You are on page 1of 1

MATERIAL ESTIMATES

PROJECT TITLE: ROOMS RENOVATION


LOCATION: COE 11, COE 31, COE 32, ESEP 11, ESEP 22 and ESEP31)
OWNER: TUP-Manila

1. CARPENTRY WORKS

1.1 Ceiling (ESEP 11) Area= 70 sqm.


DESCRIPTION QTY UNIT UNIT COST AMOUNT
Ficem Board 25 pcs
Carrying Channel 50 pcs
Furring Channel 100 pcs
Wall Angle 30 pcs
Hunger w/ Accessories 30 sets
Tox Plastic Anchor 100 pcs
Flat Head Screw 300 pcs

1.2 Partition Wall (ESEP 22) Area= 35 sqm.


DESCRIPTION QTY UNIT UNIT COST AMOUNT
Ficem Board 24 pcs
Metal Stud 150 pcs
Blind Rivet 300 pcs
Flat Head Screw 400 pcs
Tox Plastic Anchor 50 pcs

2. TILEWORK

2.1 Flooring (ESEP 11, 22, 31) Area= 156 sqm.


DESCRIPTION QTY UNIT UNIT COST AMOUNT
12" x 12" Vinly Tiles 1730 pcs
Rugby 6 gal

3. PAINTING WORKS

3.1 Walls & Ceiling (Rooms: ESEP 11, 22, 31) Area= 680 sqm.
DESCRIPTION QTY UNIT UNIT COST AMOUNT
Flat Latex for 1st and 2nd Coat 40 gal
Sanding Paper #180 : 30 pcs

4. ELECTRICAL WORKS

4.1 Electrical Wirings & Accessories (Rooms: ESEP


11, 22 & 31 & COE 11, 31 & 32)
DESCRIPTION QTY UNIT UNIT COST AMOUNT
AWG #12 THHN 1 box
uPVC Electric Wire Moulding w/ Clips 20 sets
Two Gang Convinience Outlet 2 pcs
Switch 2 pcs
Flourescent Lamp 50 pcs
Flourescent Housing w/ Holder 8 Sets

4.2 ELECTRICAL APPLIANCES


DESCRIPTION QTY UNIT UNIT COST AMOUNT
Ceiling Fan (New) 4 pcs
Ceiling Fan (For Repair) 8 pcs
Wall Fan 4 pcs
Aircon 3 pcs

5. OTHERS

DESCRIPTION QTY UNIT UNIT COST AMOUNT


Door Knob (ESEP 31) 1 pcs
White Board (ESEP 22) 2 pcs
High Stool (COE 31) 40 pcs

You might also like