LIST OF SITE WORKS - DHT SCOPE

Sl No. Description Aprrox wt.

01) Site Fabrication Steel 400


02) Site Fabrication 400
a) Dump hoppers – 2 no’s - 10 tons
b) Clinker hopper – 1 no - 60 tons Steel
c) Gypsum hopper – 1 no - 30 ton Steel
d) Classifier cyclones – 4 no’s - 20 tons
e) Staircases / Walkways / Hand railing - 20 tons
f) Maintenance platforms with hand railing - 70 tons
g) Supports &Supporting structures - 40 tons
h) Connecting Chutes - 10 tons
i) Ducting’s&Duct supports - 60 tons
j) Building covering structures - 60 tons
k) Misc. - 30 tons
03)  Weight of Equipment’s 600
a) Cement Mill with accessories
b) Classifier
c) Gear Boxes
d) Motors
e) Weigh Feeders
f) Bucket Elevators
g) Compressors / Blowers
h) Air Slides
i) Bag Filters
j) Fans
k) Belt Conveyors
l) FK Pumps
04) Erection -(400t+600t) 1000
05) RCC Works 1600
a) Dump Hopper tunnel - 100m3
b) Cement Mill hoppers-300m3
c) Cement Mill building-1000 m3
d) 33kv Switch yard-100m3
e) Water tank and Cooling tower-50m3
f) Misc. Foundations-50m3

06) Electrical Works Estimated


a) 33kv Switch yard erection
b) Cable laying
c) Electrical equipment installation
d) Cable trenches
e) Lighting system
07) Insulation for Ducting / Equipment’s 2500
08) Grinding Media charging 180
09) Water lines with fittings Estimated
10) Air lines with fittings
11) Dedusting Vent Lines
12) Unloading Equipment’s / Steel 1000
13) Side Claddings
14) Fire Fighting system
15) First fill of Lubricants
17) Installation & commissioning (beyond 90man days)
18) Misc. -8%
Total Site works Estimated Price
SCOPE
Total (INR in
Price
Lakhs) Ayokhi Apbava
tons 50000 200
tons 25000 100 63750
(fab & erection)

tons

tons 25000 250 30000


m3 15000 240
75

sqm 1600 40
tons 5000 9
15
25
20
tons 5000 50
30
10
20
30
86
1,200