You are on page 1of 1

Re -Excavation, Renovation and Development of khals for Mitigating Water Logging Problems in Chittagong City , CDA Project, Chittagong.

Cross Section For Sand Filling At Tulatoli Silt Trap Below Base
0.550
R/B

3.500
3.400

0.500
0.500
75 mm th CC (With Stone Chips) 75 mm th CC (With Stone Chips)
300 mm Sand Filling (FM 1.5) 300 mm Sand Filling (FM 1.5)
2.100
CHAINAGE=(0+580) to (0+595)=21.500m (Transition Zone)

You might also like