You are on page 1of 1

 Check whether any alarm is reported for the fault site.

 Check whether interference or weak coverage exists.

 Check engineering parameters and transmission.

 Write down problem description and check results and send this problem report
to R&D engineers.

Figure 4-60 Workflow of Analyzing Traffic Problem

Find out the area of low service rate


based on DT test data

Any alarm is reported for the Y


Clear the alarm
fault cell

Does the rate meet Y


Improve the coverage effect for the
requirements of radio
area of low rate
environment

Y
Are the parameters of serving Modify the value of abnormal
cell meet requirements parameter

Y
Submit problem report to the
Is the transmission abnormal
customer and ask help for solving
transmission problem

There may be something wrong with


the Version file. Report the problem
and problem location, track the
progress and verify the network
performance after adjustment

You might also like