You are on page 1of 9

REQUEST FOR INSPECTION (RINS)

Main Works Contract for Footbridge and Covered Walkway Connecting Building 3W, Building 6W and Chong
Project
San Road (Works Contract No.: PD/WC/285)
Ref. No. PY/ HKSTPFB/ RISC/S0465
Trade Code* A / AC / BMS / DR / EL / ELV / FS / GA / ICT / GN / LI / LN / PL / ST / BS
Date
Attn/To Resident Engineer / Clerk of Works / RBSE
The following work has been inspected and found satisfactory by the

(1) Location of Work steel fabricator


Steel Frame (Escalator) - Inspection Date Time
of Welding inspection for Escalator 15/3/2023 9:00
(2) Work to be inspected
steel frame lower part

(3) Work proposed after approval of (2) Escalator steel frame installation

The inspection also conduct via zoom:


(4) Remarks https://us06web.zoom.us/j/86525477122?
pwd=UzhkMkJXM2FsNkNiYkdyQXJKL3Nndz09

ITAP Control ☑ Hold □ Control □ Witness

Requested By: Victor Wong Time: 9:00

Position: Senior Site Agent Date: 14/3/2023

Received by Time: 1000 Date: 15/03/2023

Signed By:
( A.R.E )

Filled in by
Work outlined in (2) above has been inspected/surveyed/witness. Permission to carry out proposed work outlined in (3)
above is *GIVEN / NOT GIVEN / NOT APPLICABLE for the followinq reasons:- (*delete as appropriate)

This in no way limits or alters the Contractor's obligations under the contract.
Signed By: Time: 1500
Designation: Kyle Liang Date: 15/03/2023

Returned to Contractor Time: Date:


Received on behalf of Contractor by Signed By:
Site Representative
( )

cc w/e cc w/e
HKSTP □ □ HY □ □
□ □ □ □
□ □ Aurecon □ □
Rev.01