Professional Documents
Culture Documents
Below Base 2
Below Base 2
Cross Section For Sand Filling At Tulatoli Silt Trap Below Base
0.550
R/B
3.500
3.400
0.500
0.500
75 mm th CC (With Stone Chips) 75 mm th CC (With Stone Chips)
300 mm Sand Filling (FM 1.5) 300 mm Sand Filling (FM 1.5)
2.100
CHAINAGE=(0+580) to (0+595)=21.500m (Transition Zone)