TAKE OFF SHEET

No dimension
A. SUB STRUCTURE

1. EXCAVATION & EARTH WORKS


1 600
7

1 60
1
1
1 60.00
0.6
1
1 600.00
6.00
150.00
1 6.00
0.07

1 150.00
6.00

150.00
1 6.00
0.04

150.00
1 6.00
0.04
150.00
1 2

6.00
1 30
Length 600
Project
location
timising Descri
4200.00 M 2

60.00m3
36m3
3600.00m2
63.00m3

)
900.00m2
36.00m3

Fine Aggregate
36.00m3
360.00
360.00M

180
180.00M
540.00M
m
COBBLESTONE
BARODA TOWN
Description

1. Laying of Fine Crushed Aggregate


1.1 /Site Clearance
1,2. Excavation trench of side work
masonary for cobble stone project
1,2. Excavation trench of side work
masonary for cobble stone project

1.3. Cartaway excass soil ma


1.4. Road surface compact by hand com

2/ Supply and spread red ash or dire daw


of 5 to 7 cm base
2/ Supply and spread red ash or dire daw
of 5 to 7 cm base

3/Supply Cobbelstone and Stone made


4/ Cobblestone Paving of aggregat
5/ Filling Voids by Crushed
ggregate and Finishing
6/ Curb stone
Total length of curbstone
gate
k
t
k
t

oil material
nd compactor

re dawa sand to level


re dawa sand to level

made of basaltic black hard.


regate size for o1.
SPECIFICATION & BILL OF

QUANTITIES

COBBLE STONE

FOR

BARODA TOWN

AT

Regin-Oromia

Zone-East Hararge

Wereda-Goro-Gutu

JULLY ,2023
Item No
PROJECT :COBBLESTONE
LOCATION :BARODA TOWN

Description Unit QTY Rate Total


1 EARTH WORK
1.1 Clear the Site to remove all un wanted gravel and soil material from
both side of road. M2 4200.00 33.69 141,498.00
1.2 Cartaway
Trench excavation depth not material
surplus excavated exceedingas 1.5m
pertheininstruction
ordinary soil
of the M3 60.00 317.83 19,069.80
1.3 engineer m3 36.00 44.73 1,610.28
1.4 Road surface shall be compacted by hand campactor m2 3600.00 70.00 252,000.00
Total Carried to Summary 414,178.08
2 Red ash or dire dawa sand
Supply and spread red ash or dire dawa sand to level of 5 to 7 cm base
and surface shall be well compactecd,then base course of fine crashed
aggregate size from stone crusher site , keeping the design slope so as
to enable cobblestone paving following the slope. m2 63.00 1,700.00 107,100.00
Total Carried to Summary 107,100.00
3 Cobble stone paving

Spread aggregate size 01 used to the required level of keeping design


10x10x10 cm shaped cobble stone made of basaltic black hard rock
thickness as per the layout, design & slope for the main body of the road
and 15x10x10 cm shaped stones road pavement and price include
loading cost m2 900.00 406.11 365,499.00
Total Carried to Summary 365,499.00
Cobblestone Paving
Spread aggregate size 01 used to the required level of keeping design
10x10x10 cm shaped cobble stone made of basaltic black hard rock
thickness as per the layout, design & slope for the main body of the road
and 15x10x10 cm shaped stones road pavement and price include
loading cos m3 36.00 1,250.00 45,000.00
Total Carried to Summary 45,000.00
4 Filling Voids by Crushed Fine Aggregate and Finishing
Supply,fill and compact fine crushed aggregate of size 00 to the 2cm
spaces or voids between the cobblestones to prevent the movement of
the stones due to traffic and make fixed M3 36.00 1,100.00 39,600.00
Total Carried to Summary 39,600.00
5 Curb stone

transport and fix 15x25 cm shaped curb stones, 30 to 70 cm long,at


every 15m interval across the walkway pavement and sidewalk, along
both sides of the road with a cement mortar base of 1:4 mix and backed
with C-15 concrete on the external sides of the road and crushed
aggregate)bucket, plasterer knife, and price include loading cost, ml 540.00 812.30 438,642.00
Total Carried to Summary 438,642.00
SubTotal 1,410,019.08
15% VAT 0.15 211,502.86
Grand Total With Vat 15% 1,621,521.94