RISC - S0465 Steel Frame (Escalator) - Inspection of Welding Inspection For Escalator Steel Frame Lower Part
RISC - S0465 Steel Frame (Escalator) - Inspection of Welding Inspection For Escalator Steel Frame Lower Part
Main Works Contract for Footbridge and Covered Walkway Connecting Building 3W, Building 6W and Chong
Project
San Road (Works Contract No.: PD/WC/285)
Ref. No. PY/ HKSTPFB/ RISC/S0465
Trade Code* A / AC / BMS / DR / EL / ELV / FS / GA / ICT / GN / LI / LN / PL / ST / BS
Date
Attn/To Resident Engineer / Clerk of Works / RBSE
The following work has been inspected and found satisfactory by the
(3) Work proposed after approval of (2) Escalator steel frame installation
Signed By:
( A.R.E )
Filled in by
Work outlined in (2) above has been inspected/surveyed/witness. Permission to carry out proposed work outlined in (3)
above is *GIVEN / NOT GIVEN / NOT APPLICABLE for the followinq reasons:- (*delete as appropriate)
This in no way limits or alters the Contractor's obligations under the contract.
Signed By: Time: 1500
Designation: Kyle Liang Date: 15/03/2023
cc w/e cc w/e
HKSTP □ □ HY □ □
□ □ □ □
□ □ Aurecon □ □
Rev.01