Sl. No. SOR CLAUSE Item Unit Rate


Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile
12.14 Rmt 6535
diameter-750 mm)

Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile


12.15 Rmt 10552
diameter-1000 mm)

Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile


12.16 Rmt 13236
diameter-1200 mm)

Driven cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile


12.17 Rmt 5545
diameter-750 mm)

Driven cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile


12.18 Rmt 8093
diameter-1000 mm)

Driven cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile


12.19 Rmt 10584
diameter-1200 mm)

Pile load test on single vertical pile in accordance with


12.28 tonne 434
IS:2911(Part-IV)

12.29 Cement concrete for reinforced concrete in pile cap


A RCC Grade M20 cum 4909
B RCC Grade M25 cum 5342
C RCC Grade M30 cum 5396
D RCC Grade M35 cum 5511

12.33 Taking, exploratory boring


A Upto 1.0 m below bed level metre 2450
B Beyond 1.0 m depth upto 5.0 m metre 2562
C Beyond 5.0 m depth metre 2673

1 Excavation in soil (Mechanical Means) cum


12.1 I B (i) in soil (up to 3 Mtr. Depth) 52
12.1 I B (ii) in soil( 3 Mtr. To 6 Mtr. Depth) 59
12.1 I B (iii) Above 6 Mtr. Depth 73

2 Excavation ordinary rock (Mech. Means) cum


12.1 II B (i) in ordinary rock (up to 3 Mtr. Depth) 66
12.1 II B (ii) in ordinary rock ( 3 Mtr. To 6 Mtr. Depth) 104
12.1 II B (iii) Above 6 Mtr. Depth 142

3 Concrete grade M 15 for levelling course cum


12.3 PCC M-15 4299

4 Levelling course for Pile cap PCC in M-15 below Pile cap cum
12.30 PCC M-15 4333

5 Concrete in foundation M 30 cum


12.8 G RCC M-30 5337

6 PCC of M 20 for toe wall cum


12.8 B PCC M-20 5025

7 Concrete in substructure M30 cum


13.6 G RCC M-30 5999

Pedestal M40 cum


14.1 E RCC M-40 7151

8 Concrete in Superstructure M 30 cum


14.1 C RCC M-30 6458
MPPWD SOR 2017

Sl. No. SOR CLAUSE Item Unit Rate


9 Concrete in Superstructure PSC M 45 cum
14.1 F Girder 7324

10 Appraoch slab cum


14.10 PCC M-15 4397
14.11 RCC M-30 7970

11 Reinforcement (HYSD Bar) Tonne


12.31 For Foundation 49081
13.7 For Substructure 48936
14.2 For SuperStructure 50028

12 14.3 High tensile steel wire Tonne


Tensoning wire for PSC Girder 81626

13 8.24 Crash Barrier M20 Cum 2795

14 14.7 RCC Railling M 30 Rmt 1867

15 Bearings
13.16 Tar paperBearing Sqm 43
13.13 Elastomeric Bearings cubic Cm. 0.78
13.15 Pot-PTFE Tonne 83

16 Expansion joint Rmt


14.16 (ii) Filler joint 20mm thick compressible fibre 377
14.20 Strip Seal Expansion Joint 10431

17 Concrete Wearing coat M 30 cum


14.4 75 mm thk. 10932

18 14.9 Drainage spouts Nr. 1194

19 13.9 Weep holes Nr. 173

20 Back fill cum


13.10 A With Granular material 880

21 Stone Pitching on slopes cum


15.4 A Protection against scour with stone boulders 2033

22 Filter media cum


15.5 Under neeth pitching 1265
13.11 Behind Retaining wall & Abutment 1117

23 Dismentaling with lift & lead up to 1km


for pcc M 15 to M 20 cum
2.3 I B a-abutment & Abutment 342

for rcc M 20 & Above cum


2.3 I C a-Slab,-pier,footing 886

for stone masonry cum


2.3 III A Rubble stone masonry in lime mortar 207
2.3 III B Rubble stone masonry in cement mortar. 239
2.3 II D brick 155

for pipe no.


2.3 IX A a-below 600 mm dia 135
2.3 IX B b-600 to 900 mm dia 183
2.3 IX C c-above 900 mm dia 312
MPPWD SOR 2017

Sl. No. SOR CLAUSE Item Unit Rate


2.3 I B for concrete Railing Rmt 342
TOTAL
MPPWD SOR 2017 MPPWD SOR 2016
SOR CLAUSE UNIT Rate SOR CLAUSE UNIT Rate
12.14 Rmt 6535 12.14 Rmt 7261

12.15 Rmt 10552 12.15 Rmt 11724

12.16 Rmt 13236 12.16 Rmt 14707

12.17 Rmt 5545 12.17 Rmt 6161

12.18 Rmt 8093 12.18 Rmt 8992

12.19 Rmt 10584 12.19 Rmt 11760

12.28 tonne 434 12.28 tonne 482

12.29 12.29
A cum 4909 A cum 5454
B cum 5342 B cum 5935
C cum 5396 C cum 5996
D cum 5511 D cum 6123

12.33 12.33
A metre 2450 A metre 2722
B metre 2562 B metre 2847
C metre 2673 C metre 2970

cum cum
12.1 I B (i) 52 12.1 I B (i) 58
12.1 I B (ii) 59 12.1 I B (ii) 66
12.1 I B (iii) 73 12.1 I B (iii) 81

cum cum
12.1 II B (i) 66 12.1 II B (i) 73
12.1 II B (ii) 104 12.1 II B (ii) 115
12.1 II B (iii) 142 12.1 II B (iii) 158

cum cum
12.3 4299 12.3 4777

cum cum
12.30 4333 12.30 4814

cum cum
12.8 G 5337 12.8 G 5930

cum cum
12.8 B 5025 12.8 B 5583

cum cum
13.6 G 5999 13.6 G 6485

cum cum
14.1 E 7151 14.1 E 7945

cum cum
14.1 C 6458 14.1 C 7175
MPPWD SOR 2017 MPPWD SOR 2016
SOR CLAUSE UNIT Rate SOR CLAUSE UNIT Rate
cum cum
14.1 F 7324 14.1 F 7815

cum cum
14.10 4397 14.10 4885
14.11 7970 14.11 8855

Tonne Tonne
12.31 49081 12.31 54534
13.7 48936 13.7 54373
14.2 50028 14.2 55587

14.3 Tonne 14.3 Tonne


81626 90696

8.24 Cum 2795 8.24 Cum 3105

14.7 Rmt 1867 14.7 Rmt 2.74

13.16 Sqm 43 13.16 Sqm 48


13.13 cubic Cm. 0.78 13.13 cubic Cm. 0.86
13.15 Tonne 83 13.15 Tonne 92

Rmt Rmt
14.16 (ii) 377 14.17 (ii) 419
14.20 10431 14.21 11590

cum cum
14.4 10932 14.4 12147

14.9 Nr. 1194 14.9 Nr. 1327

13.9 Nr. 173 13.9 Nr. 192

cum cum
13.10 A 880 13.10 A 978

cum cum
15.4 A 2033 15.4 A 2259

cum cum
15.5 1265 15.5 1405
13.11 1117 13.11 1241

cum cum
2.3 I B 342 2.3 I B 380

cum cum
2.3 I C 886 2.3 I C 984

cum cum
2.3 III A 207 2.3 III A 230
2.3 III B 239 2.3 III B 265
2.3 II D 155 2.3 II D 172

no. no.
2.3 IX A 135 2.3 IX A 150
2.3 IX B 183 2.3 IX B 203
2.3 IX C 312 2.3 IX C 347
MPPWD SOR 2017 MPPWD SOR 2016
SOR CLAUSE UNIT Rate SOR CLAUSE UNIT Rate
2.3 I B Rmt 342 2.3 I B Rmt 380
MPPWD SOR 2015 MPPWD SOR 2014
SOR CLAUSE UNIT Rate SOR CLAUSE UNIT Rate
12.14 Rmt 6535 12.14 Rmt 6535

12.15 Rmt 10552 12.15 Rmt 10552

12.16 Rmt 13236 12.16 Rmt 13236

12.17 Rmt 5545 12.17 Rmt 5545

12.18 Rmt 8093 12.18 Rmt 8093

12.19 Rmt 10584 12.19 Rmt 10584

12.28 tonne 434 12.28 tonne 434

12.29 12.29
A cum 4909 A cum 4909
B cum 5342 B cum 5342
C cum 5396 C cum 5396
D cum 5511 D cum 5511

12.33 12.33
A metre 2450 A metre 2450
B metre 2562 B metre 2562
C metre 2673 C metre 2673

cum cum
12.1 I B (i) 52 12.1 I B (i) 52
12.1 I B (ii) 59 12.1 I B (ii) 59
12.1 I B (iii) 73 12.1 I B (iii) 73

cum cum
12.1 II B (i) 66 12.1 II B (i) 66
12.1 II B (ii) 104 12.1 II B (ii) 104
12.1 II B (iii) 142 12.1 II B (iii) 142

cum cum
12.3 4299 12.3 4299

cum cum
12.30 4333 12.30 4333

cum cum
12.8 G 5337 12.8 G 5337

cum cum
12.8 B 5025 12.8 B 5025

cum cum
13.6 G 5999 13.6 G 5999

cum cum
14.1 E 7151 14.1 E 7151

cum cum
14.1 C 6458 14.1 C 6458
MPPWD SOR 2015 MPPWD SOR 2014
SOR CLAUSE UNIT Rate SOR CLAUSE UNIT Rate
cum cum
14.1 F 7324 14.1 F 7324

cum cum
14.10 4397 14.10 4397
14.11 7970 14.11 7970

Tonne Tonne
12.31 49081 12.31 49081
13.7 48936 13.7 48936
14.2 50028 14.2 50028

14.3 Tonne 14.3 Tonne


81626 81626

8.24 Cum 2795 8.24 Cum 2795

14.7 Rmt 1867 14.7 Rmt 1867

13.16 Sqm 43 13.16 Sqm 43


13.13 cubic Cm. 0.78 13.13 cubic Cm. 0.78
13.15 Tonne 83 13.15 Tonne 83

Rmt Rmt
14.16 (ii) 377 14.16 (ii) 377
14.20 10431 14.20 10431

cum cum
14.4 10932 14.4 10932

14.9 Nr. 1194 14.9 Nr. 1194

13.9 Nr. 173 13.9 Nr. 173

cum cum
13.10 A 880 13.10 A 880

cum cum
15.4 A 2033 15.4 A 2033

cum cum
15.5 1265 15.5 1265
13.11 1117 13.11 1117

cum cum
2.3 I B 342 2.3 I B 342

cum cum
2.3 I C 886 2.3 I C 886

cum cum
2.3 III A 207 2.3 III A 207
2.3 III B 239 2.3 III B 239
2.3 II D 155 2.3 II D 155

no. no.
2.3 IX A 135 2.3 IX A 135
2.3 IX B 183 2.3 IX B 183
2.3 IX C 312 2.3 IX C 312
MPPWD SOR 2015 MPPWD SOR 2014
SOR CLAUSE UNIT Rate SOR CLAUSE UNIT Rate
2.3 I B Rmt 342 2.3 I B Rmt 342
APPENDIX-VI

Proposals for Bridges


HIGHWAY ENGINEERING CONSULTANT
PROJECT NAME :- Begumganj-Sultanganj Road
Sl. No. Existing Design Existing Structure Proposal Structure
Chainage Chainage Type Span Arrangement No. of Retain/ Widen/ Type Span Arrangement No. of No of
Span x Length of span, m Reconstruction/ Span x Length of span, m Bridges
Newconstruction
A B C D E F G H I J K L

1 x 12.00

1 18+215 18+195 MNB Reconstruction Minor Bridge 0 x 0.00 1 1

0 x 0.00

0 x 0.00

2 0+000 0+000 MNB Reconstruction Minor Bridge 0 0

0 x 0.00

3 0+000 0+000 MNB Newconstruction Minor Bridge 0 0

0 x 0.00

4 0+000 0+000 MNB Reconstruction Minor Bridge 0 0


10
APPENDIX-VI

4 0+000 0+000 MNB Reconstruction Minor Bridge 0 0

0 x 0.00

11
APPENDIX-VI

0 x 0.00

5 0+000 0+000 MNB Reconstruction Minor Bridge 0 0

0 x 0.00

6 0+000 0+000 MNB Reconstruction Minor Bridge 0 0

0 x 0.00

7 MNB Reconstruction Minor Bridge 0 0

12
A23 7.2 7.2

A20 0.35
A22 2.70

A21 0.20

A22 2.70

A24 12.00

A21 0.30

A22 2.70
A20 0.35

0.3 2.7 0.2 2.700 0.3

A18 A12 A17 A11 A16


P14
1.2
P13

0.2

P11

10

2 0.8

P10 P8

TOE
P11

P11

0.9

P12 0.175

10

P15

1.5

P16
1.050 G3

0.125 G8

0.08 G7
G4

0.18 0.35 G9 G1

0.00 1.9

0 L1 0.0 L2

G6 0.2

G5 0.25

0.7
G2
R9 0.3

R8

#REF!

3.15 0.75
R4
R6

HEEL

R7 R7

T8

0
T1
4.2

T9
T11

21.958 3.4965
HEEL T6 T4

0.3 0.8

T7 T7
A34 A19 6.87

A35 0.3

0.3 A7 0.3

A6 0.9

A36 0.3 0.3

A15 A14

0.3 0.3 A5 0.15


2
A4 0.5 3
4
0.67 5
A13 6
A8 1.70 7
6.936 1.05 8
9

11
12
13
14
0.3 0.2 0.30 15
A18 A17 A16 16
17
18
2.7 2.7 1 19
20
21
#REF! A12 A11 A9 22

A3 23
A2 0.5
0.3 24
A1 A1 25
0.15 26
A23 7.2 27
28
29
30
31
32
33
34
35
36

For Abutment Pile


37
38
39

For Wall Type Abu


40
41
25.99

PIER DETAILS

FML 575.91 1
2
3
4
P7 0.9 5
6
7
P6 0.5 8
9

P5
10
0.5 11
12
P13 13
0.2 14
15
16

P4 78.742 17
18
GL 498.4 19
20

For Pier Pile Cap


2 37
P10 38
0.45 39
P3
HEEL

P2 0.5
P2 0.5

FDL 494.31
A1 0.15

12

FML

P7

P5 0.5

P6 0.5

P15 1.5

8 Girder DETAILS
Girder I
1
2
3
4
5
6
7
8

12.000 L3 0 0 9
10
11
12
13
14
15
16
17

Girder II
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Girder III
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

10
FML 575.91 1
2
3
4
5
6
7
R3 3.931 8
GL 573.6 9

2
R5

0.2
R2
TOE

R1 0.2

FDL 571.58

R1 0.15

5.9
TOE WALL DETA

2
3
0.3 5
GL 574 6
7
8
9
10
11
T3 1.5 12
13
14
15
T12 1.5
T4 T5

0.8 0.3 TOE

T2 0.2 = 572

A1 0.15
T7
1.4
Pier FDN Shape Trapezoid
Pier Sub Str Sha Rectangular
Pier Pile Type Bored Pile
No Of Piles 6
Pier Pile Dia 1200
Pier Pile Length 25

Retain Wall Type Wall Type


Retain Wal FDN Open FDN
Retainwall Pile Bored Pile
No Of Piles 6
Pier Pile Dia 1000
Pier Pile Length 15

type of railing rcc railing


Span
Length
Formation lvl FML 575.906
Ground lvl GL 573.575
Foundation lvl FDL 568.370
Soffit level SFL 574.931
Abt PCC Height A1 0.15
Abt Fdn Height A2 0.3
Abt Toe Height A3 0.5
Cap Height A4 0.5
Height of Kerb A5 0.15
Dirt wall Height A6 0.899999999999909
Abt. Slab Thickness A7 0.3
Abt. Wall Height A8 6.936
Abt . Toe Width A9 1

Side/ Intermediate wall length (Front wall Side) A11 2.7


Side/ Intermediate wall length(Rear wall Side) A12 2.7
Cap Over Hang Portion Length A13 0.67
Abt Cap Length A14 0.3
Dirt Wall Length A15 0.3
Abt Front wall Length A16 0.3
Abt Middle wall Length A17 0.2
Abt Rear wall Length A18 0.3
Abt Top Length A19 6.87
Abt side wall width A20 0.3
Abt Intermediate wall width A21 0.2
Cell Width A22 2.7
2.4
Abt Fdn Length A23 7.2
Abt Fdn Width/Approch slab Width A24 12.0
No of Cell in one Row A25 2
No of Cell in one Column A26 4
No of Abutments/ Approch slab A27 2
Length of Approch Slab A28 3.5
Approch slab Thickness A29 0.3
Elastomeric bearing length A30 0
Elastomeric bearing width A31 0
Elastomeric/POT PTFE bearing height A32 0
Thickness of Bearing Coat A33 0.075
Bracket Rectangular Length A34 0.3
Bracket Rectangular Height A35 0.3
Bracket triangular Height A36 0.3
For Abutment Pile Cap
Abut Pile Cap height A37 1.8
Abut Pile Cap Length A38 8.7
Abut Pile Cap Width A39 12

For Wall Type Abutment


Abt Lower Rect Height A40 0.5
Abt Upper Rect Height A41 1
Abt. Heel Width 4.2
Abt. Toe Width 4.2
Offset near stem 0
Abt Stem Length 0.3
Abt. Cap Width 12

Abut Cap overhang length 0.67


Rectangle height 0.5
Traingle height 0

Solid Slab or Deck Slab

Footing
PIER DETAILS
Pier
Ground lvl GL 498.370
Foundation lvl FDL 494.314
No of Piers P1 0
Pier Footing Rect Port. Height P2 0.5
Pier Footing Trap Port. Height P3 0.45
Pier Stem Height P4 78.742
Pier Cap Trap Port. Height P5 0.5
Pier Cap Rect Port. Height P6 0.5
Pier Cap width 12
Slab Thickness P7 0.899999999999909
Pier Stem Length P8 0.8
Offset P9 0.1
Pier Foot Trap Half length P10 2
Pier Foot length P11 5
Pier Foot Width P12 10
Pier Cap Cantilever Length P13 0.2
Pier Cap Length P14 1.2
Pier Cap cantilever Portion Width P15 1.5
Pier Stem rectangle width P16 8
Pier Stem perabola width 0.5
No of Pedestrals P17 0
Pedestral length P18 0
Pedestral width P19 0
Pedestral HEIGHT P20 0

For Pier Pile Cap


Pier Pile Cap height A37 1.8
Pier Pile Cap Length A38 5.1
Pier Pile Cap Width A39 8.7
Reinforcement (HYSD Bars)
Foundation 100
Sub structure 110
Deck Slab 120
Psc girder 120
Rcc girder 120
solid slab 120

Cantilever Solid Slab


Top Length 12
Bottom Length 9
Top Rectangle Height 0.2
Top Trapezoidal Height 0.15
Bottom Rectangle Height 0.549999999999909
Total Area 8.92499999999918

Girder DETAILS Rcc Girder


Girder I
Over all depth of Girder G1 0
Flange width Bottom G2 0
Flange width top G3 0
Web Thk G4 0
Flange height bottom (Mid) G5 0
Flange Sloping height bottom (Mid) G6 0
Flange height Top (Mid) G7 0
Flange Sloping height Top (Mid) G8 0
Flange height Top (End) 0
Flange Sloping height Top (End) 0
Web Height G9 0.00
Area at mid section A1 0.000
Area at End section A2 0.000
Area at Flaring section A3 0.000
Lenght at mid section L1 12.0
Lenght at End section L2 0.0
Lenght at Flaring section L3 0.0
No of cable in psc girder 0.0
Length of cable psc girder 0.0

Girder II Rcc Girder


Over all depth of Girder G1 0
Flange width Bottom G2 0
Flange width top G3 0
Web Thk G4 0
Flange height bottom G5 0
Flange Sloping height bottom G6 0
Flange height Top G7 0
Flange Sloping height Top G8 0
Web Height G9 0.00
Area at mid section A1 0.000
Area at End section A2 0.000
Area at Flaring section A3 0.000
Lenght at mid section L1 0.0
Lenght at End section L2 0.0
Lenght at Flaring section L3 0.0

Girder III Rcc Girder


Over all depth of Girder G1 0
Flange width Bottom G2 0
Flange width top G3 0
Web Thk G4 0
Flange height bottom G5 0
Flange Sloping height bottom G6 0
Flange height Top G7 0
Flange Sloping height Top G8 0
Web Height G9 0.00
Area at mid section A1 0.000
Area at End section A2 0.000
Area at Flaring section A3 0.000
Lenght at mid section L1 0.0
Lenght at End section L2 0.0
Lenght at Flaring section L3 0.0

Ground lvl GL 573.575


Foundation lvl FDL 571.575
No of Retaining wall R10 0.0
RTW Footing Rect Port. Height R1 0.2
RTW Footing Trap Port. Height R2 0.2
RTW stem Height R3 3.931
RTW wall bottom width R4 0.8
Length RTW trap port Toe side R5 2.0
Length RTW trap port Heal side R6 3.2
Width of Footing R8 5.9
Footing Length R7 3.49649999999986
Top width of wall R9 0.3
TOE WALL DETAILS

Ground lvl GL 573.575


Foundation lvl FDL 571.875
Toe Footing Rect Port. Height T2 0.2
Toe Wall Height T3 1.500
Toe wall bottom width T4 0.8
Width Rect port toe side T5 0.3
Width Rect port Heal side T6 0.3
Width of Toe wall T7 1.4
Top width of wall T8 0.3
Radius of slope T9 3.50
Inclined Slope T10 4.20
Length of Toe Wall T11 21.96
Toe wall Height below GL T12 1.500
Rectangular Section
Square Section
Circular Section
Abutment Type
HIGHWAY ENGINEERING CONSULTANT

Begumganj-Sultanganj Road

Abstract for Minor Bridge's" Reconstruction

Sl. No. Clause No. Item Unit Qty. Rate Total Rate

1 12.33 Taking, exploratory boring

A Upto 1.0 m below bed level mtr 2.00 2450 4900.00


B Beyond 1.0 m depth upto 5.0 m mtr 8.00 2562 20496.00
C Beyond 5.0 m depth mtr 20.00 2673 53460.00

1 Bored cast-in-situ M35 grade R.C.C. pile


excluding reinforcement Rmt
12.14 (Pile diameter-750 mm) 0.00 6535 0.00
12.15 (Pile diameter-1000 mm) 0.00 10552 0.00
12.16 (Pile diameter-1200 mm) 0.00 13236 0.00

1 Driven cast-in-situ M35 grade R.C.C. pile


excluding reinforcement Rmt
12.17 (Pile diameter-750 mm) 0.00 5545 0.00
12.18 (Pile diameter-1000 mm) 0.00 8093 0.00
12.19 (Pile diameter-1200 mm) 0.00 10584 0.00
Pile load test on single vertical pile in
1
accordance with IS:2911(Part-IV) tonne
12.28 Load test 0.00 434 0.00

2 Excavation in soil (Mechanical Means) cum


12.1 I B (i) in soil (up to 3 Mtr. Depth) 374.10 52 19453.25
3Mtr. To 6 Mtr. Depth 244.09 59 14401.52
Above 6 Mtr. Depth 0.00 73 0.00

3 Excavation ordinary rock (Mech. Means) cum


12.1 II B in ordinary rock (up to 3 Mtr. Depth) 249.40 66 16460.44
3Mtr. To 6 Mtr. Depth 162.73 104 16923.82
Above 6 Mtr. Depth 0.00 142 0.00

4 Concrete grade M 15 for levelling course cum


12.3 PCC M-15 32.82 4299 141072.18

4 12.30 Levelling course for Pile cap PCC in M-15 below Pile cap
PCC M-15 cum 0.00 4333 0.00

5 Concrete in foundation M 30 cum


12.8 G RCC M-30 57.84 5337 308692.08

5 12.29 Cement concrete for reinforced concrete in


pile cap cum
A RCC Grade M20 0.00 4909 0.00
B RCC Grade M25 0.00 5342 0.00
C RCC Grade M30 0.00 5396 0.00
D RCC Grade M35 0.00 5511 0.00

6 PCC of M 20 for toe wall cum


12.8 B PCC M-20 24.26 5025 121924.65

7 Concrete in substructure M30 cum


13.6 G RCC M-30 236.52 5999 1418900.04

7 Pedestal M40 cum


14.1 E RCC M-40 0.00 7151 0.00

8 Concrete in Superstructure M 30 cum


14.1 C RCC M-30 189.86 6458 1226141.71
PSC M-45 0.00 7324 0.00

8 Concrete in Superstructure( Girder) cum


14.1 F Rcc Girder 0.00 6458 0.00
Psc Girder 0.00 7324 0.00

8 Appraoch slab cum


HIGHWAY ENGINEERING CONSULTANT

Begumganj-Sultanganj Road

Abstract for Minor Bridge's" Reconstruction

Sl. No. Clause No. Item Unit Qty. Rate Total Rate
14.10 PCC M-15 0.00 4397 0.00
14.11 RCC M-30 0.00 7970 0.00

9 Reinforcement (HYSD Bar) Tonne


12.31 For Foundation 5.78 66069 382143.10
13.7 For Substructure 26.02 66217 1722801.04
14.2 For SuperStructure 22.78 67435 1536417.46

9 14.3 High tensile steel wire Tonne


Tensoning wire for PSC Girder 0.00 81626 0.00

9 8.24 Crash Barrier M40 Cum 0.00 2795 0.00

10 14.7 RCC Railling M 30 Rmt 38.00 1867 70946.00

10 Bearings
13.16 Tar paperBearing Sqm 0.00 43 0.00
13.14 Elastomeric Bearings cubic Cm. 0.00 0.78 0.00
13.12 Pot PTFE Bearing Tonne 0.00 83 0.00

11 Expansion joint Rmt


14.16 (ii) Filler joint 20mm thick compressible fibre 24.00 377 9048.00
14.20 Strip Seal Expansion Joint 0.00 10431 0.00

12 Concrete Wearing coat M 30 cum


14.4 75 mm thk. 10.80 10932 118065.60

13 14.9 Drainage spouts Nr. 5.00 1194 5970.00

14 13.9 Weep holes Mtr 33.00 173 5709.00

15 Back fill cum


13.10 A With Granular material 793.10 880 697924.34

16 Stone Pitching on slopes cum


15.4 A Protection against scour with stone boulders 13.85 2033 28153.09

17 Filter media cum


15.5 Under neeth pitching 6.92 1265 8758.89
13.11 Behind Retaining wall & Abutment 0.00 1117 0.00

18 Dismentaling with lift & lead up to 1km


for pcc M 15 to M 20 cum
2.3 I B Head wall of hpc 45.50 342 15561.00

for rcc M 20 & Above cum


2.3 I C a-Slab,-pier,footing 0.00 886 0.00

for stone masonry cum


2.3 III A Rubble stone masonry in lime mortar 0.00 207 0.00
2.3 III B Rubble stone masonry in cement mortar. 0.00 239 0.00
Brick masonry in cement mortar. 0.00 155 0.00

for pipe no.


2.3 IX A a-below 1200mm dia 30.00 135 4050.00
2.3 IX B b-600 to 900 mm dia 0.00 183 0.00
2.3 IX C c-above 900 mm dia 0.00 312 0.00

2.3 I B for concrete Railing Rmt 0.00 342 0.00

20 Diversion Cost
Excavation in soil 278.28 52 14470.47
Concrete grade M 15 for levelling course 26.25 4299 112848.75
PCC of M 20 for head wall 158.86 5025 798256.78
Granular bed for RCC pipes 56.59 880 49800.61
NP4 Hume pipes 30.00 31100 933000.00
Construction of embankment/subgrade/earthen shoulders 540.00 144 77760.00
Construction of granular sub-base
for grading- I Material 0.00
for grading- II Material 270.00 764 206280.00
for grading-III Material 0.00
TOTAL 10160789.79
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 18+195 Span- 1X12
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
Taking, exploratory boring
1
Upto 1.0 m below bed level Metre 2 1 2.0
TOTAL 2.0
Beyond 1.0 m depth upto 5.0 m Metre 2 4 8.0
TOTAL 8.0
Beyond 5.0 m depth Metre 2 10 20.0
TOTAL 20.0
1 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-750 mm)
For Abutment Metre 0 0 0.0
For Pier Metre 0 0 0.0
For Retaining Wall Metre 0 0 0.0
TOTAL 0.0
1 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-1000 mm)
For Abutment Metre 0 0 0.0
For Pier Metre 0 0 0.0
For Retaining Wall Metre 0 15 0.0
TOTAL 0.0
1 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-1200 mm)
For Abutment Metre 0 25 0.0
For Pier Metre 0 25 0.0
For Retaining Wall Metre 0 0 0.0
TOTAL 0.0
1 Driven cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-750 mm)
For Abutment Metre 0 0 0.0
For Pier Metre 0 0 0.0
For Retaining Wall Metre 0 0 0.0
TOTAL 0.0
1 Driven cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-1000 mm)
For Abutment Metre 0 0 0.0
For Pier Metre 0 0 0.0
For Retaining Wall Metre 0 15 0.0
TOTAL 0.0
1 Driven cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-1200 mm)
For Abutment Metre 0 25 0.0
For Pier Metre 0 25 0.0
For Retaining Wall Metre 0 0 0.0
TOTAL 0.0
1 Pile load test on single vertical pile in accordance with IS:2911(Part-IV)
For Abutment tonne 0.0
For Pier tonne 0.0
For Retaining Wall tonne 0.0
TOTAL 0.0
2 Excavation on Soil
up to 3 Mtr. Depth
For Abutment Foundation Cum 2 7.50 12.30 1.80 332.1
For Pier Foundation Cum 0 0.00 0.00 2.52 0.0
For Retaining Wall Foundation Cum 0 0.00 0.00 1.29 0.0
For Toe Wall Cum 1 22.26 1.70 1.11 42.0
TOTAL - 374.1
3 Mtr. To 6 Mtr. Depth
For Abutment Foundation Cum 2 7.50 12.30 1.3 244.1
For Pier Foundation Cum 0 0.00 0.00 0.63 0.0
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 22.26 1.70 0.00 0.0
TOTAL 244.1
Above 6 Mtr. Depth
For Abutment Foundation Cum 2 7.50 12.30 0.00 0.0
For Pier Foundation Cum 0 0.00 0.00 0.00 0.0
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 18+195 Span- 1X12
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
For Toe Wall Cum 1 22.26 1.70 0.00 0.0
TOTAL 0.0

3 Excavation on Ordinary Rock


up to 3 Mtr. Depth
For Abutment Foundation Cum 2 7.50 12.30 1.20 221.4
For Pier Foundation Cum 0 0.00 0.00 1.68 0.0
For Retaining Wall Foundation Cum 0 0.00 0.00 0.86 0.0
For Toe Wall Cum 1 22.26 1.70 0.74 28.0
TOTAL 249.4
3 Mtr. To 6 Mtr. Depth
For Abutment Foundation Cum 2 7.50 12.30 0.88 162.7
For Pier Foundation Cum 0 0.00 0.00 0.42 0.0
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 22.26 1.70 0.00 0.0
TOTAL 162.7
Above 6 Mtr. Depth
For Abutment Foundation Cum 2 7.50 12.30 0.00 0.0
For Pier Foundation Cum 0 0.00 0.00 0.00 0.0
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 22.26 1.70 0.00 0.0
TOTAL 0.0

4 PCC M-15 for Leveling course


For Abutment Foundation Cum 2 7.50 12.30 0.15 27.7
For Pier Foundation Cum 0 0.00 0.00 0.00 0.0
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 22.11 1.55 0.15 5.1
TOTAL - 32.8
4 Leveling course for Pile cap PCC in M-15 below Pile cap
For Abutment Pile Fondation Cum 2 7.50 12.15 0.15 0.0
For Pier Pile Fondation Cum 0 0.00 0.00 0.00 0.0
For Retaining wall Pile Fondation Cum 0 0.00 0.00 0.00 0.0
0.0
4 RCC M-30 for Foundation
For Wall type Abutment Foundation Cum 0 8.70 12.00 0.50 0.0
For Abt TOE Triangular Portion Cum 0 4.20 12.00 1.00 0.0
For Abt HEEL Triangular Portion Cum 0 4.20 12.00 1.00 0.0
For Abt Upper Rectangular Portion Cum 0 0.30 12.00 1.00 0.0
TOTAL 0.0
5 RCC M-30 for Foundation
For Box Type Abutment Cum 2 6.20 12.00 0.30 44.6
For Box Type Abt TOE Cum 2 1.00 12.00 0.55 13.2
Pier Foundation Lower Rectangular Portion Cum 0 0.00 0.00 0.00 0.0
Pier Foundation Upper Rectangular Portion Cum 0 0.00 0.00 0.00 0.0
Pier Foundation Triangular Portion Cum 0 0.00 0.00 0.00 0.0
Pier Footing (Square) Cum 0 5-10 1-1 0.45 0.00
For Retaining Wall Lower Rect Portion Cum 0 0.00 0.00 0.00 0.0
Retaining Wall Upper Rect Portion Cum 0 0.00 0.00 0.00 0.0
Retaining Wall Toe Portion Cum 0 0.00 0.00 0.00 0.0
Retaining Wall Heel Portion Cum 0 0.00 0.00 0.00 0.0
TOTAL - 57.8
5 RCC M-30 in Pile Cap
For Wall Type Abutment Pile Cap Foundation Cum 0 8.70 12.00 1.80 0.0
TOTAL 0.0
5 RCC M-30 in Pile Cap
For Box Type Abutment Pile Foundation Cum 2 7.20 12.00 1.80 0.0
Pier Pile Cap Cum 0 0.00 0.00 0.00 0.0
Retaining Wall Pile Cap Cum 0 0.00 0.00 0.00 0.0
TOTAL 0.0
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 18+195 Span- 1X12
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
6 PCC M 20 Toe wall
Toe wall Rectangular Portion Cum 1 21.96 1.40 0.20 6.1
Toe wall Upper Rect Portion Cum 1 21.96 0.30 1.50 9.9
Toe wall Triangular Portion Cum 1 21.96 0.50 1.50 8.2
Total - 24.3
7 RCC M-30 for Sub-Structure
Abt Front Wall Cum 2 0.30 12.00 5.76 41.5 6.38
Abt Rear Wall Cum 2 0.30 12.00 6.94 49.9 7.4
Abt Middle wall Cum 2 0.20 12.00 6.94 33.3
Abutment side (Rear & Mid) Cum 4 2.700 0.30 6.936 22.5
Abutment side (Below Cap) Cum 4 2.700 0.30 6.34 20.5
Abutment side (From Cap) Cum 4 2.030 0.30 0.60 1.5
Abt intermdiate wall (Rear & Mid) Cum 6 2.700 0.20 6.94 22.5
Abt intermdiate wall (Front up to soffit) Cum 6 2.700 0.20 5.76 18.7
Abt intermdiate wall (Front Above soffit) Cum 6 3.070 0.20 0.60 2.2
Abut. Cap Cum 2 0.30 12.00 0.50 3.6
Overhang Cap Rect. Portion Cum 2 1.34 12.00 0.50 16.1
Overhang Cap Traingular Portion Cum 0 0.00 12.00 0.0
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 18+195 Span- 1X12
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
Box Abt Dirt wall Cum 2 0.30 12.00 0.60 4.3
For Retaining Wall Cum 0 0.00 0.00 0.00 0.0
Pier stem rectangle Cum 0 0.00 0.00 0.00 0.0
Pier stem perabola Cum 0 0.53 0.00 0.0
Pier Cap Lower Rect Portion Cum 0 0.00 0.00 0.00 0.0
Pier Cap Triangular Portion Cum 0 0.00 0.00 0.00 0.0
Pier Cap Upper Rect Portion Cum 0 0.00 0.00 0.00 0.0
Bracket Rect portion Cum 0 0.30 12.00 0.30 0.0
Bracket Triangular portion Cum 0 0.30 12.00 0.30 0.0
Return Wall Cum 0 0.60 4.20 5.91 0.0
Total - 236.5
7 RCC M-40 for Sub-Structure
Pedestal Cum 0 0.00 0.00 0.00 0.0
Total 0.0
8 RCC M 30 Super Structure
Box Type Slab
Cum 1 5.00 0.0
Cum 0 0.00 11.18 0.0
Solid slab Cum 1 12.00 12.00 0.900 129.6
Solid slab II Cum 0 0.00 12.00 0.900 0.0
Solid slab III Cum 0 0.00 12.00 0.900 0.0
Cantilever Solid Slab Cum 1 0.00 12.000 0.0
Camber of Solid slab Cum 2 12.00 6.00 0.075 10.8
Camber of Solid slab II Cum 0 0.00 6.00 0.075 0.0
Camber of Solid slab III Cum 0 0.00 6.00 0.075 0.0
Abut Box top Slab Cum 2 6.87 12.00 0.30 49.5
Total - 189.9
8 Crash Barrier (M-40) for Super Structure
Crash barrier Concrete Cum 0 14.74 0.310 0.0
Total 0.0
8 Concrete in Superstructure M 35 (RCC/PSC)
M-30 for Rcc Longitudnal Girder Cum 0 - - - 0.0
M-30 for Rcc Cross Girder Cum - - - - 0.0
M-30 for Rcc Longitudnal Girder Cum 0 - - - 0.0
M-30 for Rcc Cross Girder Cum - - - - 0.0
M-30 for Rcc Longitudnal Girder Cum 0 - - - 0.0
M-30 for Rcc Cross Girder Cum - - - - 0.0
Total 0.0
8 PCC M-15 for Approach slab
Approach slab Cum 0 3.50 12.00 0.15 0.0
Total 0 0.0
8 RCC M-30 for Approach slab
Approach slab Cum 0 3.50 12.00 0.30 0.0
Total 0 0.0
9 Reinforcement (HYSD Bars)
Foundation
For abutment 100.00 57.84 5.8
For Pier 100.00 0.00 0.0
For retaining wall 100.00 0.00 0.0
Total Mt 100.00 58 - - 5.8 5.8
Sub structure
For abutment 110.00 237 26.0
For Pier 110.00 0 0.0
For retaining wall 110.00 0 0.0
For Return Wall 110.00 0 0.0
Total Mt 110.00 237 - - 26.0 26.0
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 18+195 Span- 1X12
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
Solid slab Mt 120.00 190 - - 22.8 22.8
For Rcc Girder120 kg / cum conc. Mt 120 0 - - 0.0 0.0
RCC Approch slab @ 0kg/cum conc. Mt 0 0.0 - - 0.0 0.0
RCC Crash Barrier @ 150 kg/cum conc. Mt 150 0.0 - - 0.0 0.0
Total - 22.8
9 High tensile steel wire
Tensoning wire for Psc Girder Mt 0 0.00 0.0
Total 0.0
9 Crash Barrier
Crash barrier RCC Rm 0 12.00 - - 0.0
Total 0.0
10 RCC Railing
Railing RCC 2 19.00 - - 38.0
Total - 38.0
10 Tar Paper Bearing
Tar Paper Bearing Sqm 2 12.00 0.00 - 0.0
Total 0.0
10 Elastomeric Bearing
Elastomeric Bearing Cu cm 0 0.000 0.000 0.000 0.0
Total 0.0
10 Pot PTFE Bearing
Pot PTFE Bearing Tonne 0 100.00 - - 0.0
Total 0.0
11 Filler joint 20mm thick Expansion joint
Filler joint 20mm thick Expansion joint Rm 2 - 12.00 - 24.0
Total 24.0
11 Strip seal Expansion joint
Strip seal Expansion joint Rm 0 - 12.00 - 0.0
Total 0.0
12 Concrete Wearing coat M 30
Above Solid slab Cum 1 12.00 12.00 0.075 10.8
Total - 10.8
12 Filter media :
Behind Abutment on Face wall Cum 8 2.70 0.60 0.86 0.0
Behind Abutment on Side wall (Front side) Cum 2 2.70 0.60 0.86 0.0
Behind Abutment on Side wall (Rear & Mid side) Cum 4 2.70 0.60 0.86 0.0
Behind Retaining wall Cum 0 0.00 0.00 0.00 0.0
Behind Return wall Cum 0 4.20 0.00 0.86 0.0
Total 0 0.0
13 Drainage spout

Drainage spout I No. 2 2 5.0


Drainage spout II No. 0 0 0.0
Drainage spout III No. 0 0 0.0
Total - 5.0
14 Weep holes
Behind Abutment on Face wall Cum 8 1.70 0.30 0.86 3.0
Behind Abutment on Side wall Front side Cum 8 1.70 0.86 12.0
Behind Abutment on Side wall Rear & Mid side Cum 8 2.70 0.86 18.0
Behind Retaining wall Cum 0 0.00 0.00 0.00 0.0
Behind Return wall Cum 0 4.20 0.60 0.86 0.0
Total - 33
15 Granular Back fill
Abutment Front Cell (below Cap) Cum 8 2.70 2.70 5.84 340.4
Abutment Front Cell (Above Cap) Cum 8 2.030 2.70 1.10 48.2
Abutment Rear and Mid Cell Cum 8 2.70 2.70 6.94 404.5
Granular Back fill behind abutment Cum 0 1.57 10.80 0.0
Total 793.1
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 18+195 Span- 1X12
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
16 Stone Pitching
Stone Pitching Cum 1 46.16 0.30 13.8
Total 13.85
17 Filter media beneath pitching
Filter media beneath pitching Cum 1 46.16 0.15 6.9
Total 6.92
18 Dismentaling
For PCC
Head wall Cum 2 13.00 1.25 1.40 45.5
b-pier Cum 0 1.50 7.50 0.15 0.0
Total 45.50
For RCC
a-Slab Cum 0 7 7.50 0.60 0.0
b-pier Cum 0 2.00 5.50 6.00 0.0
c-footing Pier & Abutment Cum 0 2.00 5.50 1.50 0.0
BOX Cum
Total 0.00
Rubble Stone masonry with lime mortar Cum 0.0
Total 0.0
Rubble Stone masonry with Cement mortar Cum 0 0.80 7.50 1.50 0.0
Total 0.0
a- Up to 1200 mm dia Rm 4 7.5
Total 30.0
a- Up to 600 mm dia Rm 0.0
Total 0.0
b-600 to 900 mm dia Rm 0.0
Total 0.0
c-Above 900 mm dia Rm 0.0
Total 0.0
for concrete railling Rm 0 100.00 0.0
Total ` 0.0
20 Diversion

Earthwork in Excavation of foundations for


structures complete as per Technical
Specifications Clause 304 and 2903 including all
leads and lifts.
Earthwork including
For Pipe bedding 1 4.70 5.92 2.05 57.0
Flooring U/s 1 12.50 1.50 0.30 5.6
Deduction -2 1.77 0.30 -1.1
Flooring D/s 1 12.50 3.00 0.30 11.3
Deduction -2 5.47 0.30 -3.3
For head wall 0 12.65 1.40 0.80 0.0
cum total 69.6

Providing PCC / RCC in open foundations


complete excluding reinforcement as per
drawings and Technical Specifications
M-15 grade in levelling course
Below Headwall cum 2 12.50 1.40 0.15 5.3
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 18+195 Span- 1X12
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.

Providing PCC M 20 in Head wall,curtain wall


complete excluding reinforcement as per
drawings and Technical Specifications
M-20 grade
For Head Wall cum 2 12.50 0.83 2.69 55.5
Deduction for pipe (Area of Pipe) cum 2 0.83 4.89 8.1
total 63.5

Providing and laying Granular bed for RCC pipes


in culverts with all lifts and leads complete as per
Technical Specification Clause 2904.
M-15 grade
Below Pipe cum 1 4.70 5.92 0.55 15.3
Deduction cum -1 4.70 0.25 SQM -1.2
cum total 14.1

Providing , laying and jointing NP4 (as per IS:458)


Hume pipes for culverts, complete as per
Technical Specification Section 2900 and IRC
Special Publication No.13.
FOR 2 ROW
Φ 1200 m 7.50 7.5
Φ 1000
Φ 900

Construction of embankment/ subgrade/


earthen shoulders with approved material
obtained from borrow pits with all lifts & leads
including excavation, transporting to site, 1 52.50 7.50 0.30 118.1
spreading, grading to required slope and
compacted to meet requirement of table No.
300-2 and as per relevant clauses of section-
300. cum

Construction of granular sub-base by providing


coarse graded material, spreading in
uniform layers with on prepared surface, .
mixing by mix in place method at OMC, and
compacting with vibratory roller to achieve
the desired density, complete in all respect
and as per relevant clauses of section-400.
for grading- I Material cum
for grading- II Material cum 1 52.50 7.50 0.15 59.1
for grading-III Material cum
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
Taking, exploratory boring
0
Upto 1.0 m below bed level Metre 2 1 2.0
TOTAL 0.0
Beyond 1.0 m depth upto 5.0 m Metre 2 4 8.0
TOTAL 0.0
Beyond 5.0 m depth Metre 2 10 20.0
TOTAL 0.0
0 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-750 mm)
For Abutment Metre 0 0 0.0
For Pier Metre 0 0 0.0
For Retaining Wall Metre 0 0 0.0
TOTAL 0.0
0 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-1000 mm)
For Abutment Metre 0 0 0.0
For Pier Metre 0 0 0.0
For Retaining Wall Metre 0 15 0.0
TOTAL 0.0
0 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-1200 mm)
For Abutment Metre 0 25 0.0
For Pier Metre 0 25 0.0
For Retaining Wall Metre 0 0 0.0
TOTAL 0.0
0 Driven cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-750 mm)
For Abutment Metre 0 0 0.0
For Pier Metre 0 0 0.0
For Retaining Wall Metre 0 0 0.0
TOTAL 0.0
0 Driven cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-1000 mm)
For Abutment Metre 0 0 0.0
For Pier Metre 0 0 0.0
For Retaining Wall Metre 0 15 0.0
TOTAL 0.0
0 Driven cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-1200 mm)
For Abutment Metre 0 25 0.0
For Pier Metre 0 25 0.0
For Retaining Wall Metre 0 0 0.0
TOTAL 0.0
0 Pile load test on single vertical pile in accordance with IS:2911(Part-IV)
For Abutment tonne 0.0
For Pier tonne 0.0
For Retaining Wall tonne 0.0
TOTAL 0.0
0 Excavation on Soil
up to 3 Mtr. Depth
For Abutment Foundation Cum 2 6.80 12.30 1.80 301.1
For Pier Foundation Cum -1 5.30 10.30 1.80 -98.3
For Retaining Wall Foundation Cum 0 0.00 0.00 1.29 0.0
For Toe Wall Cum 1 17.68 1.70 1.11 33.4
TOTAL 0 0.0
3 Mtr. To 6 Mtr. Depth
For Abutment Foundation Cum 2 6.80 12.30 1.0 160.7
For Pier Foundation Cum -1 5.30 10.30 0.90 -48.9
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 17.68 1.70 0.00 0.0
TOTAL 0.0
Above 6 Mtr. Depth
For Abutment Foundation Cum 2 6.80 12.30 0.00 0.0
For Pier Foundation Cum -1 5.30 10.30 0.00 0.0
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 17.68 1.70 0.00 0.0
TOTAL 0.0

0 Excavation on Ordinary Rock


up to 3 Mtr. Depth
For Abutment Foundation Cum 2 6.80 12.30 1.20 200.7
For Pier Foundation Cum -1 5.30 10.30 1.20 -65.5
For Retaining Wall Foundation Cum 0 0.00 0.00 0.86 0.0
For Toe Wall Cum 1 17.68 1.70 0.74 22.2
TOTAL 0.0
3 Mtr. To 6 Mtr. Depth
For Abutment Foundation Cum 2 6.80 12.30 0.64 107.1
For Pier Foundation Cum -1 5.30 10.30 0.60 -32.6
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 17.68 1.70 0.00 0.0
TOTAL 0.0
Above 6 Mtr. Depth
For Abutment Foundation Cum 2 6.80 12.30 0.00 0.0
For Pier Foundation Cum -1 5.30 10.30 0.00 0.0
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 17.68 1.70 0.00 0.0
TOTAL 0.0

0 PCC M-15 for Leveling course


For Abutment Foundation Cum 2 6.80 12.30 0.15 25.1
For Pier Foundation Cum -1 5.15 10.15 0.15 -7.8
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 17.53 1.55 0.15 4.1
TOTAL 0 0.0
0 Leveling course for Pile cap PCC in M-15 below Pile cap
For Abutment Pile Fondation Cum 2 6.80 12.15 0.15 0.0
For Pier Pile Fondation Cum -1 5.15 10.15 0.15 0.0
For Retaining wall Pile Fondation Cum 0 0.00 0.00 0.00 0.0
0.0
0 RCC M-30 for Foundation
For Wall type Abutment Foundation Cum 0 8.70 12.00 0.50 0.0
For Abt TOE Triangular Portion Cum 0 4.20 12.00 1.00 0.0
For Abt HEEL Triangular Portion Cum 0 4.20 12.00 1.00 0.0
For Abt Upper Rectangular Portion Cum 0 0.30 12.00 1.00 0.0
TOTAL 0.0
0 RCC M-30 for Foundation
For Box Type Abutment Cum 2 5.50 12.00 0.30 39.6
For Box Type Abt TOE Cum 2 1.00 12.00 0.55 13.2
Pier Foundation Lower Rectangular Portion Cum -1 5.00 10.00 0.50 -25.0
Pier Foundation Upper Rectangular Portion Cum -1 1.00 10.00 0.45 -4.5
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
Pier Foundation Triangular Portion Cum -2 2.00 10.00 0.45 -9.0
Pier Footing (Square) Cum 0 5-10 1-1 0.45 0.00
For Retaining Wall Lower Rect Portion Cum 0 0.00 0.00 0.00 0.0
Retaining Wall Upper Rect Portion Cum 0 0.00 0.00 0.00 0.0
Retaining Wall Toe Portion Cum 0 0.00 0.00 0.00 0.0
Retaining Wall Heel Portion Cum 0 0.00 0.00 0.00 0.0
TOTAL 0 0.0
0 RCC M-30 in Pile Cap
For Wall Type Abutment Pile Cap Foundation Cum 0 8.70 12.00 1.80 0.0
TOTAL 0.0
0 RCC M-30 in Pile Cap
For Box Type Abutment Pile Foundation Cum 2 6.50 12.00 1.80 0.0
Pier Pile Cap Cum -1 5.10 8.70 1.80 0.0
Retaining Wall Pile Cap Cum 0 0.00 0.00 0.00 0.0
TOTAL 0.0
0 PCC M 20 Toe wall
Toe wall Rectangular Portion Cum 1 17.38 1.40 0.20 4.9
Toe wall Upper Rect Portion Cum 1 17.38 0.30 1.50 7.8
Toe wall Triangular Portion Cum 1 17.38 0.50 1.50 6.5
Total 0 0.0
0 RCC M-30 for Sub-Structure
Abt Front Wall Cum 2 0.30 12.00 4.92 35.4 6.38
Abt Rear Wall Cum 2 0.30 12.00 5.85 42.1 7.4
Abt Middle wall Cum 2 0.20 12.00 5.85 28.1
Abutment side (Rear & Mid) Cum 4 2.350 0.30 5.846 16.5
Abutment side (Below Cap) Cum 4 2.350 0.30 5.50 15.5
Abutment side (From Cap) Cum 4 1.680 0.30 0.35 0.7
Abt intermdiate wall (Rear & Mid) Cum 6 2.350 0.20 5.85 16.5
Abt intermdiate wall (Front up to soffit) Cum 6 2.350 0.20 4.92 13.9
Abt intermdiate wall (Front Abave soffit) Cum 6 2.720 0.20 0.35 1.1
Abut. Cap Cum 2 0.30 12.00 0.50 3.6
Overhang Cap Rect. Portion Cum 2 1.34 12.00 0.50 16.1
Overhang Cap Traingular Portion Cum 0 0.00 12.00 0.0
Box Abt Dirt wall Cum 2 0.30 12.00 0.35 2.5
For Retaining Wall Cum 0 0.00 0.00 0.00 0.0
Pier stem rectangle Cum -1 0.80 8.00 6.17 -39.5
Pier stem perabola Cum -1 0.53 6.17 -3.3
Pier Cap Lower Rect Portion Cum -1 1.20 8.00 0.50 -4.8
Pier Cap Triangular Portion Cum -2 1.20 1.50 0.50 -0.9
Pier Cap Upper Rect Portion Cum -1 1.20 12.00 0.50 -7.2
Bracket Rect portion Cum 0 0.30 12.00 0.30 0.0
Bracket Triangular portion Cum 0 0.30 12.00 0.30 0.0
Return Wall Cum 0 0.60 4.20 4.82 0.0
Total 0 0.0
0 RCC M-40 for Sub-Structure
Pedestal Cum 0 0.00 0.00 0.00 0.0
Total 0.0
0 RCC M 30 Super Structure
Box Type Slab
Cum 0 5.00 0.0
Cum 0 0.00 11.18 0.0
Solid slab Cum 0 0.00 12.00 0.650 0.0
Solid slab II Cum 0 0.00 12.00 0.650 0.0
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
Solid slab III Cum 0 0.00 12.00 0.650 0.0
Camber of Solid slab Cum 0 0.00 6.00 0.075 0.0
Camber of Solid slab II Cum 0 0.00 6.00 0.075 0.0
Camber of Solid slab III Cum 0 0.00 6.00 0.075 0.0
Abut Box top Slab Cum 2 6.17 12.00 0.30 44.4
Total 0 0.0
0 Crash Barrier (M-40) for Super Structure
Crash barrier Concrete Cum 0 1.34 0.310 0.0
Total 0.0
0 Concrete in Superstructure M 35 (RCC/PSC)
M-30 for Rcc Longitudnal Girder Cum 0 - - - 0.0
M-30 for Rcc Cross Girder Cum - - - - 0.0
M-30 for Rcc Longitudnal Girder Cum 0 - - - 0.0
M-30 for Rcc Cross Girder Cum - - - - 0.0
M-30 for Rcc Longitudnal Girder Cum 0 - - - 0.0
M-30 for Rcc Cross Girder Cum - - - - 0.0
Total 0.0
0 PCC M-15 for Approach slab
Approach slab Cum 0 3.50 12.00 0.15 0.0
Total 0 0.0
0 RCC M-30 for Approach slab
Approach slab Cum 0 3.50 12.00 0.30 0.0
Total 0 0.0
0 Reinforcement (HYSD Bars)
Foundation
For abutment 100.00 52.80 5.3
For Pier 100.00 -38.50 -3.9
For retaining wall 100.00 0.00 0.0
Total Mt 100.00 0 - - 0.0 0.0
Sub structure
For abutment 110.00 192 21.1
For Pier 110.00 -56 -6.1
For retaining wall 110.00 0 0.0
For Return Wall 110.00 0 0.0
Total Mt 110.00 0 - - 0.0 0.0
Solid slab Mt 120.00 0 - - 0.0 0.0
For Rcc Girder120 kg / cum conc. Mt 120 0 - - 0.0 0.0
RCC Approch slab @ 0kg/cum conc. Mt 0 0.0 - - 0.0 0.0
RCC Crash Barrier @ 150 kg/cum conc. Mt 150 0.0 - - 0.0 0.0
Total 0 0.0
0 High tensile steel wire
Tensoning wire for Psc Girder Mt 0 0.00 0.0
Total 0.0
0 Crash Barrier
Crash barrier RCC Rm 2 0.00 - - 0.0
Total 0.0
0 RCC Railing
Railing RCC 0 7.00 - - 0.0
Total 0 0.0
0 Tar Paper Bearing
Tar Paper Bearing Sqm 0 0.00 0.40 - 0.0
Total 0.0
0 Elastomeric Bearing
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
Elastomeric Bearing Cu cm 0 0.000 0.000 0.000 0.0
Total 0.0
0 Pot PTFE Bearing
Pot PTFE Bearing Tonne 0 100.00 - - 0.0
Total 0.0
0 Filler joint 20mm thick Expansion joint
Filler joint 20mm thick Expansion joint Rm 1 - 12.00 - 12.0
Total 0.0
0 Strip seal Expansion joint
Strip seal Expansion joint Rm 0 - 12.00 - 0.0
Total 0.0
0 Concrete Wearing coat M 30
Above Solid slab Cum 1 0.00 12.00 0.075 0.0
Total 0 0.0
0 Filter media :
Behind Abutment on Face wall Cum 8 2.70 0.60 0.62 0.0
Behind Abutment on Side wall (Front side) Cum 2 2.35 0.60 0.62 0.0
Behind Abutment on Side wall (Rear & Mid side) Cum 4 2.35 0.60 0.62 0.0
Behind Retaining wall Cum 0 0.00 0.00 0.00 0.0
Behind Return wall Cum 0 4.20 0.00 0.62 0.0
Total 0 0.0
0 Drainage spout

Drainage spout I No. 2 0 0.0


Drainage spout II No. 0 0 0.0
Drainage spout III No. 0 0 0.0
Total 0 0.0
Weep holes
0
Behind Abutment on Face wall Cum 8 1.70 0.30 0.62 3.0
Behind Abutment on Side wall Front side Cum 8 1.70 0.62 8.0
Behind Abutment on Side wall Rear & Mid side Cum 8 2.35 0.62 12.0
Behind Retaining wall Cum 0 0.00 0.00 0.00 0.0
Behind Return wall Cum 0 4.20 0.60 0.62 0.0
Total 0 0
0 Granular Back fill
Abutment Front Cell (below Cap) Cum 8 2.35 2.70 5.00 253.6
Abutment Front Cell (Above Cap) Cum 8 1.680 2.70 0.85 30.8
Abutment Rear and Mid Cell Cum 8 2.35 2.70 5.85 296.7
Granular Back fill behind abutment Cum 0 0.98 10.80 0.0
Total 0.0
0 Stone Pitching
Stone Pitching Cum 1 28.92 0.30 8.7
Total 0.00
0 Filter media beneath pitching
Filter media beneath pitching Cum 1 28.92 0.15 4.3
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
Total 0.00
0 Dismentaling
For PCC
headwall Cum 2 14.50 1.25 2.20 79.8
b-pier Cum 0 1.50 7.50 0.15 0.0
Total 0.00
For RCC
a-Slab Cum 0 7 7.50 0.60 0.0
b-pier Cum 0 2.00 5.50 6.00 0.0
c-footing Pier & Abutment Cum 0 2.00 5.50 1.50 0.0
BOX Cum
Total 0.00
Rubble Stone masonry with lime mortar Cum 0.0
Total 0.0
Rubble Stone masonry with Cement mortar Cum 0 0.80 7.50 1.50 0.0
Total 0.0
For Pipe
a- Up to 1200 mm dia Rm 5 7.50
Total 0.0
b-600 to 900 mm dia Rm 0.0
Total 0.0
c-Above 900 mm dia Rm 0.0
Total 0.0
for concrete railling Rm 0 100.00 0.0
Total ` 0.0

20 Diversion

Earthwork in Excavation of foundations for


structures complete as per Technical
Specifications Clause 304 and 2903 including all
leads and lifts.
Earthwork including
For Pipe bedding 1 4.70 5.92 2.05 57.0
Flooring U/s 1 12.50 1.50 0.30 5.6
Deduction -2 1.77 0.30 -1.1
Flooring D/s 1 12.50 3.00 0.30 11.3
Deduction -2 5.47 0.30 -3.3
For head wall 0 12.65 1.40 0.80 0.0
cum total 69.6

Providing PCC / RCC in open foundations


complete excluding reinforcement as per
drawings and Technical Specifications
M-15 grade in levelling course
Below Headwall cum 2 12.50 1.40 0.15 5.3

Providing PCC M 20 in Head wall,curtain wall


complete excluding reinforcement as per
drawings and Technical Specifications
M-20 grade
For Head Wall cum 1 12.50 0.83 2.69 27.7
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
Deduction for pipe (Area of Pipe) cum 1 0.83 4.89 4.0
total 31.8
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.

Providing and laying Granular bed for RCC pipes


in culverts with all lifts and leads complete as per
Technical Specification Clause 2904.
M-15 grade
Below Pipe cum 1 4.70 5.92 0.55 15.3
Deduction cum -1 4.70 0.25 -1.2
cum total 14.1

Providing , laying and jointing NP4 (as per IS:458)


Hume pipes for culverts, complete as per
Technical Specification Section 2900 and IRC
Special Publication No.13.
FOR 2 ROW
Φ 1200 m 7.50 7.5
Φ 1000
Φ 900

Construction of embankment/ subgrade/


earthen shoulders with approved material
obtained from borrow pits with all lifts & leads
including excavation, transporting to site, 1 52.50 7.50 0.30 118.1
spreading, grading to required slope and
compacted to meet requirement of table No.
300-2 and as per relevant clauses of section-
300. cum

Construction of granular sub-base by providing


coarse graded material, spreading in
uniform layers with on prepared surface, .
mixing by mix in place method at OMC, and
compacting with vibratory roller to achieve
the desired density, complete in all respect
and as per relevant clauses of section-400.
for grading- I Material cum
for grading- II Material cum 1 52.50 7.50 0.15 59.1
for grading-III Material cum
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Newconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
0 Taking, exploratory boring

Upto 1.0 m below bed level Metre 4 1 4.0


TOTAL 0.0
Beyond 1.0 m depth upto 5.0 m Metre 4 4 16.0
TOTAL 0.0
Beyond 5.0 m depth Metre 4 10 40.0
TOTAL 0.0
0 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-750 mm)
For Abutment Metre 0 0 0.0
For Pier Metre 0 0 0.0
For Retaining Wall Metre 0 0 0.0
TOTAL 0.0
0 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-1000 mm)
For Abutment Metre 0 0 0.0
For Pier Metre 0 0 0.0
For Retaining Wall Metre 0 15 0.0
TOTAL 0.0
0 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-1200 mm)
For Abutment Metre 0 25 0.0
For Pier Metre 0 25 0.0
For Retaining Wall Metre 0 0 0.0
TOTAL 0.0
0 Driven cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-750 mm)
For Abutment Metre 0 0 0.0
For Pier Metre 0 0 0.0
For Retaining Wall Metre 0 0 0.0
TOTAL 0.0
0 Driven cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-1000 mm)
For Abutment Metre 0 0 0.0
For Pier Metre 0 0 0.0
For Retaining Wall Metre 0 15 0.0
TOTAL 0.0
0 Driven cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-1200 mm)
For Abutment Metre 0 25 0.0
For Pier Metre 0 25 0.0
For Retaining Wall Metre 0 0 0.0
TOTAL 0.0
0 Pile load test on single vertical pile in accordance with IS:2911(Part-IV)
For Abutment tonne 0.0
For Pier tonne 0.0
For Retaining Wall tonne 0.0
TOTAL 0.0
0 Excavation on Soil
up to 3 Mtr. Depth
For Abutment Foundation Cum 2 7.80 12.30 1.80 345.4
For Pier Foundation Cum -1 8.30 10.30 1.80 -153.9
For Retaining Wall Foundation Cum 0 0.00 0.00 1.29 0.0
For Toe Wall Cum 1 24.37 1.70 1.11 46.0
TOTAL 0 0.0
3 Mtr. To 6 Mtr. Depth
For Abutment Foundation Cum 2 7.80 12.30 1.8 345.4
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Newconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
For Pier Foundation Cum -1 8.30 10.30 1.34 -114.5
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 24.37 1.70 0.00 0.0
TOTAL 0.0
Above 6 Mtr. Depth
For Abutment Foundation Cum 2 7.80 12.30 0.16 30.0
For Pier Foundation Cum -1 8.30 10.30 0.00 0.0
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 24.37 1.70 0.00 0.0
TOTAL 0.0

0 Excavation on Ordinary Rock


up to 3 Mtr. Depth
For Abutment Foundation Cum 2 7.80 12.30 1.20 230.3
For Pier Foundation Cum -1 8.30 10.30 1.20 -102.6
For Retaining Wall Foundation Cum 0 0.00 0.00 0.86 0.0
For Toe Wall Cum 1 24.37 1.70 0.74 30.7
TOTAL 0.0
3 Mtr. To 6 Mtr. Depth
For Abutment Foundation Cum 2 7.80 12.30 1.20 230.3
For Pier Foundation Cum -1 8.30 10.30 0.89 -76.3
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 24.37 1.70 0.00 0.0
TOTAL 0.0
Above 6 Mtr. Depth
For Abutment Foundation Cum 2 7.80 12.30 0.10 20.0
For Pier Foundation Cum -1 8.30 10.30 0.00 0.0
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 24.37 1.70 0.00 0.0
TOTAL 0.0

0 PCC M-15 for Leveling course


For Abutment Foundation Cum 2 7.80 12.30 0.15 28.8
For Pier Foundation Cum -1 8.15 10.15 0.15 -12.4
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 24.22 1.55 0.15 5.6
TOTAL 0 0.0
0 Leveling course for Pile cap PCC in M-15 below Pile cap
For Abutment Pile Fondation Cum 2 7.80 12.15 0.15 0.0
For Pier Pile Fondation Cum -1 8.15 10.15 0.15 0.0
For Retaining wall Pile Fondation Cum 0 0.00 0.00 0.00 0.0
0.0
0 RCC M-30 for Foundation
For Wall type Abutment Foundation Cum 0 8.70 12.00 0.50 0.0
For Abt TOE Triangular Portion Cum 0 4.20 12.00 1.00 0.0
For Abt HEEL Triangular Portion Cum 0 4.20 12.00 1.00 0.0
For Abt Upper Rectangular Portion Cum 0 0.30 12.00 1.00 0.0
TOTAL 0.0
0 RCC M-30 for Foundation
For Box Type Abutment Cum 2 6.50 12.00 0.30 46.8
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Newconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
For Box Type Abt TOE Cum 2 1.00 12.00 0.55 13.2
Pier Foundation Lower Rectangular Portion Cum -1 8.00 10.00 0.60 -48.0
Pier Foundation Upper Rectangular Portion Cum -1 1.40 10.00 0.40 -5.6
Pier Foundation Triangular Portion Cum -2 3.30 10.00 0.40 -13.2
Pier Footing (Square) Cum 0 8-10 1.4-1.4 0.40 0.00
For Retaining Wall Lower Rect Portion Cum 0 0.00 0.00 0.00 0.0
Retaining Wall Upper Rect Portion Cum 0 0.00 0.00 0.00 0.0
Retaining Wall Toe Portion Cum 0 0.00 0.00 0.00 0.0
Retaining Wall Heel Portion Cum 0 0.00 0.00 0.00 0.0
TOTAL 0 0.0
0 RCC M-30 in Pile Cap
For Wall Type Abutment Pile Cap Foundation Cum 0 8.70 12.00 1.80 0.0
TOTAL 0.0
0 RCC M-30 in Pile Cap
For Box Type Abutment Pile Foundation Cum 2 7.50 12.00 1.80 0.0
Pier Pile Cap Cum -1 5.10 8.70 1.80 0.0
Retaining Wall Pile Cap Cum 0 0.00 0.00 0.00 0.0
TOTAL 0.0
0 PCC M 20 Toe wall
Toe wall Rectangular Portion Cum 1 24.07 1.40 0.20 6.7
Toe wall Upper Rect Portion Cum 1 24.07 0.30 1.50 10.8
Toe wall Triangular Portion Cum 1 24.07 0.50 1.50 9.0
Total 0 0.0
0 RCC M-30 for Sub-Structure
Abt Front Wall Cum 2 0.30 12.00 7.04 50.7 6.38
Abt Rear Wall Cum 2 0.30 12.00 8.22 59.2 7.4
Abt Middle wall Cum 2 0.20 12.00 8.22 39.4
Abutment side (Rear & Mid) Cum 4 2.850 0.30 8.216 28.1
Abutment side (Below Cap) Cum 4 2.850 0.30 7.62 26.0
Abutment side (From Cap) Cum 4 2.180 0.30 0.60 1.6
Abt intermdiate wall (Rear & Mid) Cum 6 2.850 0.20 8.22 28.1
Abt intermdiate wall (Front up to soffit) Cum 6 2.850 0.20 7.04 24.1
Abt intermdiate wall (Front Abave soffit) Cum 6 3.120 0.20 0.60 2.2
Abut. Cap Cum 2 0.30 12.00 0.50 3.6
Overhang Cap Rect. Portion Cum 2 1.34 12.00 0.50 16.1
Overhang Cap Traingular Portion Cum 0 0.00 12.00 0.0
Box Abt Dirt wall Cum 2 0.30 12.00 0.60 4.3
For Retaining Wall Cum 0 0.00 0.00 0.00 0.0
Pier stem rectangle Cum -1 1.20 8.00 8.57 -82.2
Pier stem perabola Cum -1 0.80 8.57 -6.9
Pier Cap Lower Rect Portion Cum -1 1.80 8.00 0.75 -10.8
Pier Cap Triangular Portion Cum -2 1.80 1.50 0.75 -2.0
Pier Cap Upper Rect Portion Cum -1 1.80 12.00 0.75 -16.2
Bracket Rect portion Cum 0 0.30 12.00 0.30 0.0
Bracket Triangular portion Cum 0 0.30 12.00 0.30 0.0
Return Wall Cum 0 0.60 4.20 7.19 0.0
Total 0 0.0
0 RCC M-40 for Sub-Structure
Pedestal Cum 0 0.00 0.00 0.00 0.0
Total 0.0
0 RCC M 30 Super Structure
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Newconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
Box Type Slab
Cum 0 5.00 0.0
Cum 0 0.00 11.18 0.0
Solid slab Cum 0 0.00 12.00 0.900 0.0
Solid slab II Cum 0 0.00 12.00 0.900 0.0
Solid slab III Cum 0 0.00 12.00 0.900 0.0
Camber of Solid slab Cum 0 0.00 6.00 0.075 0.0
Camber of Solid slab II Cum 0 0.00 6.00 0.075 0.0
Camber of Solid slab III Cum 0 0.00 6.00 0.075 0.0
Abut Box top Slab Cum 2 7.17 12.00 0.30 51.6
Total 0 0.0
0 Crash Barrier (M-40) for Super Structure
Crash barrier Concrete Cum 0 4.01 0.310 0.0
Total 0.0
0 Concrete in Superstructure M 35 (RCC/PSC)
M-30 for Rcc Longitudnal Girder Cum 0 - - - 0.0
M-30 for Rcc Cross Girder Cum - - - - 0.0
M-30 for Rcc Longitudnal Girder Cum 0 - - - 0.0
M-30 for Rcc Cross Girder Cum - - - - 0.0
M-30 for Rcc Longitudnal Girder Cum 0 - - - 0.0
M-30 for Rcc Cross Girder Cum - - - - 0.0
Total 0.0
0 PCC M-15 for Approach slab
Approach slab Cum 0 3.50 12.00 0.15 0.0
Total 0 0.0
0 RCC M-30 for Approach slab
Approach slab Cum 0 3.50 12.00 0.30 0.0
Total 0 0.0
0 Reinforcement (HYSD Bars)
Foundation
For abutment 100.00 60.00 6.0
For Pier 100.00 -66.80 -6.7
For retaining wall 100.00 0.00 0.0
Total Mt 100.00 0 - - 0.0 0.0
Sub structure
For abutment 110.00 283 31.2
For Pier 110.00 -118 -13.0
For retaining wall 110.00 0 0.0
For Return Wall 110.00 0 0.0
Total Mt 110.00 0 - - 0.0 0.0
Solid slab Mt 120.00 0 - - 0.0 0.0
For Rcc Girder120 kg / cum conc. Mt 120 0 - - 0.0 0.0
RCC Approch slab @ 0kg/cum conc. Mt 0 0.0 - - 0.0 0.0
RCC Crash Barrier @ 150 kg/cum conc. Mt 150 0.0 - - 0.0 0.0
Total 0 0.0
0 High tensile steel wire
Tensoning wire for Psc Girder Mt 0 0.00 0.0
Total 0.0
0 Crash Barrier
Crash barrier RCC Rm 2 0.00 - - 0.0
Total 0.0
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Newconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
0 RCC Railing
Railing RCC 0 7.00 - - 0.0
Total 0 0.0
0 Tar Paper Bearing
Tar Paper Bearing Sqm 0 0.00 0.60 - 0.0
Total 0.0
0 Elastomeric Bearing
Elastomeric Bearing Cu cm 0 0.000 0.000 0.000 0.0
Total 0.0
0 Pot PTFE Bearing
Pot PTFE Bearing Tonne 0 100.00 - - 0.0
Total 0.0
0 Filler joint 20mm thick Expansion joint
Filler joint 20mm thick Expansion joint Rm 1 - 12.00 - 12.0
Total 0.0
0 Strip seal Expansion joint
Strip seal Expansion joint Rm 0 - 12.00 - 0.0
Total 0.0
0 Concrete Wearing coat M 30
Above Solid slab Cum 1 0.00 12.00 0.075 0.0
Total 0 0.0
0 Filter media :
Behind Abutment on Face wall Cum 8 2.70 0.60 1.08 0.0
Behind Abutment on Side wall (Front side) Cum 2 2.85 0.60 1.08 0.0
Behind Abutment on Side wall (Rear & Mid side) Cum 4 2.85 0.60 1.08 0.0
Behind Retaining wall Cum 0 0.00 0.00 0.00 0.0
Behind Return wall Cum 0 4.20 0.00 1.08 0.0
Total 0 0.0
0 Drainage spout

Drainage spout I No. 2 0 0.0


Drainage spout II No. 0 0 0.0
Drainage spout III No. 0 0 0.0
Total 0 0.0
0 Weep holes
Behind Abutment on Face wall Cum 8 1.70 0.30 1.08 4.0
Behind Abutment on Side wall Front side Cum 8 1.70 1.08 15.0
Behind Abutment on Side wall Rear & Mid side Cum 8 2.85 1.08 25.0
Behind Retaining wall Cum 0 0.00 0.00 0.00 0.0
Behind Return wall Cum 0 4.20 0.60 1.08 0.0
Total 0 0
0 Granular Back fill
Abutment Front Cell (below Cap) Cum 8 2.85 2.70 7.12 438.1
Abutment Front Cell (Above Cap) Cum 8 2.180 2.70 1.10 51.8
Abutment Rear and Mid Cell Cum 8 2.85 2.70 8.22 505.8
Granular Back fill behind abutment Cum 0 1.88 10.80 0.0
Total 0.0
0 Stone Pitching
Stone Pitching Cum 1 55.46 0.30 16.6
Total 0.00
0 Filter media beneath pitching
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Newconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
Filter media beneath pitching Cum 1 55.46 0.15 8.3
Total 0.00
0 Dismentaling
For PCC
headwall Cum 2 35.00 1.25 1.50 131.3
b-pier Cum 0 1.50 7.50 0.15 0.0
Total 0.00
For RCC
a-Slab Cum 0 7 7.50 0.60 0.0
b-pier Cum 0 2.00 5.50 6.00 0.0
c-footing Pier & Abutment Cum 0 2.00 5.50 1.50 0.0
BOX Cum
Total 0.00
Rubble Stone masonry with lime mortar Cum 0.0
Total 0.0
Rubble Stone masonry with Cement mortar Cum 0 0.80 7.50 1.50 0.0
Total 0.0
For Pipe
a- Up to 1200 mm dia Rm 7.5
Total 0.0
b-600 to 900 mm dia Rm 0.0

Total
0.0
c-Above 900 mm dia Rm 0.0
Total 0.0
for concrete railling Rm 0 100.00 0.0
Total ` 0.0

20 Diversion

Earthwork in Excavation of foundations for


structures complete as per Technical
Specifications Clause 304 and 2903 including all
leads and lifts.
Earthwork including
For Pipe bedding 1 4.70 5.92 2.05 57.0
Flooring U/s 1 0.30 1.50 0.30 0.1
Deduction -2 1.77 0.30 -1.1
Flooring D/s 1 0.30 3.00 0.30 0.3
Deduction -2 5.47 0.30 -3.3
For head wall 0 0.45 1.40 0.80 0.0
cum total 0.0

Providing PCC / RCC in open foundations


complete excluding reinforcement as per
drawings and Technical Specifications
M-15 grade in levelling course
Below Headwall cum 2 0.30 1.40 0.15 0.0
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Newconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
Providing PCC M 20 in Head wall,curtain wall
complete excluding reinforcement as per
drawings and Technical Specifications
M-20 grade
For Head Wall cum 1 0.30 0.83 2.69 0.7
Deduction for pipe (Area of Pipe) cum 1 0.83 4.89 4.0
Providing and laying Granular bed for RCC pipes total 0.0
in culverts with all lifts and leads complete as per
Technical Specification Clause 2904.
M-15 grade
Below Pipe cum 1 4.70 5.92 0.55 15.3
Deduction cum -1 4.70 0.25 -1.2
cum total 0.0

Providing , laying and jointing NP4 (as per IS:458)


Hume pipes for culverts, complete as per
Technical Specification Section 2900 and IRC
Special Publication No.13.
FOR 2 ROW
Φ 1200 m 7.50 0.0
Φ 1000
Φ 900

Construction of embankment/ subgrade/


earthen shoulders with approved material
obtained from borrow pits with all lifts & leads
including excavation, transporting to site, 1 55.30 7.50 0.30 0.0
spreading, grading to required slope and
compacted to meet requirement of table No.
300-2 and as per relevant clauses of section-
300. cum

Construction of granular sub-base by providing


coarse graded material, spreading in
uniform layers with on prepared surface, .
mixing by mix in place method at OMC, and
compacting with vibratory roller to achieve
the desired density, complete in all respect
and as per relevant clauses of section-400.
for grading- I Material cum
for grading- II Material cum 1 55.30 7.50 0.15 0.0
for grading-III Material cum
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
0 Taking, exploratory boring

Upto 1.0 m below bed level Metre 2 1 2.0


TOTAL 0.0
Beyond 1.0 m depth upto 5.0 m Metre 2 4 8.0
TOTAL 0.0
Beyond 5.0 m depth Metre 2 10 20.0
TOTAL 0.0
0 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-750 mm)
For Abutment Metre 0 0 0.0
For Pier Metre 0 0 0.0
For Retaining Wall Metre 0 0 0.0
TOTAL 0.0
0 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-1000 mm)
For Abutment Metre 0 0 0.0
For Pier Metre 0 0 0.0
For Retaining Wall Metre 0 15 0.0
TOTAL 0.0
0 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-1200 mm)
For Abutment Metre 0 25 0.0
For Pier Metre 0 25 0.0
For Retaining Wall Metre 0 0 0.0
TOTAL 0.0
0 Driven cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-750 mm)
For Abutment Metre 0 0 0.0
For Pier Metre 0 0 0.0
For Retaining Wall Metre 0 0 0.0
TOTAL 0.0
0 Driven cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-1000 mm)
For Abutment Metre 0 0 0.0
For Pier Metre 0 0 0.0
For Retaining Wall Metre 0 15 0.0
TOTAL 0.0
0 Driven cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-1200 mm)
For Abutment Metre 0 25 0.0
For Pier Metre 0 25 0.0
For Retaining Wall Metre 0 0 0.0
TOTAL 0.0
0 Pile load test on single vertical pile in accordance with IS:2911(Part-IV)
For Abutment tonne 0.0
For Pier tonne 0.0
For Retaining Wall tonne 0.0
TOTAL 0.0
0 Excavation on Soil
up to 3 Mtr. Depth
For Abutment Foundation Cum 2 6.80 12.30 1.80 301.1
For Pier Foundation Cum -1 5.30 10.30 1.80 -98.3
For Retaining Wall Foundation Cum 0 0.00 0.00 1.29 0.0
For Toe Wall Cum 1 27.67 1.70 1.11 52.2
TOTAL 0 0.0
3 Mtr. To 6 Mtr. Depth
For Abutment Foundation Cum 2 6.80 12.30 1.4 228.3
For Pier Foundation Cum -1 5.30 10.30 0.96 -52.1
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 27.67 1.70 0.00 0.0
TOTAL 0.0
Above 6 Mtr. Depth
For Abutment Foundation Cum 2 6.80 12.30 0.00 0.0
For Pier Foundation Cum -1 5.30 10.30 0.00 0.0
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 27.67 1.70 0.00 0.0
TOTAL 0.0

0 Excavation on Ordinary Rock


up to 3 Mtr. Depth
For Abutment Foundation Cum 2 6.80 12.30 1.20 200.7
For Pier Foundation Cum -1 5.30 10.30 1.20 -65.5
For Retaining Wall Foundation Cum 0 0.00 0.00 0.86 0.0
For Toe Wall Cum 1 27.67 1.70 0.74 34.8
TOTAL 0.0
3 Mtr. To 6 Mtr. Depth
For Abutment Foundation Cum 2 6.80 12.30 0.91 152.2
For Pier Foundation Cum -1 5.30 10.30 0.64 -34.8
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 27.67 1.70 0.00 0.0
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
TOTAL 0.0
Above 6 Mtr. Depth
For Abutment Foundation Cum 2 6.80 12.30 0.00 0.0
For Pier Foundation Cum -1 5.30 10.30 0.00 0.0
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 27.67 1.70 0.00 0.0
TOTAL 0.0

0 PCC M-15 for Leveling course


For Abutment Foundation Cum 2 6.80 12.30 0.15 25.1
For Pier Foundation Cum -1 5.15 10.15 0.15 -7.8
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 27.52 1.55 0.15 6.4
TOTAL 0 0.0
0 Leveling course for Pile cap PCC in M-15 below Pile cap
For Abutment Pile Fondation Cum 2 6.80 12.15 0.15 0.0
For Pier Pile Fondation Cum -1 5.15 10.15 0.15 0.0
For Retaining wall Pile Fondation Cum 0 0.00 0.00 0.00 0.0
0.0
0 RCC M-30 for Foundation
For Wall type Abutment Foundation Cum 0 8.70 12.00 0.50 0.0
For Abt TOE Triangular Portion Cum 0 4.20 12.00 1.00 0.0
For Abt HEEL Triangular Portion Cum 0 4.20 12.00 1.00 0.0
For Abt Upper Rectangular Portion Cum 0 0.30 12.00 1.00 0.0
TOTAL 0.0
0 RCC M-30 for Foundation
For Box Type Abutment Cum 2 5.50 12.00 0.30 39.6
For Box Type Abt TOE Cum 2 1.00 12.00 0.55 13.2
Pier Foundation Lower Rectangular Portion Cum -1 5.00 10.00 0.50 -25.0
Pier Foundation Upper Rectangular Portion Cum -1 1.20 10.00 0.45 -5.4
Pier Foundation Triangular Portion Cum -2 1.90 10.00 0.45 -8.6
Pier Footing (Square) Cum 0 5-10 1.2-1.2 0.45 0.00
For Retaining Wall Lower Rect Portion Cum 0 0.00 0.00 0.00 0.0
Retaining Wall Upper Rect Portion Cum 0 0.00 0.00 0.00 0.0
Retaining Wall Toe Portion Cum 0 0.00 0.00 0.00 0.0
Retaining Wall Heel Portion Cum 0 0.00 0.00 0.00 0.0
TOTAL 0 0.0
0 RCC M-30 in Pile Cap
For Wall Type Abutment Pile Cap Foundation Cum 0 8.70 12.00 1.80 0.0
TOTAL 0.0
0 RCC M-30 in Pile Cap
For Box Type Abutment Pile Foundation Cum 2 6.50 12.00 1.80 0.0
Pier Pile Cap Cum -1 5.10 8.70 1.80 0.0
Retaining Wall Pile Cap Cum 0 0.00 0.00 0.00 0.0
TOTAL 0.0
0 PCC M 20 Toe wall
Toe wall Rectangular Portion Cum 1 27.37 1.40 0.20 7.7
Toe wall Upper Rect Portion Cum 1 27.37 0.30 1.50 12.3
Toe wall Triangular Portion Cum 1 27.37 0.50 1.50 10.3
Total 0 0.0
0 RCC M-30 for Sub-Structure
Abt Front Wall Cum 2 0.30 12.00 6.56 47.2 6.38
Abt Rear Wall Cum 2 0.30 12.00 7.58 54.6 7.4
Abt Middle wall Cum 2 0.20 12.00 7.58 36.4
Abutment side (Rear & Mid) Cum 4 2.350 0.30 7.580 21.4
Abutment side (Below Cap) Cum 4 2.350 0.30 7.13 20.1
Abutment side (From Cap) Cum 4 1.680 0.30 0.45 0.9
Abt intermdiate wall (Rear & Mid) Cum 6 2.350 0.20 7.58 21.4
Abt intermdiate wall (Front up to soffit) Cum 6 2.350 0.20 6.56 18.5
Abt intermdiate wall (Front Abave soffit) Cum 6 2.720 0.20 0.45 1.5
Abut. Cap Cum 2 0.30 12.00 0.50 3.6
Overhang Cap Rect. Portion Cum 2 1.34 12.00 0.50 16.1
Overhang Cap Traingular Portion Cum 0 0.00 12.00 0.0
Box Abt Dirt wall Cum 2 0.30 12.00 0.45 3.2
For Retaining Wall Cum 0 0.00 0.00 0.00 0.0
Pier stem rectangle Cum -1 1.00 8.00 8.17 -65.3
Pier stem perabola Cum -1 0.67 8.17 -5.4
Pier Cap Lower Rect Portion Cum -1 1.40 8.00 0.50 -5.6
Pier Cap Triangular Portion Cum -2 1.40 1.50 0.50 -1.1
Pier Cap Upper Rect Portion Cum -1 1.40 12.00 0.50 -8.4
Bracket Rect portion Cum 0 0.30 12.00 0.30 0.0
Bracket Triangular portion Cum 0 0.30 12.00 0.30 0.0
Return Wall Cum 0 0.60 4.20 6.56 0.0
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
Total 0 0.0
0 RCC M-40 for Sub-Structure
Pedestal Cum 0 0.00 0.00 0.00 0.0
Total 0.0
0 RCC M 30 Super Structure
Box Type Slab
Cum 0 5.00 0.0
Cum 0 0.00 11.18 0.0
Solid slab Cum 0 0.00 12.00 0.750 0.0
Solid slab II Cum 0 0.00 12.00 0.750 0.0
Solid slab III Cum 0 0.00 12.00 0.750 0.0
Camber of Solid slab Cum 0 0.00 6.00 0.075 0.0
Camber of Solid slab II Cum 0 0.00 6.00 0.075 0.0
Camber of Solid slab III Cum 0 0.00 6.00 0.075 0.0
Abut Box top Slab Cum 2 6.17 12.00 0.30 44.4
Total 0 0.0
0 Crash Barrier (M-40) for Super Structure
Crash barrier Concrete Cum 0 3.05 0.310 0.0
Total 0.0
0 Concrete in Superstructure M 35 (RCC/PSC)
M-30 for Rcc Longitudnal Girder Cum 0 - - - 0.0
M-30 for Rcc Cross Girder Cum - - - - 0.0
M-30 for Rcc Longitudnal Girder Cum 0 - - - 0.0
M-30 for Rcc Cross Girder Cum - - - - 0.0
M-30 for Rcc Longitudnal Girder Cum 0 - - - 0.0
M-30 for Rcc Cross Girder Cum - - - - 0.0
Total 0.0
0 PCC M-15 for Approach slab
Approach slab Cum 0 3.50 12.00 0.15 0.0
Total 0 0.0
0 RCC M-30 for Approach slab
Approach slab Cum 0 3.50 12.00 0.30 0.0
Total 0 0.0
0 Reinforcement (HYSD Bars)
Foundation
For abutment 100.00 52.80 5.3
For Pier 100.00 -38.95 -3.9
For retaining wall 100.00 0.00 0.0
Total Mt 100.00 0 - - 0.0 0.0
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
Sub structure
For abutment 110.00 245 26.9
For Pier 110.00 -86 -9.4
For retaining wall 110.00 0 0.0
For Return Wall 110.00 0 0.0
Total Mt 110.00 0 - - 0.0 0.0
Solid slab Mt 120.00 0 - - 0.0 0.0
For Rcc Girder120 kg / cum conc. Mt 120 0 - - 0.0 0.0
RCC Approch slab @ 0kg/cum conc. Mt 0 0.0 - - 0.0 0.0
RCC Crash Barrier @ 150 kg/cum conc. Mt 150 0.0 - - 0.0 0.0
Total 0 0.0
0 High tensile steel wire
Tensoning wire for Psc Girder Mt 0 0.00 0.0
Total 0.0
0 Crash Barrier
Crash barrier RCC Rm 2 0.00 - - 0.0
Total 0.0
0 RCC Railing
Railing RCC 0 7.00 - - 0.0
Total 0 0.0
0 Tar Paper Bearing
Tar Paper Bearing Sqm 0 0.00 0.50 - 0.0
Total 0.0
0 Elastomeric Bearing
Elastomeric Bearing Cu cm 0 0.000 0.000 0.000 0.0
Total 0.0
0 Pot PTFE Bearing
Pot PTFE Bearing Tonne 0 100.00 - - 0.0
Total 0.0
0 Filler joint 20mm thick Expansion joint
Filler joint 20mm thick Expansion joint Rm 1 - 12.00 - 12.0
Total 0.0
0 Strip seal Expansion joint
Strip seal Expansion joint Rm 0 - 12.00 - 0.0
Total 0.0
0 Concrete Wearing coat M 30
Above Solid slab Cum 1 0.00 12.00 0.075 0.0
Total 0 0.0
0 Filter media :
Behind Abutment on Face wall Cum 8 2.70 0.60 1.58 0.0
Behind Abutment on Side wall (Front side) Cum 2 2.35 0.60 1.58 0.0
Behind Abutment on Side wall (Rear & Mid side) Cum 4 2.35 0.60 1.58 0.0
Behind Retaining wall Cum 0 0.00 0.00 0.00 0.0
Behind Return wall Cum 0 4.20 0.00 1.58 0.0
Total 0 0.0
0 Drainage spout

Drainage spout I No. 2 0 0.0


Drainage spout II No. 0 0 0.0
Drainage spout III No. 0 0 0.0
Total 0 0.0
0 Weep holes
Behind Abutment on Face wall Cum 8 1.70 0.30 1.58 6.0
Behind Abutment on Side wall Front side Cum 8 1.70 1.58 21.0
Behind Abutment on Side wall Rear & Mid side Cum 8 2.35 1.58 30.0
Behind Retaining wall Cum 0 0.00 0.00 0.00 0.0
Behind Return wall Cum 0 4.20 0.60 1.58 0.0
Total 0 0
0 Granular Back fill
Abutment Front Cell (below Cap) Cum 8 2.35 2.70 6.63 336.5
Abutment Front Cell (Above Cap) Cum 8 1.680 2.70 0.95 34.5
Abutment Rear and Mid Cell Cum 8 2.35 2.70 7.58 384.8
Granular Back fill behind abutment Cum 0 2.44 10.80 0.0
Total 0.0
0 Stone Pitching
Stone Pitching Cum 1 71.69 0.30 21.5
Total 0.00
0 Filter media beneath pitching
Filter media beneath pitching Cum 1 71.69 0.15 10.8
Total 0.00
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
0 Dismentaling
For PCC
headwall Cum 2 25.00 1.25 1.80 112.5
b-pier Cum 0 1.50 7.50 0.15 0.0
Total 0.00
For RCC
a-Slab Cum 0 7 7.50 0.60 0.0
b-pier Cum 0 2.00 5.50 6.00 0.0
c-footing Pier & Abutment Cum 0 2.00 5.50 1.50 0.0
BOX Cum
Total 0.00
Rubble Stone masonry with lime mortar Cum 0.0
Total 0.0
Rubble Stone masonry with Cement mortar Cum 0 0.80 7.50 1.50 0.0
Total 0.0
For Pipe
a- Up to 1200 mm dia Rm 7.5
Total 0.0
b-600 to 900 mm dia Rm 0.0
Total 0.0
c-Above 900 mm dia Rm 0.0
Total 0.0
for concrete railling Rm 0 100.00 0.0
Total ` 0.0

20 Diversion

Earthwork in Excavation of foundations for


structures complete as per Technical
Specifications Clause 304 and 2903 including all
leads and lifts.
Earthwork including
For Pipe bedding 1 4.70 5.92 2.05 57.0
Flooring U/s 1 12.50 1.50 0.30 5.6
Deduction -2 1.77 0.30 -1.1
Flooring D/s 1 12.50 3.00 0.30 11.3
Deduction -2 5.47 0.30 -3.3
For head wall 0 12.65 1.40 0.80 0.0
cum total 69.6

Providing PCC / RCC in open foundations


complete excluding reinforcement as per
drawings and Technical Specifications
M-15 grade in levelling course
Below Headwall cum 2 12.50 1.40 0.15 5.3

Providing PCC M 20 in Head wall,curtain wall


complete excluding reinforcement as per
drawings and Technical Specifications
M-20 grade
For Head Wall cum 1 12.50 0.83 2.69 27.7
Deduction for pipe (Area of Pipe) cum 1 0.83 4.89 4.0
Providing and laying Granular bed for RCC pipes total 31.8
in culverts with all lifts and leads complete as per
Technical Specification Clause 2904.
M-15 grade
Below Pipe cum 1 4.70 5.92 0.55 15.3
Deduction cum -1 4.70 0.25 -1.2
cum total 14.1

Providing , laying and jointing NP4 (as per IS:458)


Hume pipes for culverts, complete as per
Technical Specification Section 2900 and IRC
Special Publication No.13.
FOR 2 ROW
Φ 1200 m 7.50 7.5
Φ 1000
Φ 900
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.

Construction of embankment/ subgrade/


earthen shoulders with approved material
obtained from borrow pits with all lifts & leads
including excavation, transporting to site, 1 67.50 7.50 0.30 151.9
spreading, grading to required slope and
compacted to meet requirement of table No.
300-2 and as per relevant clauses of section-
300. cum

Construction of granular sub-base by providing


coarse graded material, spreading in
uniform layers with on prepared surface, .
mixing by mix in place method at OMC, and
compacting with vibratory roller to achieve
the desired density, complete in all respect
and as per relevant clauses of section-400.
for grading- I Material cum
for grading- II Material cum 1 67.50 7.50 0.15 75.9
for grading-III Material cum
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
0 Taking, exploratory boring

Upto 1.0 m below bed level Metre 4 1 4.0


TOTAL 0.0
Beyond 1.0 m depth upto 5.0 m Metre 4 4 16.0
TOTAL 0.0
Beyond 5.0 m depth Metre 4 10 40.0
TOTAL 0.0
0 Excavation on Soil
up to 3 Mtr. Depth
For Abutment Foundation Cum 2 12.40 12.30 1.80 549.1
For Pier Foundation Cum -1 8.30 10.30 1.80 -153.9
For Toe Wall Cum 1 27.27 1.70 1.11 51.5
TOTAL 0 0.0
3 Mtr. To 6 Mtr. Depth
For Abutment Foundation Cum 2 12.40 12.30 1.8 549.1
For Pier Foundation Cum -1 8.30 10.30 1.80 -153.9
TOTAL 0.0
Above 6 Mtr. Depth
For Abutment Foundation Cum 2 12.40 12.30 0.85 260.1
For Pier Foundation Cum -1 8.30 10.30 0.50 -42.6
TOTAL 0.0

0 Excavation on Ordinary Rock


up to 3 Mtr. Depth
For Abutment Foundation Cum 2 12.40 12.30 1.20 366.0
For Pier Foundation Cum -1 8.30 10.30 1.20 -102.6
For Toe Wall Cum 1 27.27 1.70 0.74 34.3
TOTAL 0.0
3 Mtr. To 6 Mtr. Depth
For Abutment Foundation Cum 2 12.40 12.30 1.20 366.0
For Pier Foundation Cum -1 8.30 10.30 1.20 -102.6
TOTAL 0.0
Above 6 Mtr. Depth
For Abutment Foundation Cum 2 12.40 12.30 0.57 173.4
For Pier Foundation Cum -1 8.30 10.30 0.33 -28.4
TOTAL 0.0

0 PCC M-15 for Leveling course


For Abutment Foundation Cum 2 12.40 12.30 0.15 45.8
For Pier Foundation Cum -1 8.15 10.15 0.15 -12.4
For Toe Wall Cum 1 27.12 1.55 0.15 6.3
TOTAL 0 0.0
0 RCC M-30 for Foundation
For Box Type Abutment Cum 2 6.55 12.00 0.30 47.1
For Box Type Abt TOE Cum 2 2.43 12.00 1.30 75.8
Pier Foundation Lower Rectangular Portion Cum -1 8.00 10.00 0.80 -64.0
Pier Foundation Upper Rectangular Portion Cum -1 1.70 10.00 0.55 -9.4
Pier Foundation Triangular Portion Cum -2 3.15 10.00 0.55 -17.3
TOTAL 0 0.0
0 PCC M 20 Toe wall
Toe wall Rectangular Portion Cum 1 26.97 1.40 0.20 7.6
Toe wall Upper Rect Portion Cum 1 26.97 0.30 1.50 12.1
Toe wall Triangular Portion Cum 1 26.97 0.50 1.50 10.1
Total 0 0.0
0 RCC M-30 for Sub-Structure
Abt Front Wall Cum 2 0.30 12.00 7.82 56.3 6.38
Abt Rear Wall Cum 2 0.30 12.00 9.68 69.7 7.4
Abt Middle wall Cum 4 0.30 12.00 9.68 139.4
Abutment side (Rear & Mid) Cum 4 2.823 0.30 9.684 32.8
Abutment side (Below Cap) Cum 4 2.823 0.30 7.94 26.9
Abutment side (From Cap) Cum 4 2.341 0.30 1.75 4.9
Abt intermdiate wall (Rear & Mid) Cum 4 2.823 0.30 9.68 32.8
Abt intermdiate wall (Front up to soffit) Cum 4 2.823 0.30 7.82 26.5
Abt intermdiate wall (Front Abave soffit) Cum 4 3.006 0.30 1.75 6.3
Abut. Cap Cum 2 0.30 12.00 0.50 3.6
Overhang Cap Rect. Portion Cum 2 0.97 12.00 0.50 11.6
Box Abt Dirt wall Cum 2 0.30 12.00 1.75 12.6
Pier stem rectangle Cum -1 1.50 8.00 8.32 -99.8
Pier stem perabola Cum -1 1.00 8.32 -8.3
Pier Cap Lower Rect Portion Cum -1 2.10 8.00 0.75 -12.6
Pier Cap Triangular Portion Cum -2 2.10 1.50 0.75 -2.4
Pier Cap Upper Rect Portion Cum -1 2.10 12.00 0.75 -18.9
Abt. Counterfort Cum 10 2.43 0.30 3.50 12.8
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
Total 0 0.0
0 RCC M-40 for Sub-Structure
Pedestal Cum 0 0.40 0.50 0.40 0.0
Total 0.0
0 RCC M 30 Super Structure
Solid slab Cum 0 0.00 12.00 1.588 0.0
Camber of Solid slab Cum 0 0.00 6.00 0.075 0.0
Abut Box top Slab Cum 2 10.15 12.00 0.30 73.1
Total 0 0.0
0 Concrete in Superstructure M 35 (RCC/PSC)
M-30 for Rcc Longitudnal Girder Cum 0 - - - 0.0
M-30 for Rcc Cross Girder Cum - - - - 0.0
Total 0.0
0 Reinforcement (HYSD Bars)
Foundation
For abutment 100.00 122.95 12.3
For Pier 100.00 -90.68 -9.1
Total Mt 100.00 0 - - 0.0 0.0
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
Sub structure
For abutment 110.00 436 48.0
For Pier 110.00 -142 -15.6
Total Mt 110.00 0 - - 0.0 0.0
Solid slab Mt 120.00 0 - - 0.0 0.0
For Rcc Girder120 kg / cum conc. Mt 120 0 - - 0.0 0.0
Total 0 0.0
0 Crash Barrier
Crash barrier RCC Rm 2 0.00 - - 0.0
Total 0.0
0 Elastomeric Bearing
Elastomeric Bearing Cu cm 0 30.000 40.000 6.000 0.0
Total 0.0
0 Strip seal Expansion joint
Strip seal Expansion joint Rm 1 - 12.00 - 12.0
Total 0.0
0 Concrete Wearing coat M 30
Above Solid slab Cum 1 0.00 12.00 0.075 0.0
Total 0 0.0
0 Drainage spout

Drainage spout I No. 2 0 0.0


Total 0 0.0
0 Weep holes
Behind Abutment on Face wall Cum 6 2.60 0.30 0.24 1.0
Behind Abutment on Side wall Front side Cum 6 2.60 0.70 11.0
Behind Abutment on Side wall Rear & Mid side Cum 12 2.82 0.70 24.0
Total 0 0
0 Granular Back fill
Abutment Front Cell (below Cap) Cum 6 2.82 3.60 7.44 453.5
Abutment Front Cell (Above Cap) Cum 6 2.341 3.60 2.25 113.7
Abutment Rear and Mid Cell Cum 12 2.82 3.60 9.68 1181.1
Total 0.0
0 Stone Pitching
Stone Pitching Cum 1 69.63 0.30 20.9
Total 0.00
0 Filter media beneath pitching
Filter media beneath pitching Cum 1 69.63 0.15 10.4
Total 0.00
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
Taking, exploratory boring
0
Upto 1.0 m below bed level Metre 1 1 1.0
TOTAL 0.0
Beyond 1.0 m depth upto 5.0 m Metre 1 4 4.0
TOTAL 0.0
Beyond 5.0 m depth Metre 1 10 10.0
TOTAL 0.0
0 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-750 mm)
For Abutment Metre 0 0 0.0
For Pier Metre 0 0 0.0
For Retaining Wall Metre 0 0 0.0
TOTAL 0.0
0 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-1000 mm)
For Abutment Metre 0 0 0.0
For Pier Metre 0 0 0.0
For Retaining Wall Metre 0 15 0.0
TOTAL 0.0
0 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-1200 mm)
For Abutment Metre 0 25 0.0
For Pier Metre 0 25 0.0
For Retaining Wall Metre 0 0 0.0
TOTAL 0.0
0 Driven cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-750 mm)
For Abutment Metre 0 0 0.0
For Pier Metre 0 0 0.0
For Retaining Wall Metre 0 0 0.0
TOTAL 0.0
0 Driven cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-1000 mm)
For Abutment Metre 0 0 0.0
For Pier Metre 0 0 0.0
For Retaining Wall Metre 0 15 0.0
TOTAL 0.0
0 Driven cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-1200 mm)
For Abutment Metre 0 25 0.0
For Pier Metre 0 25 0.0
For Retaining Wall Metre 0 0 0.0
TOTAL 0.0
0 Pile load test on single vertical pile in accordance with IS:2911(Part-IV)
For Abutment tonne 0.0
For Pier tonne 0.0
For Retaining Wall tonne 0.0
TOTAL 0.0
0 Excavation on Soil
up to 3 Mtr. Depth
For Abutment Foundation Cum 2 6.80 12.30 1.64 274.6
For Pier Foundation Cum -1 6.30 1.80 1.80 -20.4
For Retaining Wall Foundation Cum 0 0.00 0.00 1.29 0.0
For Toe Wall Cum 1 35.99 1.70 1.11 67.9
TOTAL 0 0.0
3 Mtr. To 6 Mtr. Depth
For Abutment Foundation Cum 2 6.80 12.30 0.0 0.0
For Pier Foundation Cum -1 6.30 1.80 1.80 -20.4
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 35.99 1.70 0.00 0.0
TOTAL 0.0
Above 6 Mtr. Depth
For Abutment Foundation Cum 2 6.80 12.30 0.00 0.0
For Pier Foundation Cum -1 6.30 1.80 4.20 -47.6
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 35.99 1.70 0.00 0.0
TOTAL 0.0

0 Excavation on Ordinary Rock


up to 3 Mtr. Depth
For Abutment Foundation Cum 2 6.80 12.30 1.09 183.1
For Pier Foundation Cum -1 6.30 1.80 1.20 -13.6
For Retaining Wall Foundation Cum 0 0.00 0.00 0.86 0.0
For Toe Wall Cum 1 35.99 1.70 0.74 45.3
TOTAL 0.0
3 Mtr. To 6 Mtr. Depth
For Abutment Foundation Cum 2 6.80 12.30 0.00 0.0
For Pier Foundation Cum -1 6.30 1.80 1.20 -13.6
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 35.99 1.70 0.00 0.0
TOTAL 0.0
Above 6 Mtr. Depth
For Abutment Foundation Cum 2 6.80 12.30 0.00 0.0
For Pier Foundation Cum -1 6.30 1.80 2.80 -31.8
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 35.99 1.70 0.00 0.0
TOTAL 0.0

0 PCC M-15 for Leveling course


Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
For Abutment Foundation Cum 2 6.80 12.30 0.15 25.1
For Pier Foundation Cum -1 6.15 1.65 0.15 -1.5
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 35.84 1.55 0.15 8.3
TOTAL 0 0.0
0 Leveling course for Pile cap PCC in M-15 below Pile cap
For Abutment Pile Fondation Cum 2 6.80 12.15 0.15 0.0
For Pier Pile Fondation Cum -1 6.15 1.65 0.15 0.0
For Retaining wall Pile Fondation Cum 0 0.00 0.00 0.00 0.0
0.0
0 RCC M-30 for Foundation
For Wall type Abutment Foundation Cum 0 8.70 12.00 0.50 0.0
For Abt TOE Triangular Portion Cum 0 4.20 12.00 1.00 0.0
For Abt HEEL Triangular Portion Cum 0 4.20 12.00 1.00 0.0
For Abt Upper Rectangular Portion Cum 0 0.30 12.00 1.00 0.0
TOTAL 0.0
0 RCC M-30 for Foundation
For Box Type Abutment Cum 2 5.50 12.00 0.30 39.6
For Box Type Abt TOE Cum 2 1.00 12.00 0.55 13.2
Pier Foundation Lower Rectangular Portion Cum -1 6.00 1.50 0.50 -4.5
Pier Foundation Upper Rectangular Portion Cum -1 2.10 1.50 0.50 -1.6
Pier Foundation Triangular Portion Cum -2 1.95 1.50 0.50 -1.5
Pier Footing (Square) Cum 0 6-1.5 2.1-2.1 0.50 0.00
For Retaining Wall Lower Rect Portion Cum 0 0.00 0.00 0.00 0.0
Retaining Wall Upper Rect Portion Cum 0 0.00 0.00 0.00 0.0
Retaining Wall Toe Portion Cum 0 0.00 0.00 0.00 0.0
Retaining Wall Heel Portion Cum 0 0.00 0.00 0.00 0.0
TOTAL 0 0.0
0 RCC M-30 in Pile Cap
For Wall Type Abutment Pile Cap Foundation Cum 0 8.70 12.00 1.80 0.0
TOTAL 0.0
0 RCC M-30 in Pile Cap
For Box Type Abutment Pile Foundation Cum 2 6.50 12.00 1.80 0.0
Pier Pile Cap Cum -1 5.10 8.70 1.80 0.0
Retaining Wall Pile Cap Cum 0 0.00 0.00 0.00 0.0
TOTAL 0.0
0 PCC M 20 Toe wall
Toe wall Rectangular Portion Cum 1 35.69 1.40 0.20 10.0
Toe wall Upper Rect Portion Cum 1 35.69 0.30 1.50 16.1
Toe wall Triangular Portion Cum 1 35.69 0.50 1.50 13.4
Total 0 0.0
0 RCC M-30 for Sub-Structure
Abt Front Wall Cum 2 0.30 12.00 4.75 34.2 6.38
Abt Rear Wall Cum 2 0.30 12.00 5.78 41.6 7.4
Abt Middle wall Cum 2 0.20 12.00 5.78 27.7
Abutment side (Rear & Mid) Cum 4 2.350 0.30 5.775 16.3
Abutment side (Below Cap) Cum 4 2.350 0.30 5.33 15.0
Abutment side (From Cap) Cum 4 1.680 0.30 0.45 0.9
Abt intermdiate wall (Rear & Mid) Cum 6 2.350 0.20 5.78 16.3
Abt intermdiate wall (Front up to soffit) Cum 6 2.350 0.20 4.75 13.4
Abt intermdiate wall (Front Abave soffit) Cum 6 2.720 0.20 0.45 1.5
Abut. Cap Cum 2 0.30 12.00 0.50 3.6
Overhang Cap Rect. Portion Cum 2 1.34 12.00 0.50 16.1
Overhang Cap Traingular Portion Cum 0 0.00 12.00 0.0
Box Abt Dirt wall Cum 2 0.30 12.00 0.45 3.2
For Retaining Wall Cum 0 0.00 0.00 0.00 0.0
Pier stem rectangle Cum -1 2.00 6.00 157.88 -1894.5
Pier stem perabola Cum -1 0.00 157.88 0.0
Pier Cap Lower Rect Portion Cum -1 3.30 6.00 0.75 -14.9
Pier Cap Triangular Portion Cum -2 3.30 4.01 0.75 -9.9
Pier Cap Upper Rect Portion Cum -1 3.30 14.01 0.75 -34.7
Bracket Rect portion Cum 0 0.30 12.00 0.30 0.0
Bracket Triangular portion Cum 0 0.30 12.00 0.30 0.0
Return Wall Cum 0 0.60 4.20 4.75 0.0
Total 0 0.0
0 RCC M-40 for Sub-Structure
Pedestal Cum 0 0.00 0.00 0.00 0.0
Total 0.0
0 RCC M 30 Super Structure
Box Type Slab
Cum 0 5.00 0.0
Cum 0 0.00 11.18 0.0
Solid slab Cum 0 0.00 12.00 0.750 0.0
Solid slab II Cum 0 0.00 12.00 0.750 0.0
Solid slab III Cum 0 0.00 12.00 0.750 0.0
Camber of Solid slab Cum 0 0.00 6.00 0.075 0.0
Camber of Solid slab II Cum 0 0.00 6.00 0.075 0.0
Camber of Solid slab III Cum 0 0.00 6.00 0.075 0.0
Abut Box top Slab Cum 2 6.17 12.00 0.30 44.4
Total 0 0.0
0 Crash Barrier (M-40) for Super Structure
Crash barrier Concrete Cum 0 5.71 0.310 0.0
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
Total 0.0
0 Concrete in Superstructure M 35 (RCC/PSC)
M-30 for Rcc Longitudnal Girder Cum 0 - - - 0.0
M-30 for Rcc Cross Girder Cum - - - - 0.0
M-30 for Rcc Longitudnal Girder Cum 0 - - - 0.0
M-30 for Rcc Cross Girder Cum - - - - 0.0
M-30 for Rcc Longitudnal Girder Cum 0 - - - 0.0
M-30 for Rcc Cross Girder Cum - - - - 0.0
Total 0.0
0 PCC M-15 for Approach slab
Approach slab Cum 0 3.50 12.00 0.15 0.0
Total 0 0.0
0 RCC M-30 for Approach slab
Approach slab Cum 0 3.50 12.00 0.30 0.0
Total 0 0.0
0 Reinforcement (HYSD Bars)
Foundation
For abutment 100.00 52.80 5.3
For Pier 100.00 -7.54 -0.8
For retaining wall 100.00 0.00 0.0
Total Mt 100.00 0 - - 0.0 0.0
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
Sub structure
For abutment 110.00 190 20.9
For Pier 110.00 -1954 -214.9
For retaining wall 110.00 0 0.0
For Return Wall 110.00 0 0.0
Total Mt 110.00 0 - - 0.0 0.0
Solid slab Mt 120.00 0 - - 0.0 0.0
For Rcc Girder120 kg / cum conc. Mt 120 0 - - 0.0 0.0
RCC Approch slab @ 0kg/cum conc. Mt 0 0.0 - - 0.0 0.0
RCC Crash Barrier @ 150 kg/cum conc. Mt 150 0.0 - - 0.0 0.0
Total 0 0.0
0 High tensile steel wire
Tensoning wire for Psc Girder Mt 0 0.00 0.0
Total 0.0
0 Crash Barrier
Crash barrier RCC Rm 2 0.00 - - 0.0
Total 0.0
0 RCC Railing
Railing RCC 0 7.00 - - 0.0
Total 0 0.0
0 Tar Paper Bearing
Tar Paper Bearing Sqm 0 0.00 1.00 - 0.0
Total 0.0
0 Elastomeric Bearing
Elastomeric Bearing Cu cm 0 0.000 0.000 0.000 0.0
Total 0.0
0 Pot PTFE Bearing
Pot PTFE Bearing Tonne 0 100.00 - - 0.0
Total 0.0
0 Filler joint 20mm thick Expansion joint
Filler joint 20mm thick Expansion joint Rm 1 - 12.00 - 12.0
Total 0.0
0 Strip seal Expansion joint
Strip seal Expansion joint Rm 0 - 12.00 - 0.0
Total 0.0
0 Concrete Wearing coat M 30
Above Solid slab Cum 1 0.00 12.00 0.075 0.0
Total 0 0.0
0 Filter media :
Behind Abutment on Face wall Cum 8 2.70 0.60 2.46 0.0
Behind Abutment on Side wall (Front side) Cum 2 2.35 0.60 2.46 0.0
Behind Abutment on Side wall (Rear & Mid side) Cum 4 2.35 0.60 2.46 0.0
Behind Retaining wall Cum 0 0.00 0.00 0.00 0.0
Behind Return wall Cum 0 4.20 0.00 2.46 0.0
Total 0 0.0
0 Drainage spout

Drainage spout I No. 2 0 0.0


Drainage spout II No. 0 0 0.0
Drainage spout III No. 0 0 0.0
Total 0 0.0
0 Weep holes
Behind Abutment on Face wall Cum 8 1.70 0.30 2.46 10.0
Behind Abutment on Side wall Front side Cum 8 1.70 2.46 34.0
Behind Abutment on Side wall Rear & Mid side Cum 8 2.35 2.46 46.0
Behind Retaining wall Cum 0 0.00 0.00 0.00 0.0
Behind Return wall Cum 0 4.20 0.60 2.46 0.0
Total 0 0
0 Granular Back fill
Abutment Front Cell (below Cap) Cum 8 2.35 2.70 4.83 244.9
Abutment Front Cell (Above Cap) Cum 8 1.680 2.70 0.95 34.5
Abutment Rear and Mid Cell Cum 8 2.35 2.70 5.78 293.1
Granular Back fill behind abutment Cum 0 4.14 10.80 0.0
Total 0.0
0 Stone Pitching
Stone Pitching Cum 1 121.96 0.30 36.6
Total 0.00
0 Filter media beneath pitching
Filter media beneath pitching Cum 1 121.96 0.15 18.3
Total 0.00
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
0 Dismentaling
For PCC
headwall Cum 2 11.40 1.25 2.00 57.0
b-pier Cum 0 1.50 7.50 0.15 0.0
Total 0.00
For RCC
a-Slab Cum 0 7 7.50 0.60 0.0
b-pier Cum 0 2.00 5.50 6.00 0.0
c-footing Pier & Abutment Cum 0 2.00 5.50 1.50 0.0
BOX Cum
Total 0.00
Rubble Stone masonry with lime mortar Cum 0.0
Total 0.0
Rubble Stone masonry with Cement mortar Cum 0 0.80 7.50 1.50 0.0
Total 0.0
For Pipe
a- Up to 1200 mm dia Rm 7.5
Total 0.0
b-600 to 900 mm dia Rm 0.0
Total 0.0
c-Above 900 mm dia Rm 0.0
Total 0.0
for concrete railling Rm 0 100.00 0.0
Total ` 0.0

20 Diversion

Earthwork in Excavation of foundations for


structures complete as per Technical
Specifications Clause 304 and 2903 including all
leads and lifts.
Earthwork including
For Pipe bedding 1 4.70 5.92 2.05 57.0
Flooring U/s 1 12.50 1.50 0.30 5.6
Deduction -2 1.77 0.30 -1.1
Flooring D/s 1 12.50 3.00 0.30 11.3
Deduction -2 5.47 0.30 -3.3
For head wall 0 12.65 1.40 0.80 0.0
cum total 69.6

Providing PCC / RCC in open foundations


complete excluding reinforcement as per
drawings and Technical Specifications
M-15 grade in levelling course
Below Headwall cum 2 12.50 1.40 0.15 5.3

Providing PCC M 20 in Head wall,curtain wall


complete excluding reinforcement as per
drawings and Technical Specifications
M-20 grade
For Head Wall cum 1 12.50 0.83 2.69 27.7
Deduction for pipe (Area of Pipe) cum 1 0.83 4.89 4.0
Providing and laying Granular bed for RCC pipes total 31.8
in culverts with all lifts and leads complete as per
Technical Specification Clause 2904.
M-15 grade
Below Pipe cum 1 4.70 5.92 0.55 15.3
Deduction cum -1 4.70 0.25 -1.2
cum total 14.1

Providing , laying and jointing NP4 (as per IS:458)


Hume pipes for culverts, complete as per
Technical Specification Section 2900 and IRC
Special Publication No.13.
FOR 2 ROW
Φ 1200 m 7.50 7.5
Φ 1000
Φ 900

Construction of embankment/ subgrade/


earthen shoulders with approved material
obtained from borrow pits with all lifts & leads
including excavation, transporting to site, 1 67.50 7.50 0.30 151.9
spreading, grading to required slope and
compacted to meet requirement of table No.
300-2 and as per relevant clauses of section-
300. cum

Construction of granular sub-base by providing


coarse graded material, spreading in
uniform layers with on prepared surface, .
mixing by mix in place method at OMC, and
compacting with vibratory roller to achieve
the desired density, complete in all respect
and as per relevant clauses of section-400.
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
for grading- I Material cum
for grading- II Material cum 1 67.50 7.50 0.15 75.9
for grading-III Material cum
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
0 Taking, exploratory boring

Upto 1.0 m below bed level Metre 0 1 0.0


TOTAL 0.0
Beyond 1.0 m depth upto 5.0 m Metre 0 4 0.0
TOTAL 0.0
Beyond 5.0 m depth Metre 0 10 0.0
TOTAL 0.0
0 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-750 mm)
For Abutment Metre 15 0 0.0
For Pier Metre 0 0 0.0
For Retaining Wall Metre 0 0 0.0
TOTAL 0.0
0 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-1000 mm)
For Abutment Metre 15 0 0.0
For Pier Metre 0 0 0.0
For Retaining Wall Metre 0 15 0.0
TOTAL 0.0
0 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-1200 mm)
For Abutment Metre 30 25 750.0
For Pier Metre 0 25 0.0
For Retaining Wall Metre 0 0 0.0
TOTAL 0.0
0 Driven cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-750 mm)
For Abutment Metre 15 0 0.0
For Pier Metre 0 0 0.0
For Retaining Wall Metre 0 0 0.0
TOTAL 0.0
0 Driven cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-1000 mm)
For Abutment Metre 15 0 0.0
For Pier Metre 0 0 0.0
For Retaining Wall Metre 0 15 0.0
TOTAL 0.0
0 Driven cast-in-situ M35 grade R.C.C. pile excluding reinforcement (Pile diameter-1200 mm)
For Abutment Metre 15 25 0.0
For Pier Metre 0 25 0.0
For Retaining Wall Metre 0 0 0.0
TOTAL 0.0
0 Pile load test on single vertical pile in accordance with IS:2911(Part-IV)
For Abutment tonne 0.0
For Pier tonne 0.0
For Retaining Wall tonne 0.0
TOTAL 0.0
0 Excavation on Soil
up to 3 Mtr. Depth
For Abutment Pile Fondation Cum 2 9.00 12.30 2.40 531.4
For Pier Foundation Cum -1 6.30 1.80 2.40 -27.2
For Retaining Wall Foundation Cum 0 0.00 0.00 1.72 0.0
For Toe Wall Cum 1 47.40 1.70 1.48 119.3
TOTAL 0 0.0
3 Mtr. To 6 Mtr. Depth
For Abutment Pile Fondation Cum 2 9.00 12.30 0.0 0.0
For Pier Foundation Cum -1 6.30 1.80 2.40 -27.2
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 47.40 1.70 0.00 0.0
TOTAL 0.0
Above 6 Mtr. Depth
For Abutment Pile Fondation Cum 2 9.00 12.30 0.00 0.0
For Pier Foundation Cum -1 6.30 1.80 5.60 -63.5
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 47.40 1.70 0.00 0.0
TOTAL 0.0

0 Excavation on Ordinary Rock


up to 3 Mtr. Depth
For Abutment Pile Fondation Cum 2 9.00 12.30 0.60 132.8
For Pier Foundation Cum -1 6.30 1.80 0.60 -6.8
For Retaining Wall Foundation Cum 0 0.00 0.00 0.43 0.0
For Toe Wall Cum 1 47.40 1.70 0.37 29.8
TOTAL 0.0
3 Mtr. To 6 Mtr. Depth
For Abutment Pile Fondation Cum 2 9.00 12.30 0.00 0.0
For Pier Foundation Cum -1 6.30 1.80 0.60 -6.8
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 47.40 1.70 0.00 0.0
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
TOTAL 0.0
Above 6 Mtr. Depth
For Abutment Pile Fondation Cum 2 9.00 12.30 0.00 0.0
For Pier Foundation Cum -1 6.30 1.80 1.40 -15.9
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 47.40 1.70 0.00 0.0
TOTAL 0.0

0 PCC M-15 for Leveling course


For Abutment Foundation Cum 2 9.00 12.30 0.15 0.0
For Pier Foundation Cum -1 6.15 1.65 0.15 -1.5
For Retaining Wall Foundation Cum 0 0.00 0.00 0.00 0.0
For Toe Wall Cum 1 47.25 1.55 0.15 11.0
TOTAL 0 0.0
0 Leveling course for Pile cap PCC in M-15 below Pile cap
For Abutment Pile Fondation Cum 2 9.00 12.15 0.15 32.8
For Pier Pile Fondation Cum -1 6.15 1.65 0.15 0.0
For Retaining wall Pile Fondation Cum 0 0.00 0.00 0.00 0.0
0.0
0 RCC M-30 for Foundation
For Wall type Abutment Foundation Cum 2 0.00 12.00 0.50 0.0
For Abt TOE Triangular Portion Cum 2 0.00 12.00 1.00 0.0
For Abt HEEL Triangular Portion Cum 2 0.00 12.00 1.00 0.0
For Abt Upper Rectangular Portion Cum 2 0.00 12.00 1.00 0.0
TOTAL 0.0
0 RCC M-30 for Foundation
For Box Type Abutment Cum 0 4.00 12.00 0.30 0.0
For Box Type Abt TOE Cum 0 1.00 12.00 0.55 0.0
Pier Foundation Lower Rectangular Portion Cum -1 6.00 1.50 0.50 -4.5
Pier Foundation Upper Rectangular Portion Cum -1 2.10 1.50 0.50 -1.6
Pier Foundation Triangular Portion Cum -2 1.95 1.50 0.50 -1.5
Pier Footing (Square) Cum 0 6-1.5 2.1-2.1 0.50 0.00
For Retaining Wall Lower Rect Portion Cum 0 0.00 0.00 0.00 0.0
Retaining Wall Upper Rect Portion Cum 0 0.00 0.00 0.00 0.0
Retaining Wall Toe Portion Cum 0 0.00 0.00 0.00 0.0
Retaining Wall Heel Portion Cum 0 0.00 0.00 0.00 0.0
TOTAL 0 0.0
0 RCC M-30 in Pile Cap
For Wall Type Abutment Pile Cap Foundation Cum 2 8.70 12.00 1.80 375.8
TOTAL 0.0
0 RCC M-30 in Pile Cap
For Box Type Abutment Pile Foundation Cum 0 5.00 12.00 1.80 0.0
Pier Pile Cap Cum -1 5.10 8.70 1.80 -79.9
Retaining Wall Pile Cap Cum 0 0.00 0.00 0.00 0.0
TOTAL 0.0
0 PCC M 20 Toe wall
Toe wall Rectangular Portion Cum 1 47.10 1.40 0.20 13.2
Toe wall Upper Rect Portion Cum 1 47.10 0.30 1.50 21.2
Toe wall Triangular Portion Cum 1 47.10 0.50 1.50 17.7
Total 0 0.0
0 RCC M-30 for Sub-Structure
Abt Stem Cum 2 1.20 12.00 6.38 183.6 6.38
- Cum 0 0.30 12.00 7.40 0.0 7.4
- Cum 0 0.20 12.00 7.40 0.0
- Cum 0 1.600 0.30 7.400 0.0
- Cum 0 1.600 0.30 6.65 0.0
- Cum 0 0.930 0.30 0.75 0.0
- Cum 0 1.600 0.20 7.40 0.0
- Cum 0 1.600 0.20 6.38 0.0
- Cum 0 1.970 0.20 0.75 0.0
Abut. Cap Cum 0 0.30 12.00 0.50 0.0
Overhang Cap Rect. Portion Cum 0 1.34 12.00 0.50 0.0
Overhang Cap Traingular Portion Cum 2 0.00 12.00 0.0
Wall type Abt Dirt wall Cum 2 0.30 12.00 0.75 5.4
For Retaining Wall Cum 0 0.00 0.00 0.00 0.0
Pier stem rectangle Cum -1 2.00 6.00 -237.55 2850.6
Pier stem perabola Cum -1 0.00 -237.55 0.0
Pier Cap Lower Rect Portion Cum -1 3.30 6.00 0.75 -14.9
Pier Cap Triangular Portion Cum -2 3.30 4.01 0.75 -9.9
Pier Cap Upper Rect Portion Cum -1 3.30 14.01 0.75 -34.7
Bracket Rect portion Cum 2 0.30 12.00 0.30 2.2
Bracket Triangular portion Cum 2 0.30 12.00 0.30 1.1
Return Wall Cum 4 0.60 3.75 6.68 60.1
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
Total 0 0.0
0 RCC M-40 for Sub-Structure
Pedestal Cum 0 0.60 0.80 0.30 0.0
Total 0.0
0 RCC M 30 Super Structure
Box Type Slab
Cum 0 5.00 0.0
Cum 0 0.00 11.18 0.0
Solid slab Cum 0 0.00 12.00 0.750 0.0
Solid slab II Cum 0 0.00 12.00 0.750 0.0
Solid slab III Cum 0 0.00 12.00 0.750 0.0
Camber of Solid slab Cum 0 0.00 6.00 0.075 0.0
Camber of Solid slab II Cum 0 0.00 6.00 0.075 0.0
Camber of Solid slab III Cum 0 0.00 6.00 0.075 0.0
- Cum 0 4.67 12.00 0.30 0.0
Total 0 0.0
0 Crash Barrier (M-40) for Super Structure
Crash barrier Concrete Cum 0 6.34 0.310 0.0
Total 0.0
0 Concrete in Superstructure M 35 (RCC/PSC)
M-30 for Rcc Longitudnal Girder Cum 0 - - - 0.0
M-30 for Rcc Cross Girder Cum - - - - 0.0
M-30 for Rcc Longitudnal Girder Cum 0 - - - 0.0
M-30 for Rcc Cross Girder Cum - - - - 0.0
M-30 for Rcc Longitudnal Girder Cum 0 - - - 0.0
M-30 for Rcc Cross Girder Cum - - - - 0.0
Total 0.0
0 PCC M-15 for Approach slab
Approach slab Cum 2 3.50 12.00 0.15 12.6
Total 0 0.0
0 RCC M-30 for Approach slab
Approach slab Cum 2 3.50 12.00 0.30 25.2
Total 0 0.0
0 Reinforcement (HYSD Bars)
Foundation
For abutment 100.00 848.23 84.8
For Pier 100.00 -87.40 -8.7
For retaining wall 100.00 0.00 0.0
Total Mt 100.00 0 - - 0.0 0.0
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
Sub structure
For abutment 110.00 192 21.1
For Pier 110.00 2791 307.0
For retaining wall 110.00 0 0.0
For Return Wall 110.00 60 6.6
Total Mt 110.00 0 - - 0.0 0.0
Solid slab Mt 120.00 0 - - 0.0 0.0
For Rcc Girder120 kg / cum conc. Mt 120 0 - - 0.0 0.0
RCC Approch slab @ 0kg/cum conc. Mt 0 0.0 - - 0.0 0.0
RCC Crash Barrier @ 150 kg/cum conc. Mt 150 0.0 - - 0.0 0.0
Total 0 0.0
0 High tensile steel wire
Tensoning wire for Psc Girder Mt 0 0.00 0.0
Total 0.0
0 Crash Barrier
Crash barrier RCC Rm 0 0.00 - - 0.0
Total 0.0
0 RCC Railing
Railing RCC 2 7.00 - - 14.0
Total 0 0.0
0 Tar Paper Bearing
Tar Paper Bearing Tonne 0 0.00 1.45 - 0.0
Total 0.0
0 Elastomeric Bearing
Elastomeric Bearing Cu cm 0 0.000 0.000 0.000 0.0
Total 0.0
0 Pot PTFE Bearing
Pot PTFE Bearing Tonne 0 100.00 - - 0.0
Total 0.0
0 Filler joint 20mm thick Expansion joint
Filler joint 20mm thick Expansion joint Rm 0 - 12.00 - 0.0
Total 0.0
0 Strip seal Expansion joint
Strip seal Expansion joint Rm 1 - 12.00 - 12.0
Total 0.0
0 Concrete Wearing coat M 30
Above Solid slab Cum 1 0.00 12.00 0.075 0.0
Total 0 0.0
0 Filter media :
Behind Abutment on Face wall Cum 2 12.00 0.60 3.38 0.0
Behind Abutment on Side wall (Front side) Cum 2 1.60 0.60 3.68 0.0
Behind Abutment on Side wall (Rear & Mid side) Cum 4 1.60 0.60 3.68 0.0
Behind Retaining wall Cum 0 0.00 0.00 0.00 0.0
Behind Return wall Cum 4 3.75 0.00 3.38 0.0
Total 0 0.0
0 Drainage spout

Drainage spout I No. 2 0 0.0


Drainage spout II No. 0 0 0.0
Drainage spout III No. 0 0 0.0
Total 0 0.0
0 Weep holes
Behind Abutment on Face wall Cum 2 11.00 1.20 3.38 89.0
Behind Abutment on Side wall Front side Cum 2 11.00 3.68 0.0
Behind Abutment on Side wall Rear & Mid side Cum 8 1.60 3.68 0.0
Behind Retaining wall Cum 0 0.00 0.00 0.00 0.0
Behind Return wall Cum 4 3.75 0.60 3.38 30.0
Total 0 0
0 Granular Back fill
Abutment Front Cell (below Cap) Cum 8 1.60 2.70 6.45 0.0
Abutment Front Cell (Above Cap) Cum 8 0.930 2.70 0.95 0.0
Abutment Rear and Mid Cell Cum 8 1.60 2.70 7.40 0.0
Granular Back fill behind abutment Cum 2 7.22 10.80 155.9
Total 0.0
0 Stone Pitching
Stone Pitching Cum 1 212.38 0.30 63.7
Total 0.00
0 Filter media beneath pitching
Filter media beneath pitching Cum 1 212.38 0.15 31.9
Total 0.00
Begumganj-Sultanganj Road

DETAILS OF QUANTITY CALCULATION - Minor Bridge


Minor Bridge Reconstruction
Chainage - 0+000 Span- 0X0
Sr. No. Item Name Unit Nos Length Width Hight/ Depth Qty To. Qty.
0 Dismentaling
For PCC
A-Abutment Cum 0 1.50 7.50 0.15 0.0
b-pier Cum 0 1.50 7.50 0.15 0.0
Total 0.00
For RCC
a-Slab Cum 0 7 7.50 0.60 0.0
b-pier Cum 0 2.00 5.50 6.00 0.0
c-footing Pier & Abutment Cum 0 2.00 5.50 1.50 0.0
BOX Cum
Total 0.00
Rubble Stone masonry with lime mortar Cum 0.0
Total 0.0
Rubble Stone masonry with Cement mortar Cum 0 0.80 7.50 1.50 0.0
Total 0.0
For Pipe
a- Up to 600 mm dia Rm 0.0
Total 0.0
b-600 to 900 mm dia Rm 0.0
Total 0.0
c-Above 900 mm dia Rm 0.0
Total 0.0
for concrete railling Rm 0 100.00 0.0
Total ` 0.0

You might also like