4 Levelling course for Pile cap PCC in M-15 below Pile cap cum
12.30 PCC M-15 4333
15 Bearings
13.16 Tar paperBearing Sqm 43
13.13 Elastomeric Bearings cubic Cm. 0.78
13.15 Pot-PTFE Tonne 83
12.29 12.29
A cum 4909 A cum 5454
B cum 5342 B cum 5935
C cum 5396 C cum 5996
D cum 5511 D cum 6123
12.33 12.33
A metre 2450 A metre 2722
B metre 2562 B metre 2847
C metre 2673 C metre 2970
cum cum
12.1 I B (i) 52 12.1 I B (i) 58
12.1 I B (ii) 59 12.1 I B (ii) 66
12.1 I B (iii) 73 12.1 I B (iii) 81
cum cum
12.1 II B (i) 66 12.1 II B (i) 73
12.1 II B (ii) 104 12.1 II B (ii) 115
12.1 II B (iii) 142 12.1 II B (iii) 158
cum cum
12.3 4299 12.3 4777
cum cum
12.30 4333 12.30 4814
cum cum
12.8 G 5337 12.8 G 5930
cum cum
12.8 B 5025 12.8 B 5583
cum cum
13.6 G 5999 13.6 G 6485
cum cum
14.1 E 7151 14.1 E 7945
cum cum
14.1 C 6458 14.1 C 7175
MPPWD SOR 2017 MPPWD SOR 2016
SOR CLAUSE UNIT Rate SOR CLAUSE UNIT Rate
cum cum
14.1 F 7324 14.1 F 7815
cum cum
14.10 4397 14.10 4885
14.11 7970 14.11 8855
Tonne Tonne
12.31 49081 12.31 54534
13.7 48936 13.7 54373
14.2 50028 14.2 55587
Rmt Rmt
14.16 (ii) 377 14.17 (ii) 419
14.20 10431 14.21 11590
cum cum
14.4 10932 14.4 12147
cum cum
13.10 A 880 13.10 A 978
cum cum
15.4 A 2033 15.4 A 2259
cum cum
15.5 1265 15.5 1405
13.11 1117 13.11 1241
cum cum
2.3 I B 342 2.3 I B 380
cum cum
2.3 I C 886 2.3 I C 984
cum cum
2.3 III A 207 2.3 III A 230
2.3 III B 239 2.3 III B 265
2.3 II D 155 2.3 II D 172
no. no.
2.3 IX A 135 2.3 IX A 150
2.3 IX B 183 2.3 IX B 203
2.3 IX C 312 2.3 IX C 347
MPPWD SOR 2017 MPPWD SOR 2016
SOR CLAUSE UNIT Rate SOR CLAUSE UNIT Rate
2.3 I B Rmt 342 2.3 I B Rmt 380
MPPWD SOR 2015 MPPWD SOR 2014
SOR CLAUSE UNIT Rate SOR CLAUSE UNIT Rate
12.14 Rmt 6535 12.14 Rmt 6535
12.29 12.29
A cum 4909 A cum 4909
B cum 5342 B cum 5342
C cum 5396 C cum 5396
D cum 5511 D cum 5511
12.33 12.33
A metre 2450 A metre 2450
B metre 2562 B metre 2562
C metre 2673 C metre 2673
cum cum
12.1 I B (i) 52 12.1 I B (i) 52
12.1 I B (ii) 59 12.1 I B (ii) 59
12.1 I B (iii) 73 12.1 I B (iii) 73
cum cum
12.1 II B (i) 66 12.1 II B (i) 66
12.1 II B (ii) 104 12.1 II B (ii) 104
12.1 II B (iii) 142 12.1 II B (iii) 142
cum cum
12.3 4299 12.3 4299
cum cum
12.30 4333 12.30 4333
cum cum
12.8 G 5337 12.8 G 5337
cum cum
12.8 B 5025 12.8 B 5025
cum cum
13.6 G 5999 13.6 G 5999
cum cum
14.1 E 7151 14.1 E 7151
cum cum
14.1 C 6458 14.1 C 6458
MPPWD SOR 2015 MPPWD SOR 2014
SOR CLAUSE UNIT Rate SOR CLAUSE UNIT Rate
cum cum
14.1 F 7324 14.1 F 7324
cum cum
14.10 4397 14.10 4397
14.11 7970 14.11 7970
Tonne Tonne
12.31 49081 12.31 49081
13.7 48936 13.7 48936
14.2 50028 14.2 50028
Rmt Rmt
14.16 (ii) 377 14.16 (ii) 377
14.20 10431 14.20 10431
cum cum
14.4 10932 14.4 10932
cum cum
13.10 A 880 13.10 A 880
cum cum
15.4 A 2033 15.4 A 2033
cum cum
15.5 1265 15.5 1265
13.11 1117 13.11 1117
cum cum
2.3 I B 342 2.3 I B 342
cum cum
2.3 I C 886 2.3 I C 886
cum cum
2.3 III A 207 2.3 III A 207
2.3 III B 239 2.3 III B 239
2.3 II D 155 2.3 II D 155
no. no.
2.3 IX A 135 2.3 IX A 135
2.3 IX B 183 2.3 IX B 183
2.3 IX C 312 2.3 IX C 312
MPPWD SOR 2015 MPPWD SOR 2014
SOR CLAUSE UNIT Rate SOR CLAUSE UNIT Rate
2.3 I B Rmt 342 2.3 I B Rmt 342
APPENDIX-VI
1 x 12.00
0 x 0.00
0 x 0.00
0 x 0.00
0 x 0.00
0 x 0.00
11
APPENDIX-VI
0 x 0.00
0 x 0.00
0 x 0.00
12
A23 7.2 7.2
A20 0.35
A22 2.70
A21 0.20
A22 2.70
A24 12.00
A21 0.30
A22 2.70
A20 0.35
0.2
P11
10
2 0.8
P10 P8
TOE
P11
P11
0.9
P12 0.175
10
P15
1.5
P16
1.050 G3
0.125 G8
0.08 G7
G4
0.18 0.35 G9 G1
0.00 1.9
0 L1 0.0 L2
G6 0.2
G5 0.25
0.7
G2
R9 0.3
R8
#REF!
3.15 0.75
R4
R6
HEEL
R7 R7
T8
0
T1
4.2
T9
T11
21.958 3.4965
HEEL T6 T4
0.3 0.8
T7 T7
A34 A19 6.87
A35 0.3
0.3 A7 0.3
A6 0.9
A15 A14
11
12
13
14
0.3 0.2 0.30 15
A18 A17 A16 16
17
18
2.7 2.7 1 19
20
21
#REF! A12 A11 A9 22
A3 23
A2 0.5
0.3 24
A1 A1 25
0.15 26
A23 7.2 27
28
29
30
31
32
33
34
35
36
PIER DETAILS
FML 575.91 1
2
3
4
P7 0.9 5
6
7
P6 0.5 8
9
P5
10
0.5 11
12
P13 13
0.2 14
15
16
P4 78.742 17
18
GL 498.4 19
20
P2 0.5
P2 0.5
FDL 494.31
A1 0.15
12
FML
P7
P5 0.5
P6 0.5
P15 1.5
8 Girder DETAILS
Girder I
1
2
3
4
5
6
7
8
12.000 L3 0 0 9
10
11
12
13
14
15
16
17
Girder II
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Girder III
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
10
FML 575.91 1
2
3
4
5
6
7
R3 3.931 8
GL 573.6 9
2
R5
0.2
R2
TOE
R1 0.2
FDL 571.58
R1 0.15
5.9
TOE WALL DETA
2
3
0.3 5
GL 574 6
7
8
9
10
11
T3 1.5 12
13
14
15
T12 1.5
T4 T5
T2 0.2 = 572
A1 0.15
T7
1.4
Pier FDN Shape Trapezoid
Pier Sub Str Sha Rectangular
Pier Pile Type Bored Pile
No Of Piles 6
Pier Pile Dia 1200
Pier Pile Length 25
Footing
PIER DETAILS
Pier
Ground lvl GL 498.370
Foundation lvl FDL 494.314
No of Piers P1 0
Pier Footing Rect Port. Height P2 0.5
Pier Footing Trap Port. Height P3 0.45
Pier Stem Height P4 78.742
Pier Cap Trap Port. Height P5 0.5
Pier Cap Rect Port. Height P6 0.5
Pier Cap width 12
Slab Thickness P7 0.899999999999909
Pier Stem Length P8 0.8
Offset P9 0.1
Pier Foot Trap Half length P10 2
Pier Foot length P11 5
Pier Foot Width P12 10
Pier Cap Cantilever Length P13 0.2
Pier Cap Length P14 1.2
Pier Cap cantilever Portion Width P15 1.5
Pier Stem rectangle width P16 8
Pier Stem perabola width 0.5
No of Pedestrals P17 0
Pedestral length P18 0
Pedestral width P19 0
Pedestral HEIGHT P20 0
Begumganj-Sultanganj Road
Sl. No. Clause No. Item Unit Qty. Rate Total Rate
4 12.30 Levelling course for Pile cap PCC in M-15 below Pile cap
PCC M-15 cum 0.00 4333 0.00
Begumganj-Sultanganj Road
Sl. No. Clause No. Item Unit Qty. Rate Total Rate
14.10 PCC M-15 0.00 4397 0.00
14.11 RCC M-30 0.00 7970 0.00
10 Bearings
13.16 Tar paperBearing Sqm 0.00 43 0.00
13.14 Elastomeric Bearings cubic Cm. 0.00 0.78 0.00
13.12 Pot PTFE Bearing Tonne 0.00 83 0.00
20 Diversion Cost
Excavation in soil 278.28 52 14470.47
Concrete grade M 15 for levelling course 26.25 4299 112848.75
PCC of M 20 for head wall 158.86 5025 798256.78
Granular bed for RCC pipes 56.59 880 49800.61
NP4 Hume pipes 30.00 31100 933000.00
Construction of embankment/subgrade/earthen shoulders 540.00 144 77760.00
Construction of granular sub-base
for grading- I Material 0.00
for grading- II Material 270.00 764 206280.00
for grading-III Material 0.00
TOTAL 10160789.79
Begumganj-Sultanganj Road
20 Diversion
Total
0.0
c-Above 900 mm dia Rm 0.0
Total 0.0
for concrete railling Rm 0 100.00 0.0
Total ` 0.0
20 Diversion
20 Diversion
20 Diversion