The progress of each activity can be gauged in the most practical manner for each one.
ConcreteWork(Fraction:
The activities involved are straightforward and their value can be related to work hours: Activity Building foundations Building grade beams Building floor slab Area paving Pump pads 5 tank foundations TOTAL
Y d3
100 20 50 45 10 25
Hr
1500 450 300 300 150 300
Concr. Frac.
Total Frac. 0.125 0.038 0.025 0.025 0.0 12 0.025 0.250 down in several
250
3000
The progress of each activity can be gauged with a milestone system. Building(Fraction:
0.150)
If the estimate does not include an activity breakdown, the project manager uses experience a n d o r imagination to break the work into the conventional building construction activities