You are on page 1of 6

JOB SAFETY AND ENVIRONMENT ANALYSIS

PT. XXXXXXX

PROJECT : Location Of Work :

JOB DESCRIPTION : Unloading Pipe and Loading to Trailler/Truck.


Unloading pipe and Transfer to pipe yard Tanggal :

Analysis By :
 New x JSA NO.
Reviewed By :
 Revised Date :
Approved By : Page No : 1 of 7

Standard Requirement : Permit To Work, JSA harus dibacakan sebelum mulai kerja
Standard PPE : Safety Shoes – Safety Helmet – Safety Glass - Coverall
Special Precuation : Jika cuaca buruk STOP Aktifitas

SEQUENCE OF BASIC JOB STEPS POTENTIAL HAZARDS RECOMMENDED ACTION OR PROCEDURE WHO
Break the job down into steps. Each of the Identify the hazards associated with each Using the first two columns as a guide, decide what actions are
steps should accomplish some major task and step. Examine each to find possibilities that necessary to eliminate or minimise the hazards that could lead to
be logical. could lead to an accident. an accident, injury or occupational illness.

1. Travelling Crane dan menempat 1.1 Crane Menabrak 1.1.1 Pastikan hanya 1 ( satu ) Orang yang memberikan Operator Crane
kan Crane Signal
( Set Up Crane ) (aba-aba) pada operator crane dan kelihatan jelas.

1.1.2 Pastikan jalan masuk Crane pada area kerja

1.1.3 Pastikan keadaan tanah penempatan crane

1.2 Amblas 1.2.1 Berikan ganjalan pada alas out rigger Crane atau Track
Gunakan kayu yang keras sesuai dengan kebtuhan.

1.3 Crane Terbalik 1.3.1 Jaga jarak aman saat memposisikan crane di pinggir
Jurang
1.3.2 Pastikan dan ikuti Procedure pengoperasian
crane.
Page 1 of 7
JOB SAFETY AND ENVIRONMENT ANALYSIS
PT. XXXXXXX

PROJECT : Location Of Work :

JOB DESCRIPTION : Unloading Pipe and Loading to Trailler/Truck.


Unloading pipe and Transfer to pipe yard Tanggal :

Analysis By :
 New x JSA NO.
Reviewed By :
 Revised Date :
Approved By : Page No : 2 of 7

Standard Requirement : Permit To Work, JSA harus dibacakan sebelum mulai kerja
Standard PPE : Safety Shoes – Safety Helmet – Safety Glass - Coverall
Special Precuation : Jika cuaca buruk STOP Aktifitas

1.4 Crane Terkena Jaringan 1.4.1 Periksa jaringan listrik disekitar slewing crane dan Saat
arus listrik traveling crane
1.4.2 Pastikan Radius Boom crane dengan Cable Listrik
( min 6 meter )
1.4.3 Bebas dari area keluar masuk alat dari aliran
listrik

2. Posisikan Trailler/ 2.1 Menabrak 2.1.2 Periksa type permukaan tanah dan jalan masuk Alat. Forenam Rigger
Crane Truck
2.1.3 Pastikan disekeliling Lokasi jalan keluar masuk alat

Page 2 of 7
JOB SAFETY AND ENVIRONMENT ANALYSIS
PT. XXXXXXX

PROJECT : Location Of Work :

JOB DESCRIPTION : Unloading Pipe and Loading to Trailler/Truck.


Unloading pipe and Transfer to pipe yard Tanggal :

Analysis By :
 New x JSA NO.
Reviewed By :
 Revised Date :
Approved By : Page No : 3 of 7

Standard Requirement : Permit To Work, JSA harus dibacakan sebelum mulai kerja
Standard PPE : Safety Shoes – Safety Helmet – Safety Glass - Coverall
Special Precuation : Jika cuaca buruk STOP Aktifitas

2.2 Terbalik 2.2.1 Pastikan tumpukan material saat mengangkat dengan


Aman.

2.2.2 Jangan memasukkan tangan pada selah-selah pipa Yang


akan tersusun.
Saat material yang akan diangkat.

2.3 Pipa terguling 2.3.1 Pastikan penyusunan pipa dengan cara yang
aman dan tempatkan pipa dias trailer dengan
susunan 3 lapisan ( 3 diatas bak ,2 ditengah dan 1
diatas Pasang lashing terlebih dahulu baru slings
pada Hook crane dibuka.

2.3.2 Pastikan setiap tumpuan material yang akan


diangkat Bebas dari tindihan material yang
lainnya.

Page 3 of 7
JOB SAFETY AND ENVIRONMENT ANALYSIS
PT. XXXXXXX

PROJECT : Location Of Work :

JOB DESCRIPTION : Unloading Pipe and Loading to Trailler/Truck.


Unloading pipe and Transfer to pipe yard Tanggal :

Analysis By :
 New x JSA NO.
Reviewed By :
 Revised Date :
Approved By : Page No : 4 of 7

Standard Requirement : Permit To Work, JSA harus dibacakan sebelum mulai kerja
Standard PPE : Safety Shoes – Safety Helmet – Safety Glass - Coverall
Special Precuation : Jika cuaca buruk STOP Aktifitas

3. Memasang Hook dan Sling 3.1 Tangan terjepit 3.1.1 Operator harus megikuti Procedure Pre Start Check Rigger
pada pipa yang akan List
diangkat 3.1.2 Gunakan Radius pengangkatan sesuai dengan
Loadchart crane
3.1.3 Pastikan material yang akan diangkat tidak
Menyangkut pada benda lain ( bebas )
3.1.4 Pastikan berat pipa dan panjang pipa yang akan diangkat
oleh crane.

3.2 Tertindih material 3.2.1 Gunakan tage lines dan pemasangan yang benar,
dan Dipegang bagi orang yang berkompetent.

4. Mengangkat pipa dengan 4.1. Crane Terbalik 4.1.1 Tidak dibenarkan berdiri dan melintas dibawah Supervisor
alat angkat crane. material yang akan diangkat.

Page 4 of 7
JOB SAFETY AND ENVIRONMENT ANALYSIS
PT. XXXXXXX

PROJECT : Location Of Work :

JOB DESCRIPTION : Unloading Pipe and Loading to Trailler/Truck.


Unloading pipe and Transfer to pipe yard Tanggal :

Analysis By :
 New x JSA NO.
Reviewed By :
 Revised Date :
Approved By : Page No : 5 of 7

Standard Requirement : Permit To Work, JSA harus dibacakan sebelum mulai kerja
Standard PPE : Safety Shoes – Safety Helmet – Safety Glass - Coverall
Special Precuation : Jika cuaca buruk STOP Aktifitas

4.2 Material tertabrak 4.2.1 Gunakan Signal crane yang jelas dan tepat pada
Operator

4.3 Tertimpa material 4.3.1 Gunakan tage line bila memegang dan dipasang
pada Posisi material yang akan diangkat.

5. Unloading Pipe di Area truck


Lines area 5.1 Material Jatuh /Pipa 5.1.1 Pastikan Hook Sling telah terpasang sebelum Supervisor
Lashing pada trailler dibuka.

5.2 Terpeleset. 5.2.1 Pastikan posisi berdiri saat memasang Hook pada Pipa .

5.3.1 Pastikan Stand Pipa telah tersusun dengan rapi


5.3 Pipa terguling danDengan penyangga yang aman.

Page 5 of 7
JOB SAFETY AND ENVIRONMENT ANALYSIS
PT. XXXXXXX

PROJECT : Location Of Work :

JOB DESCRIPTION : Unloading Pipe and Loading to Trailler/Truck.


Unloading pipe and Transfer to pipe yard Tanggal :

Analysis By :
 New x JSA NO.
Reviewed By :
 Revised Date :
Approved By : Page No : 6 of 7

Standard Requirement : Permit To Work, JSA harus dibacakan sebelum mulai kerja
Standard PPE : Safety Shoes – Safety Helmet – Safety Glass - Coverall
Special Precuation : Jika cuaca buruk STOP Aktifitas

6. Kebersihan lingkungan 6.1 Tertusuk paku, tersandung 6.1.1 Pastikan area kerja bersih dan bebas dari sampah. Seluruh Crew.
6.1.2 House keeping setelah habis kerja.
6.1.3 Peralatan tersusun rapi selesai pekerjaan.

Page 6 of 7

You might also like