CITY POWER PRICING SCHEDULE FOR LABOUR CONTRACTS

Estimated Unit Of
Item Description Unit Rate
QTY Measure
3
1 Soil dig, backfill ,comp hand pickable 500 M R148,42
3
2 Soil machine excavate dig, backfill, complete 500 M R171,00
3
3 Lose rocks/boulders soil, dig, backfill ,complete 500 M R201,67
3
4 Lose rocks/boulders, soil, machine, backfill ,complete 500 M R271,04
3
5 Rock wedge & power drill 500 M R483,99
3
6 Pole hole removal of rock 500 M R375,90
3
7 Rock requiring blasting 500 M R416,23
8 Tar paving cut,& remove 500 M² R321,05
9 Concrete 100mm thick cut & remove 500 M² R209,73
10 Interlock blocks lift & stack (retaining) 500 M² R103,25
11 Lifting & stacking of paving bricks 500 M² R87,11
12 Concrete slabs lifting & stacking 500 M² R138,74
13 Lift & stack preservation of lawn grass 500 M² R108,09
14 Reinstate used inter lock blocks 500 M² R172,62
15 Reinstate install new inter lock blocks 500 M² R277,49
16 Reinstate used concrete slabs 500 M² R174,24
17 Reinstate new concrete slabs 500 M² R243,61
18 Reinstate used paving bricks 500 M² R140,36
19 Reinstate paving bricks 500 M² R258,13
20 Backfill trench & compact only 500 M² R100,02
21 Supply dry clean river sand 500 M3 R264,58
22 Supply acceptable filling soil 500 M3 R209,73
23 Reinstate lawn 500 M² R77,44
24 Supply and install new lawn 500 M² R86,32
25 Reinstate and supply new tar 500 M² R703,40
26 Handling and supply ready mix concrete 500 M3 R338,79
27 Reinstate concrete (excld trench Crete) 500 M² R1 447,14
28 Trench on concrete road 500 M3 R187,14
29 Disposal of rock from excavations 500 M3 R290,39
30 Rock, rubble and spoil removal & disposal 500 M3 R779,23
31 Create temporary walkway over trench 500 EA R2 040,83
32 Sign boards JRA cop for (projects only) 500 EA R1 219,66
33 Obtain way leave information 500 EA R993,80
34 Install Danger barriers for trenches 500 M R1 384,22
35 Shoring of trench walls (for 1,5m plus only) 500 M3 R664,68
36 Pumping out flooded trench 500 LITRE R725,99
37 Location of services with the use of appropriate locator 500 M R1 660,09
39 LV cable fault location 500 EA R1 660,09
40 MV Cable fault location 500 EA R1 660,09
41 Traffic deviation (where applicable) 500 EA R72,60
42 Laying of 1000mm2 single core MV cable 500 M R88,73
43 Laying of 630mm2 single core MV cable 500 M R74,21
44 Laying of 300mm x3 MV 3 core cable 500 M R59,69
45 Laying of 185mm x3 MV 3 core cable 500 M R45,17
46 Laying of 95mm x3 MV 3 core cable 500 M R25,81
47 Laying of 20 pair control cable 500 M R51,63
48 Laying of LV 4 core cable 70 to240mm2 500 M R40,49
49 Laying of LV 4 core cable 25 to 50mm2 500 M R35,49
50 Install cable in tunnels 300mm2 3 core 500 M R179,07
51 Install cable in tunnels 185mm2 3 core 500 M R135,51
52 Install cable in tunnels 630mm2 1 core 500 M R667,89
53 Install cable in tunnels 1000mm2 1 core 500 M R734,68
54 Install cable in tunnels hard drawn bare copper 500 M R179,07
55 Laying of LV cable 16mm2 500 M R35,49
56 Laying plastic marker tape 500 M R3,23
57 Installation of sleeves 110 mm 500 M R26,37
58 Installation of sleeves 160mm 500 M R36,37
59 Supply and install 110mm steel pipe 500 M R93,08
60 Drawn cable = >95 mm2 through pipe 500 M R40,33
61 Drawn cable < 95 mm2 through pipe 500 M R30,65
62 Drawn LV pilot cable<35 mm2 through pipe 500 M R24,20
63 MV Joint for 300mm2 x 3 core cable 500 EA R1 492,31
64 MV Joint for 185mm2 x 3 core cable 500 EA R1 306,78
65 MV Joint for 95mm2 x 3 core cable 500 EA R1 148,67
66 LV Joint for 300mm2 x 4 core cable 500 EA R980,09
67 LV Joint for 70 to 185mm2 x4 core cable 500 EA R1 072,85
68 LV Joint for 25mm2 & 35mm2 x4 core cable 500 EA R980,09
69 LV Joint for 16mm2 >=2 core or more cable 500 EA R980,09
70 MV make-off & termination >= 300mm2 x 3 core 500 EA R1 247,09
71 MV make-off & termination >= 185mm2 x 3 core 500 EA R1 053,49
72 MV make-off & termination >= 95mm2 x 3 core 500 EA R822,79
73 LV make-off & termination 300mm2 4 Core 500 EA R634,02
74 LV make-off & termination 70mm2 to 185mm2 x 4 core 500 EA R611,44
75 LV make-off & termination >= 25mm2 & 35mm2 x 4 core 500 EA R387,19
76 LV make-off & termination 16 mm2 >= 2 core 500 EA R387,00
77 Seal LV/MV cable ends 500 EA R119,38
78 Earth MVC & MSS install earths including excavation 500 EA R1 692,36
79 Install earth spike & connect including CAD welding 500 EA R374,29
80 Supply & install earth spike 500 EA R240,38
81 Repair earth mats 500 EA R372,67
82 Positioning of MSS (excluding cable & MV switchgear) 500 EA R2 568,38
83 Install pole mounted distributor transformer 500 EA R2 065,03
85 Position MV transformers 500 EA R1 145,45
86 Position MV switchgear RMU 500 EA R1 084,14
87 Install/Position MV meter cubicle 500 EA R8 756,02
88 Installation of MV VCB + meter cubicle (BMK) 500 EA R1 198,69
89 Install MV VCB cubicle units 500 EA R950,24
90 Cement top ducts Supply, installl WxL 500 M2 R342,02
91 Sign write complete MV sub 500 EA R408,17
92 Install designation labels’ (RMU & mini-subs) 500 EA R172,62
93 Disconnect, reconnect & test LV Termination (excluding LV tape) 500 EA R206,50
94 Disconnect, reconnect & test excluding MV taped termination 500 EA R292,01
95 Install chamber light wiring 500 EA R530,78
96 Installation of test block and fuses 500 EA R308,14
97 Connect test block and fuses 500 EA R269,42
98 500 v megger test between cores and core 500 EA R166,17
99 Earth line loop impedance test per circuit 500 EA R122,61
100 Fit main Circuit Breaker to MSS or LV distribution board 500 EA R535,62
101 Fit add main isolator to LV distribution Board 500 EA R461,41
102 Install LV distribution board 500 EA R843,76
103 Install LV Distribution Board fuse 500 EA R666,30
104 Install LV LPU Meter Board 500 EA R603,99
105 Fit additional fuse way 500 EA R361,38
106 Replace LV fuse & carriage in load centre 500 EA R166,17
107 Install LV fuse & carriage in load centre 500 EA R166,17
108 Replace LV fuse & carriage pole mounted 500 EA R166,17
109 Install LV fuse & carriage pole mounted 500 EA R166,17
110 Replace street light fuse & carriage 500 EA R166,17
111 Install street light fuse & carriage 500 EA R166,17
112 Install LV Pillar Box ( Fibre) & Base 500 EA R648,55
113 Install LV Distribution Board (steel) & plinth 500 EA R666,30
114 Installation & connection Main Circuit Breaker in Distribution Board 500 EA R377,51
115 Install main circuit breaker in a load centre 500 EA R377,51
116 Install low voltage 1 phase circuit breaker 500 EA R208,12
117 Install low voltage 3 phase circuit breaker 500 EA R264,58
118 Replace existing low voltage 1 phase circuit breaker 500 EA R208,12
119 Replace existing low voltage 3 phase circuit breaker 500 EA R264,58
124 Redundancy cable out open trench, remove 500 EA R37,11
125 Decommission redundant Bare OHL conductor & removal & offload 500 EA R35,49
126 Decommission redundant pole remove, load and transfer 500 M R450,11
127 Decommission redundant MV switchgear, remove, load and transfer 500 M R2 639,37
128 Decommission redundant MSS, remove, load and transfer 500 EA R4 768,93
129 Decommission redundant transformer, remove, load, transfer 500 EA R3 365,36
130 Decommission redundant pole transformer remove, load and transfer 500 EA R2 797,47
131 Emergency Call Out 500 EA R850,24
132 Cleaning vegetation & rubble in TSS Servitutes 500 EA R45,17
133 Cleaning of tunnels 500 EA R93,57
134 First line inspection of load centres 500 M² R227,48
135 Maintaining Load centre Transformer ( Including O 500 M² R6 036,48
136 Maintaining Load centre MV Switchgear 500 EA R6 167,53
137 Maintaining Load centre LV Switch gear ( Including K 500 EA R3 850,22
138 Maintaining Load centre S/l control pa 500 EA R1 479,41
139 Prime cost sum for community liaison off 500 EA R40 979,57
140 Prime cost sum for special materials 500 EA R83 327,23
141 Establishment of site camp 500 EA R21 407,06
142 Transporting of 8/10.5 fibre glass poles 500 EA R224,25
143 Transport steel/wood 5/7.2/9.2/11.5m st 500 EA R212,96
144 Transport steel double arm curved spig 500 EA R279,10
145 Transport steel 17m straight pole 500 EA R440,43
149 Install 11.5 D-Curved pole, lmr & Lamp 500 EA R592,08
150 Install 11.5m Curved pole, lmr & Lamp 500 EA R563,04
151 Install 9.2m Curved pole, lmr & Lamp 500 EA R550,14
152 Installation of 17m stl pole, lmr & Lamp 500 EA R1 080,91
153 Install 11.5m stl pole, lmr & Lamp 500 EA R700,17
154 Install 7.2/9.2m stl pole, lmr & Lamp 500 EA R508,19
155 Install 8/10.5m grp pole, lmr & Lamp 500 EA R429,14
159 Plant concrete 11 & 7 m pole structor 500 EA R688,88
160 plant 8/10.5 metre grp pole. 500 EA R429,14
161 Install 7.2/9 m steel pole including insulation 500 EA R458,18
162 Install 11.5m steel pole including insulation 500 EA R464,63
163 Poles with more than one lintel 500 EA R435,59
164 Poles with one lintel 500 EA R279,10
165 Single strain fittings (120/95/50/25) 500 EA R140,36
166 Double strain fitting for (120/95/50/25) 500 EA R154,88
167 Single suspension fitting_(120/95/50) 500 EA R137,13
168 T-off strain fitting for (120/95/50/25) 500 EA R148,42
169 Install ABC single strain fitting (120-50) 500 EA R140,36
170 Install ABC single suspension fitting (120-50) 500 EA R138,74
171 Install ABC double strain fitting (120-50) 500 EA R151,65
172 Install ABC t-off strain fitting (120-50) 500 EA R148,42
173 Install IP clamp for tap-off one bolt 500 EA R90,35
174 Install IP clamp for tap-off two bolt 500 EA R135,35
175 Joint ABC 120 mm2 x 3 + n + e + s/l 500 EA R353,31
176 Joint ABC 95 mm2 x 3 + n/e + s/l 500 EA R300,00
177 Joint ABC 70 mm2 x 3 + n/e + s/l 500 EA R271,04
178 Joint ABC 50 mm2 x 3 + n/e + s/l 500 EA R251,68
179 Joint ABC 25 mm2 x 3 (s/l) 500 EA R211,34
180 Joint ABC 10 mm2 split concentric LV cable 500 EA R140,36
181 Terminate ABC 120 mm2 x 3 + n + e + s/l 500 EA R454,95
182 Terminate ABC 95 mm2 x 3 + n/e + s/l 500 EA R356,54
183 Terminate ABC 70 mm2 x 3 + n/e + s/l 500 EA R335,57
184 Terminate ABC 50 mm2 x 3 + n/e + s/l 500 EA R308,14
185 Terminate ABC 25 mm2 x 3 (s/l) 500 EA R238,77
186 Inspection of LV overhead lines (per span) 500 EA R16,13
187 Inspection of MV overhead lines (per span) 500 EA R16,13
188 Retentioning of LV conductor ( per span) 500 EA R333,95
189 Retentioning of MV conductor ( per span) 500 EA R246,77
190 Splicing & retention snapped conductor 500 EA R425,91
191 Bandit strap all cables to pole (1 m int 500 EA R67,76
192 Dressing a double shackle pole including assembly 500 EA R333,95
193 Install of any outreach bracket 500 EA R150,04
194 Installation of LV stay assembly 500 EA R288,78
195 Installation of MV stay assembly 500 EA R285,56
196 Installation of flying stay assembly 500 EA R319,43
197 Install fly-stay-Pole including accessories 500 EA R295,23
198 Install & fix inter-pole including all accessories 500 EA R321,05
199 Install & fix Double Shackle pole including assembly 500 EA R358,15
200 Install & fix Terminal-pole including accessories 500 EA R316,21
201 Pole-mounted Distribution Box 1 & 3 phase boxes 500 EA R692,11
202 Repair earth guards 500 EA R250,06
203 Replace earth guards 500 EA R333,95
204 Replace earth mats 500 EA R333,95
205 Replace MV and LV insulators 500 EA R250,06
206 Replace & install of X arm including insulation 500 EA R250,06
207 Replace surge arrestors 500 EA R375,90
208 Tree cutting under emergency 500 EA R506,58
209 Install, Commissioning street light SDB/SPB on pole 500 EA R871,18
210 Install pole-extension- 2,3m (Motor way) 500 EA R1 076,07
211 Installation of lamps only (street lights) 500 EA R98,41
212 Cleaning of Luminaire bowls 500 EA R70,99
213 Install fitting & lamp (Different sizes) 500 EA R216,18
214 Install stl lmr & 100mm-brack including Lamp 500 EA R295,23
215 Remove and replace any size luminaire in 500 EA R251,68
216 Install & wire Photo cell 500 EA R233,93
217 Replace photo-electrical cell 500 EA R135,52
218 Install Streetlight Control circuit in L 500 EA R676,18
219 Remove and install a timer 500 EA R193,60
220 Remove and install a ripple relay 500 EA R193,60
221 Replace pole cover only 500 EA R114,54
222 Straightening of skew poles 500 EA R216,18
223 Install or replace street light bracket 500 EA R8,00
224 Removal of welded covers 500 EA R196,82
225 Welding of pole covers 500 EA R196,82
226 Wire any pole size 500 EA R217,80
227 Numbering of all poles 500 EA R87,12
228 Numbering of Transmission towers 500 EA R87,12
229 Painting of Transmission towers 500 EA R2 560,20
230 Painting of all poles ( Any Length) 500 EA R256,02
231 Sleeving and painting of poles 500 EA R181,92
232 Install pole earths ,including all excavation works 500 EA R856,67
233 Install stainless steel wire rope 500 EA R1 063,17
234 Install +C315 trailing cable for High Masts 500 EA R792,13
235 Install 4-way term block & photo cell 500 EA R180,69
236 Install a by-pass switch for photo cell 500 EA R190,37
237 Replace exist door with vandal proof 500 EA R611,44
238 Disconnect and lower High Mast pole 500 EA R3 662,20
239 Replace-photo cell 500 EA R372,67
240 Inspection and complete report of High Masts (checklist) 500 EA R642,10
241 Install earth leakage isolator high mast Distribution Board 500 EA R398,49
242 Lowering and raising of sectional poles (Scissor mast) 500 EA R2 268,31
243 Lowering and raising a luminaries (high mast) 500 EA R1 005,09
244 Painting damaged galvanizing high mast 500 EA R217,80
245 Lowering and raising a repaired high mast 500 EA R3 500,87
246 Replacing a faulty time switch 500 EA R275,88
248 Replace 1,5mm² x 3 core silicone insulation 500 EA R240,38
250 Replace 2,5mm² x 5 core trailing cable 500 EA R556,59
251 Replace 30 amp triple pole circuit 500 EA R298,46
252 Replace 5 pin male plug top on trailing Cable 500 EA R417,85
253 Replace 5 pin female socket outlet in mast 500 EA R300,07
254 Supply & replace 5 pin male plug top on trailing Cable 500 EA R220,00
255 Supply & replace 5 pin female socket outlet in mast 500 EA R220,00
256 Replace 60 amp fuse base, cart and fuse 500 EA R166,17
257 Replace cable separator 500 EA R387,19
258 Replace complete Distribution Board inside mast 500 EA R1 248,70
260 Replace compression glands for above 500 EA R96,80
261 Replace faulty contactor 500 EA R209,73
262 Replace fiberglass hood/canopy (luminaire) 500 EA R453,34
263 Replace luminaires cable splitter box 500 EA R366,22
264 Replace neutral bar on High mast Distribution Board 500 EA R145,20
265 Replace 400 watt lamp 500 EA R167,78
266 Replace pole cover 500 EA R219,41
267 Replace pulley for trailing cable (High mast) 500 EA R732,44
268 Replace pulley & housing 4 steel wire rope (High mast) 500 EA R622,74
269 Replace steel wire ropes complete with accessories 500 EA R972,82
270 Reset any size circuit breaker 500 EA R119,38
271 Replace and reset single pole circuit 500 EA R271,04
272 Replace and reset triple pole circuit 500 EA R285,56
275 Replace street light bracket complete - all sizes 500 EA R172,62
276 Install street lighting luminaries-all sizes 500 EA R185,53
277 Replace street lighting luminaires - all sizes 500 EA R185,53
278 Supply and install complete Distribution Board 500 EA R2 400,60
279 Supply and mount stubby 500 EA R1 832,72
280 Touch up paint (per container) 500 EA R233,93
281 Collection of material from stores 500 EA R1 190,62
282 Compaction certificate (public roads ) 500 EA R1 155,13
283 Provision of security per 12hr shift 500 EA R325,69
284 Decommissioning of meters 500 EA R809,88
285 Decommissioning of supply 500 EA R413,01
286 Commissioning of supply 500 EA R532,39
287 Transport cable and large equipment 500 EA R1 879,50
288 Prep of As-built drawings electronically 500 EA R2 173,12
289 Preparation of hand over documents 500 EA R2 365,11
290 Inspect/remove and replace 5 amp 1 phase meter 500 EA R180,69
291 Inspect/remove & replace polyphase meter 500 EA R516,26
292 Second visit to check for tampering 500 EA R245,22
293 Hand prescribed notice for irregularity 500 EA R143,58
294 Issue Engineer's certificate of completion 500 EA R2 169,90
295 Contractor to attend court/hearings (witness) 500 EA R1 721,40
296 Install hasp & staple 500 EA R350,09
297 Make off and connect 2.5mm2 x 19 core pilot 500 EA R411,39
298 Install including saddles 2.5mm² x19 core 500 EA R82,28
299 Reprogram electronic meter 500 EA R232,32
300 Provide download from electronic meter 500 EA R250,06
301 Audit prepaid/postpaid meters 500 EA R146,81
302 Remove tamper/bridge meter 500 EA R235,54
303 Revisit/no access/can't locate 500 EA R227,48
304 Install precast plinths for Pillar box including prepare ground works 500 EA R1 485,85
305 Install Pillar Box (Complete) 500 EA R1 303,55
306 Pillar Box Repair 500 EA R942,17
307 Painting of substations/Load Centre (brick sub) 500 EA R30,00
308 Painting of load centre (Minisub) 500 EA R655,00
309 Painting of pillar box 500 EA R200,00
310 Labelling of Load Centre including pillar boxes 500 EA R609,83
311 Security bars over louvers and windows 500 M² R2 200,55
312 Repair & Paint Substation Roof & Ceiling 500 EA R330,73
313 Install of 2 m high palisade Fencing 500 EA R2 044,06
314 Building work 500 EA R527,55
315 Concrete work 500 M² R701,79
316 Repair of Perimeter Fencing and walling 500 M² R1 705,26
317 Painting Perimeter Fencing and walling 500 M R212,96
318 Repair Mss/Tss/Load centre door & hinges 500 M² R571,11
319 Replace Mss/Tss/Load centre door & hinge 500 M² R1 347,11
320 Repair substation doors & hinges 500 M R1 100,00
321 Replace substation doors & hinges 500 M R1 200,00
322 Replace hinges (all types) 500 EA R250,00
323 Install 8mm checker plate (Cover) trench in subtn 500 EA R674,36
324 Supply and Install Anti Theft Mss brackets 500 EA R329,11
325 Removal of illegal connection 500 EA R631,83
326 Clean substation & chamber (inside) 500 EA R1 985,98
327 Reinstate pole mounted pillar box doors 500 M² R1 602,01
328 LPU site inspection and certificate installation 500 EA R951,85
329 Install AMR meter & commission 500 EA R976,64
330 Install MV CT & VT on switchgear in substation 500 M² R935,72
331 Install and commission a modem 500 EA R725,99
332 install an external antennae 500 EA R838,92
333 Standby - Special Events(per occasion) 500 EA R4 146,20
334 Laying of 4 core x 2.5mm CU PVC SWA PVC 600 500 EA R25,81
335 Laying of 4 core x 4mm CU PVC SWA PVC 600 500 EA R30,65
336 Laying of 12 core x 2.5mm CU PVC SWA PVC 600 500 EA R32,27
337 Laying of 12 core x 4mm CU PVC SWA PVC 600 500 EA R35,49
338 Pre-paid /Post-paid meter Single Phase (Install ) 500 M R645,32
339 Pre-paid/ Post-paid meter Three Phase (Install ) 500 M R967,98
340 Install AMR Meter Modem 500 M R403,33
341 Install Metering Protective Enclosure 6 / 9 way ground mounted 500 EA R3 576,44
342 Install Metering Protective Enclosure 12 way ground mounted 500 EA R3 934,08
343 Install Metering Protective Enclosure 9 way pole mounted 500 EA R2 365,27
344 Install Locks 500 EA R40,33
345 Install a 40mm sleeve 500 EA R48,40
346 Install a 24SM HDD in fibre core sleeve 500 EA R32,27
347 Installation of 48SM HDD fibre core in a sleeve 500 EA R32,27
348 Fusion splicing per fibre core 500 EA R193,60
349 Term. of 24 fibre in p/panel including splicing 500 EA R5 420,71
350 Term. of 48 fibre in p/panel including splicing 500 M R10 067,03
351 Optical testing with light source and po 500 M R16,13
352 OTDR testing including traces in hard an 500 M R3 252,42
353 Installation of AMR meters 500 EA R976,64
354 Installation of modems 500 EA R619,00
355 Installation of sim cards 500 EA R687,78
356 Second visit to customer to install prepaid meter 500 EA R683,65
357 Stringing of AIRDAC 10mm & 16mm 500 EA R34,39
358 String. ABC (new) of 16 to 25mm 2/3 core (per span) 500 EA R34,39
359 String ABC (new) of 35mm2 (4/5 core) (per span) 500 EA R45,02
360 String ABC (new) of 50mm² (4/5 core) (per span) 500 EA R77,39
361 String ABC (new) of 95mm² (4/5 core) (per span) 500 EA R100,42
362 String ABC (new) of 120mm² (4/5 core+SL) (per span) 500 M R110,04
363 Retentioning of ABC of 35mm²(4 core) (per span) 500 EA R7,36
364 Retentioning of ABC of 50mm² (4 core) (per span) 500 EA R8,21
365 Retentioning of ABC of 35mm²(4 core plu (per span) 500 EA R11,91
366 Retentioning of ABC of 50mm²(4 core plu (per span) 500 EA R15,79
367 Retentioning of ABC of 95mm²(4 core plu (per span) 500 EA R30,91
368 Retentioning of ABC of 120mm²(4 core pl (per span) 500 EA R35,10
369 Removal of ABC 35mm² (per span) 500 EA R8,01
370 Removal of ABC 50mm² (per span) 500 EA R9,73
371 Removal of ABC 95mm² (per span) 500 EA R15,11
372 Removal of ABC 120mm² (per span) 500 EA R19,92
373 Retentioning of Fox per conductor 500 EA R4,88
374 Retentioning of Mink per conductor 500 EA R5,80
375 Retentioning of Hare per conductor 500 EA R6,11
376 Retentioning of Squirrels per conductor 500 EA R7,34
377 Retentioning of Ferret per conductor 500 EA R14,30
378 Stringing of Fox per conductor (per span) 500 EA R12,98
379 Stringing of Mink per conductor (per span) 500 EA R19,34
380 Stringing of Hare per conductor (per span) 500 EA R20,65
381 Removal of Fox per line (Not ABC) (per span) 500 EA R56,62
382 Removal of Mink per line (Not ABC) (per span) 500 EA R6,60
383 Removal of Hare per line (Not ABC) (per span) 500 EA R11,35
384 Removal and transportation of high mast 500 EA R22 696,65
385 Install a single phase Split Prepaid Meter 500 EA R984,21
386 Install a 3 phase Split Prepaid Meter 500 EA R809,05
387 programming Customer CIU to meter 500 EA R121,58
388 Convert smart meter from post to prepaid or vice versa 500 EA R161,28
389 Replace AMR meter with a prepaid /Postpaid meter 500 EA R809,05
390 Commission AMR meter 500 EA R1 145,45
391 Commission prepaid/postpaid meter 500 EA R406,02
392 Install LPU meter 500 EA R976,64
393 Wiring of LPU meter board 500 EA R216,05
394 Install LV current transformers for LPU Metering 500 EA R678,94
395 Test voltage at all terminals on LPU Metering board 500 PER PHASE R150,00
396 Generate job card for LPU meter installation 500 EA R7,20
397 Drop of customer notices 500 EA R79,00
398 Replace LPU meter 500 EA R1 147,94
399 Replace CMK with Anti-Vandal CMK – C 500 EA R2 476,00
400 Replace SDB with Anti-Vandal CDU (pole mntd)(D) 500 EA R2 365,27
401 Install, test and comm. RAT#s in MSS (E) 500 EA R825,33
402 Replace CMK with Protection Enclo & In (F) 500 EA R3 576,44
403 Replace SDB with anti-Vandal, pole mntd including dec 500 EA R2 393,46
404 Connecting of kW/h meters 500 EA R382,40
405 Joint 10 mm2 split concentric LV cab 500 EA R119,67
406 Install double strain fitting 500 EA R110,04
407 Install suspension fitting 500 EA R55,02
408 Install IPCS 500 EA R27,51
409 Bandit strapping (per pole) 500 EA R34,39
410 Label service cables 500 EA R27,51
411 Decommission existing LV line 500 EA R550,22
412 Removal of redundant cables off pole 500 EA R103,17
413 Installation of stay pedestal 500 EA R343,89
414 Installation of plain Mast DIS 1 500 EA R550,22
415 Under road drilling 40mm diameter pipe 500 EA R1 220,55
416 Under road drilling 110mm diameter pipe 500 EA R1 342,61
417 Under road drilling 160mm diameter pipe 500 M R1 476,87
418 Under road drilling 300mm diameter pipe 500 EA R1 624,56
419 Install 40mm diameter sleeve 500 EA R48,40
420 Install 110mm diameter sleeve 500 M R26,37
421 Install 160mm diameter sleeve 500 M R36,37
422 Install 300mm diameter sleeve 500 M R46,37
424 Provide an EPWP worker with all the required PPE (1 per project) 500 M R1 250,00
427 Pre-paid/Post-paid Switch (programming) 500 M R161,28
428 Install, connect 3 phase kW/h meter & 80A mcb & <25 mm² cable 500 HR R738,89
429 Install, connect 3 phase kW/h meter & 80A mcb & <40m cable 500 EA R1 008,32
430 Install, connect 1 phase kW/h meter & 80A mcb & <25 mm² cable 500 EA R500,12
431 Install, connect 1 phase kW/h meter & 80A mcb & <40m cable 500 EA R782,45
accept/decline the pricing
Bidder Name: schedule

Bidder signature:
Date: