You are on page 1of 4

(Amended / Revised Clause on Page No 4.

Please Refer)
CIU tS01001,*l?01 5SGC2@014
F6r*a rrtnrq tilH d,ift{H ftrftts
B MAHARASHTBA METRO RAII GORPORATIO]I TIMITEII
qrd rrcm wft qErirq {Ir$nqr dgw vwr
Joint Venture of Govt. of lndia & Govt. of Maharashtra
PUM MHnl PUIIE iIETRO RAII PROJEGT

Maha Metro/Pune. PL|RUNOC/Corrigendum/2019 Date:10.04.2O19

CORRIGENDUM

Sub: Amendment in Guidelines for issue of N.O.C. for the properties lying along/adjoining
the MRTS corridors.

Ref: 1. Maha Metro NOC Circular No. NMRC/plg/NOC/Metro-Corridor/2jl7/257, Dt


28.03.2018.

Clause No. 1.3.L(ii) of above referred Circular is amended as follows,

Clause No. Existing Clause Amended/Revised Clause

L.3.1(ii) "No Projection shall be ollowed in "No Projection/construction shall he


the setback except steps ot ground dllowed within 6 mtr. from road
level. The setback should be clear to (Right oI Woy) in setbock except
sky." steps at ground level,"

This issues with the approvalof The Competent Authority

@,J
Executive Director to,y''2
oll
(Planning)

Copy to: -

t PSto MD, for kind information of MD please.


2 DP, DRS&S / DF for kind information please.
3 All the HODs and Dy. HODs, Maha Metro for kind information and necessary
action please.
4. GM (HR/PR) for uploading on website of Maha Metro and internet.
5. AM (HR) Nagpur, for circulation in Nagpur office.
6. Office order file
7. Notice board of allthe offices of Maha Metro.

You might also like