Sync Check
Gustav Steynberg
© Siemens AG 2008
Energy Sector
Autoreclosing and synchronism-check
Sync. release
>Fault detection for AR
AUTO-
>TRIP L1 for AR
RECLO- SYNCHRO-
>TRIP L2 for AR
SURE
AR sync. request CHECK
>TRIP L3 for AR
© Siemens AG 200816.10.97
engerawe8
Energy Automation Energy Sector
Automatic reclosure: Summary
© Siemens AG 200806.08.97
dtgerawe1
Energy Automation Energy Sector
Example Signal exchange with 2 ARC devices
Protection functions
512 Relay trip 1pol. L1 Relay trip 1pol. L1 512
515 Relay trip L123 Relay trip L123 515
513 Relay trip 1pol. L2 Relay trip 1pol. L2 513
515 Relay trip L123 Relay trip L123 515
514 Relay trip 1pol. L3 Relay trip 1pol. L3 514
383 >enable AR zones (Z1B...) >enable AR zones (Z1B...)383
382 >only 1ph AR allowed >only 1ph AR allowed 382
381 >1pol trip allowed from ext. >1pol trip allowed from ext 381
2889... Release ARC trip zone Release ARC trip zone 2889...
Automatic reclosure
Automatic reclosure
2864 AR 1p trip permission AR 1p trip permission 2864
2711 >ext Start of ARC >ext Start of ARC 2711
2712 >Trip L1 for ARC >Trip L1 for ARC 2712
2713 >Trip L2 for ARC >Trip L2 for ARC 2713
2714 >Trip L3 for ARC >Trip L3 for ARC 2714
06.08.97
dtgerawe2
© Siemens AG 2008
Energy Automation Energy Sector
Automatic reclosure with two cycles
Pick-up
Trip
Close
command
1st dead time 2 nd dead time
T-close
Reclaim time
T recaim
ARC zone released
Z1B active (typical)
© Siemens AG 200806.08.97
dtgerawe11
Energy Automation Energy Sector
Reduced Dead Time (RDT)
S2
S1 CB-A CB-B CB-C
F1 F2
7SA
Z1B
At A the Z1B is released prior to 1st AR cycle (para 1357)
All faults (F1) along line A-B are tripped without delay with Z1B at
CB-A
Non-selective trip for external fault (F2) is possible, but AR will be
carried out
With RDT, the dead time following non-selective trip can be
minimised. CB-A is reclosed when return voltage from S2 via CB-
B is detected at A after CB-C opens.
© Siemens AG 2008
Energy Automation Energy Sector
Adaptive Dead Time (ADT)
S1 CB-A S2
CB-B
F1
7SA
Z1B
At A and B faults along the line are cleared by stepped distance
and tele-protection
At B the AR is applied with a fixed dead time
At A the AR is applied with ADT
When return voltage is detected at A from S2 via CB-B following
successful reclosure at B, the reclose command to CB-A is given
If the AR at B is not successful because fault F1 is permanent,
the ADT will not detect return voltage at A and reclosure onto the
fault is prevented at A
© Siemens AG 2008
Energy Automation Energy Sector
Dead Line Check (DLC)
Windpark
S1 CB-A S2
CB-B
F1
7SA
Z1B
© Siemens AG 2008
Energy Automation Energy Sector
SIPROTEC 4
Distance protection 7SA
*
1-pole Trip
3-pole
Close
Trip
1st 2nd
t1 dead time t2 dead time tgrading
© Siemens AG 2008
Energy Automation Energy Sector
Synchronism-check
rameters measurement
f asynchronous switching (0.03 ... 1 Hz) - for dead line check all three phases
are controlled
(1° ... 60°)
© Siemens AG 200816.10.97
engersyn1
Energy Automation Energy Sector
Sync Check Request
SYNC
External: Binary Input Settings used
Internal
ARC ARC
Control Function Manual Close
© Siemens AG 2008