kebele supplementary cont.
Client :-Shashemene City Municipality VAT ( 15 %) 152,491.22
CONTRACTOR : Naima,Sadiya & their Friends Road Construction PSH TOTAL SUM 1,169,099.36
PAYMENT CERITFICATE
Date 1-As per the attached statement the value of work executed and /or
NO. Description Amount (BIRR)
materials supplied by the contractor to date before vat is 474,703.21
With VAT ………………………….
after rebate
1 Adv 233,819.87 VAT 15% 71,205.48
DEDUCTION WithVAT 545,908.69
2 Pay 1
1. Previous Payment 0.00
3 pay 2
2. Rebat (0% )
4 pay3
Total -
3. Retantion (5%) 27,295.43
4. Penality
We Certified that the contractor(SME) is entitled to the sum of Birr 409,431.52(Four Hundred NineThousand
four hundred thirtyone and 52/100 cents ) including VAT
808.06 4,359,297.46
744.33 4,263,702.46
578.95 3,949,337.53
786.45 4,260,587.53
1 5.00 2.00
2 4.00 2.00 0.03
3 5.00 3.00
4 6.00 3.00
5,394.77
5,728.24
6,821.55
5,417.49