Silpukhuri Guwahati.
Rates are Based on "DSR 2021-22 (Building)" & as per Prevailing Market Rates.
Rupees Twenty Five Lakh(s) Sixteen Thousand Seven Hundred Ninety Five Only
Name of Work : Construction of Dipak Sangha at Nabagraha Road, Silpukhuri Guwahati
Construction of Foundation, Form Work, and Casting & Filling Upto Plinth
3
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III)
derived from natural sources : 3 graded stone
5.1.2 aggregate 20 mm nominal size derived from
natural sources)
L B H Volume
9 8 0.7 50.4 cum 50.40 2161.20 108,924.48
13.4 CEMENT PLASTER (IN COARSE SAND)
L B H Area
30 - 0.7 21 Sqm 21.00 214.30 4,500.30
Finishing walls with Acrylic Smooth exterior
13.46
paint of required shade :
L B H Area
30 - 0.7 21 Sqm 21 166.85 3,503.85
Ground Floor Construction Upto 1st Floor
L B W Volume
35 mm thick shutters
9.5.1.1 L B H Area
- 1.3 2.1 2.73
For Doors of Nos 5 13.65 Sqm 13.65 3704.45 50,565.74
Two coats
13.83.2
Quantity from Statement - 15 Sqm 144.00 121.55 17,503.20
Aluminium Doors & Windows
L B H Area
***********************
LENGTH OF VERTICAL BAR CALCULATION
Calculation
Height = 5000 m
Width = 300 mm
Breadth = 400 mm
Clear Cover = 50 mm
No of Vertical Bars = 7 Nos
Dia of Vertical Bars = 16 mm
Dia of Stirrups Bars = 8 mm
Stirrups C/C Spacing at Top &
= 150 mm
Bottom
Stirrups C/C Spacing at Mid
Column
= 200 mm
Zone
Development Length Top (Ldt) =
= 656 mm
(41 x d)
Development Length Bottom
= 256 mm
(Ldb) = (16 x d)
Cover = 60 mm
Dia of Mesh Bars = 12 mm
5828 mm
= 5.83 m
For 6 Bars = 40.80 m
Weight for 1 Bar = 9.20 Kgs
So, Weight for 6 Bars = 55.19 Kgs
Footing Calculation
12.333333 Nos
Cutting Length along X = (Effective Length + Bends) - Bend Deductions
= 2252 mm
= 2.252 m
Total Length of Bars X Axis = 27.774667 m
Cutting Length along Y = 2052 mm
= 2.052 m
Total Length of Bars Y Axis = 28044 mm
= 28.044 m
= 24.65815 Kgs
Weight of Steel
24.897263 Kgs
Total Weight of Steel = 49.555413 Kgs
Add 5 % Wastage = 2.4777707 Kgs
Total Weight of Steel 52.033184 Kgs
Say = 35 Nos
Clear Span + (2 x Ld) + Inclined Length -
Cutting Length of Main Bar =
(Bend Length)
d = Slab Thickness - Clear Covers - Dia of Bar
= 138
Length of 1 Main Bar = 6027.92 mm
= 6.02792 m
Length of Total Main Bars = 168.78176 m
Weight of Total Main Bars = 149.84324 Kgs
Extra Bar
No of Extra Bars = {Ly/5/Spacing + 1 } x 2
= 12.666667 Nos
Both Side Lapping = 100
Length of Extra Bar = Lx - 2 x Lx/4 + 2 x 100
= 2700 mm
= 2.7 m
Total Length of Extra Bars = 34.2 m
Weight of Extra Bars = 13.494451 Kgs
Extra Bar
No of Extra Bars = {Ly/5/Spacing + 1 } x 2
= 18.666667 Nos
Both Side Lapping = 100
Length of Extra Bar = Lx - 2 x Lx/4 + 2 x 100
= 2600 mm
= 2.6 m
Total Length of Extra Bars = 48.533333 m
Weight of Extra Bars = 19.150021 Kgs
No. of Stirrups
Clear Span of Beam (L) = 6000 mm
Size of Beam (B) = 300 mm
Size of Beam (W) = 500 mm
Development Length = 50d
Crank Bar at Bottom = 16 mm
Clear Cover = 25 mm
Bottom Dia Bars = 25 mm x 4 Nos
Top = 12 mm x 2 Nos
Stirrups = End Sections 8 mm
= Mid Sections 8 mm
Spacing at End = 150 mm
Spacing at Mid = 200 mm
Cutting Length of 1 - Top Bar = Clear Span of Beam + Ld (Both Sides) - Clear Cover on Both
Sides
= 7150 mm
For Total of Top = 2 Nos Bars
= 14300
= 14.3 m
Weight of Top Bars = 12.711111 Kgs.
Cutting Length of Bottom Bar = Clear Span of Beam + Ld (Both Sides) - Clear Cover on Both
Sides
= 8450 mm
For Total of Bottom = 4 Nos Bars
= 33800 mm
= 33.8 m
Weight of Top Bars = 130.40123 Kgs.
As it has Zones (L/3) = 3 Zones
= 2000 mm
Stirrups for Zone - I = Span/Spacing+1
= 14.333333 Nos
Say = 14 Nos
For Zone - II = 9 Nos
For Zone - III = 14 Nos
Total No of Stirrups = 37 Nos
Statement - 1
L B H Vol Unit
2 1.5 0.3 0.90
P.C.C in Column & Beam for For 15 Nos 13.50
3
Foundation
=
L B H Vol Cum
70 - 0.15 10.50
Total Quantity = 24.00
Statement - 2 (For Columns & Beam Only at Foundation Level)
L B H Area Unit
Shuttering in Column & Beam at 8 - 2.3 18.40
5
Foundation Level
=
70 - 0.45 31.50 Sqm
Total Quantity 49.90
Statement - 3 (For Columns & Beam Only at Foundation Level)
L B H Vol Unit
0.45 0.35 3 0.47
RCC Casting for Column & Beam
6
at Foundation Level
= L B H Vol
Cum
36 0.35 0.45 5.67
Total Quantity 6.14
Statement - 4 (Only at Foundation Level)
L B H Vol Unit
Brick Work at Foundation Level
7
Upto Plinth
= 75 0.098 3 22.0500
Cum
Total Quantity 22.05
Statement - 5
(All Works are From Plinth Level)
L B H Vol Unit
PCC in Plinth Beam at 1st Floor to
9
3rd Floor.
= 30 0.10 0.15 0.44
Cum
Total Quantity 0.44
Statement - 6
L B H Area Unit
Form Work in Plinth Beam & 8 - 5 40.00
10
Column at 1st Floor to 3rd Floor
=
68 0.45 30.60 Sqm
Total Quantity 70.60
Statement - 6 (A)
L B H Area Unit
Form Work in Slab 1st Floor to 3rd 25 - 225.00
10
Floor
= 9
Sqm
Total Quantity 225.00
Statement - 7
L B H Vol Unit
0.45 0.35 5 0.79
RCC in Beam & All Columns
11 Above Plinth Level at = For 15 Nos 11.81
1st Floor to 3rd Floor. Cum
RCC in Beam & All Columns
11 Above Plinth Level at =
1st Floor to 3rd Floor. Cum
68 0.35 0.45 10.71
Total Quantity 22.52
Statement - 7 (A)
L B H Vol Unit
RCC in Slab at
11 (A)
1st Floor to 3rd Floor.
= 16 9 0.01 1.44
Cum
Total Quantity 1.44
Statement - 8
L B H Area Unit
Brick Works at 1st Floor to 3rd
12
Floor
= 96 - 5 480.00
Sqm
Total Quantity 480.00
Statement - 9
L B H Area Unit
Cement plaster Skirting at 1st Floor
13
to 3rd Floor
= 48 - 0.1 4.80
Sqm
Total 4.80
Statement - 10
L B H Area Unit
Brick on edge flooring at 1st Floor
14
to 3rd Floor
= 8 16 - 128.00
Sqm
Total Quantity 128.00
Statement - 11
L B H Area Unit
Damp-Proof Course at 1st Floor to
15
3rd Floor
= 8 16 - 128.00
Sqm
Total Quantity 128.00
Statement - 12
L B H Area Unit
Cement Plaster at 1st Floor to 3rd
16
Floor
= 96 - 3 288.00
Sqm
Total Quantity 288.00
Statement - 13
L B H Area Unit
Ceramic glazed floor tiles at 1st
18
Floor to 3rd Floor
= 8 16 - 128.00
Sqm
Total Quantity 128.00
Statement - 14
L B H Area Unit
Plaster of Paris at 1st Floor to 3rd
19
Floor
= 48 - 5 240.00
Sqm
Total Quantity 240.00
Statement - 15
L B H Area Unit
Finishing walls with Acrylic Smooth
22 Wall painting with premium acrylicat = 48 - 3 144.00
1st Floor to 3rd Floor Sqm
Total Quantity 144.00