Item Unit EXCUTY
Description Of Item Unit Quantity Excuty
Rate(Birr) Total(Birr) ContractTotal(Birr)
No.
1.Excavation and Earth work
Clear the Site to remove the top Soil depth of 20cm from natural ground M2 48.0 0.0 10.20 0.00 489.60
1.1 level
Trench Excavation to removing of ordenary soft soil up to adepth of
2m along canal including cutting &leveling the ground by spreading M3 19.2 0.0 198.56 0.000 3,812.35
1.2 & filling up to the required height.
Back fill around stone masonary and to the retaining side of
masonry wall with selected fill material well in every 20 cm thick M3 32.0 0.0 57.33 0.00 1,834.56
1.4 leyer rolled compacted.
M3 24.0 0.0 56.58 0.00 1,357.92
1.5 Cart away excavated material as per the instruction of the Engineer
Sub Total…………………….. - 7,494.43
2.Masonry work
Construct a rectangular type storm water canal from hard
basalticblack stone with a top and bottom clear span width of
1.2m ,1m - respectively and depth 1.2m and joining price includes M3 33.6 0 2,213.12 0.00 74,360.83
pointing of the surface and providing with cement morter 1:3 the
2.1 aproper slope for the base.
Sub Total…………………………. - 74,360.83
`` Description
1. EXCAVATION & EARTH WORKS
1.1/ Clear of the Site & Bulk
excavation
1
0.00
0.00 M2 TOTAL
0.00 M2 TOTAL
1.2/ Trench excavation
0
0 M3 TOTAL
0.00 M3 TOTAL
1 1.3/ Back fill
0
0 M3 TOTAL
0.00 M 3
TOTAL
1.4/ Cart Away Excav.Materials
0.00 M2 TOTAL
TAKE OFF SHEET No - 1st-paymnt
piroject COBBLE STONE ROAD Lot-8
LOCATION - awaday
CONTRACTOR - Obsinet konistrakshin
NO LXWXD Description
A. EXCAVATION & EARTH WORKS
1.01 Site Clearing an Av. D=20cm
175.00
8.00 1,400.00
1,400.00 M2 TOTAL
1.04 Bulk
175.00
8.00
0.15
210 M3 TOTAL
1.04 Back fill
175.00
8.00
0.15
210.00 M3 TOTAL
8.00 1.03 Cart Away Excavated Materials
8.23
0.15 C=0.1xSC
9.87 M3 TOTAL
B. Cobblestone Work
88.00 2.1. Laying of Fine Crushed Aggregate Base
Course
8.00
704.00 M3
704.00 M3 TOTAL
2.2. Cobblestone Paving
88.00
8.00
704.00 M2
704.00 M2 TOTAL
88.00
2.3.Filling Void by crushed fine Aggregate and
Finishing
8.00
704.00 M2 TOTAL
150.00
2.4.Curbstone
1.00
150.00 M2 TOTAL
PROJECT:- coobble stone Lot-8
CONTRACTOR:- Obsineet konistrakshin 1nd Boq-
CLIENT:- Bulchinsa Magaalaa Awwadaay
Awwaday
ilaala
Nagayaa Wajjiin
Lakk______________
Guyyaa____________
Awwaday
Nagayaa Wajjiin
PAYMENT CERTIFICATE SUMMARY SHEET
We certify that the contractor is know entitled to the sum of birr 246349.60 ( two hundred fouty six thousand and thiree
hundred fouty nine birr & 60/100 ) Birr only
Certified by Approved by
Name:___________________ Name:_____________
Sign:____________________ Sign:_____________
BILL AND SPECIFICATION OF QUANTITY
AWADAY TOWN ADMINISTRATION UIF PROJECT
COOBBIL STÔNE WORK
GANDA KARAA IMAR
Price Summary
A. EXCAVATION AND EARTH WORK Qu Amount Ex Amount
Birr……. 156,566.90 39,453.84
sub Total A Birr……. 156,567 39,454
B.Cobble stone Work
1.Laying of fine crushed Agregate base course Birr……. 131355 44,035.20
2.Cobblestone paving Birr……. 461958 154,865.92
3.filling voids by crushed fine Birr……. 70749 23,717.76
4.curb stone Birr……. 62800 23,550.00
sub Total B Birr……. 726,862 246,169
SUM Total A+B Birr……. 883,429 285,623 -
C. RETAINING WALL
1.Excavation and Earth Work………… Birr……. 7,494.43 -
2.Masonry Work…………………………….. Birr……. 74,360.83 -
3.FINISHING & PLASTERING…………………………….. Birr……. 8,430 -
Sub Total C Birr……. 90,286 - -
SUM Total A+B+c Birr……. 973,715 285,623 -