1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

.D
A B C D E
A 745 4,395 4,395 4,395 4,395
_
745
1 2 A

.B
200
435 2,500 435
300 245 4,395 4,395 4,395 4,395 745
60 60
150 450 2,050 450 150
18,465 +0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0

200 18,065 200

425
200 20 20

480
[-470.0] Foundation Plates' Top ▼ ▼ Foundation Plates' Top [-470.0]
300 450 3,945 450 3,945 450 3,945 450 3,940 450 200 305
B [-480.0] Columns/Pedestals' Top ▼ ▼ Columns/Pedestals' Top [-480.0] B

60 150
65

65

65

65
150

150
500

500
65
150

60

150

900
2 2
450

450
150
285

65 60 450 2,050 450 60 150

[-1,380.0] Footings' Top ▼ ▼ Footings' Top [-1,380.0]

350
2,500

2,500
.A .A [-1,730.0] Blinding Footing Top ▼
2,500

3,370

3,070

2,050

2,050

3,070

3,370
C ▼ Blinding Footing Top [-1,730.0] C

100
[-1,830.0] Excavation 01 (Footings) ▼ 3,700 ▼ Excavation 01 (Footings)[-1,830.0]

STRUCTURAL LAYOUT_ SECTION VIEW 'B'-'B'


285

1 1
450

450
GENERAL LAYOUT SCALE 1:25

150

150

150
500

500
150

60
150

150
DETAILING ALL STRUCTURAL MEMBERS: FOOTINGS | COLUMNS/PEDESTALS | RETAINING WALL | SIDE WALL | MANHOLE PIT & COVER | EDGE PROTECTION | MANHOLE PLATE | FOUNDATION PLATE
60
65

215

65

65

65
D D

600
150
750
20 20
200 450 3,945 450 3,945 450 1,530 150 600 150 1,515 450 3,940 450 200

200 10,790 150 600 150 6,375 200

18,465

.B
E 4,395 4,395 4,395 4,395 E
_

.D
A B C D E

STRUCTURAL LAYOUT_ FLOOR PLAN


GENERAL LAYOUT SCALE 1:40
DETAILING PROPOSED ALL STRUCTURAL MEMBERS: FOOTINGS | COLUMNS/PEDESTALS | RETAINING WALL | SIDE WALL | MANHOLE PIT & COVER | EDGE PROTECTION | MANHOLE PLATE | FOUNDATION PLATE
F F

G STRUCTURAL LAYOUT_ BASIC 3D CUTOUT VIEW [Cut Plane: Grid 'B'] G


GENERAL LAYOUT SCALE : N/A
DETAILING ALL STRUCTURAL MEMBERS: FOOTINGS | COLUMNS/PEDESTALS | RETAINING WALL | SIDE WALL | MANHOLE PIT & COVER | EDGE PROTECTION | MANHOLE PLATE | FOUNDATION PLATE

2 1
435 2,500 1,185
H H
150 60 450 2,050 450 60 900
+0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0

480
[-470.0] Foundation Plates' Top ▼ ▼ Foundation Plates' Top [-470.0]
[-480.0] Columns/Pedestals' Top ▼ ▼ Columns/Pedestals' Top [-480.0]

I I

900

2,080
Slope: 1:100
[-1,380.0] Footings' Top ▼

350
▼ [-1,480.0] Excavation 02 (Mass conc Slab)
[-1,730.0] Blinding Footing Top ▼

STRUCTURAL LAYOUT_ BASIC ISOMETRIC TOP VIEW

1,025
100
[-1,830.0] Excavation 01 (Footings) ▼ ▼ Footings' Top [-2,080.0]
J GENERAL LAYOUT SCALE 1:40 J
DETAILING ALL STRUCTURAL MEMBERS: FOOTINGS | COLUMNS/PEDESTALS | RETAINING WALL | SIDE WALL | MANHOLE PIT & COVER | EDGE PROTECTION | MANHOLE PLATE | FOUNDATION PLATE

350
▼ Blinding Footing Top [-2,430.0]
A B C D _ E

100

100
20
445 4,395 4,395 4,395 4,395 440 20 950 2,370 1,000 ▼ Excavation 01 (Footings)[-2,530.0]

200 450 3,945 450 3,945 225 225 3,945 450 3,940 450 200
+0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0

STRUCTURAL LAYOUT_ SECTION VIEW 'D'-'D'


425

200
[-470.0] Foundation Plates' Top ▼ 4,340 300
▼ Foundation Plates' Top [-470.0]
K [-480.0] Columns/Pedestals' Top ▼ ▼ Columns/Pedestals' Top [-480.0]
GENERAL LAYOUT SCALE 1:25 K
DETAILING ALL STRUCTURAL MEMBERS: FOOTINGS | COLUMNS/PEDESTALS | RETAINING WALL | SIDE WALL | MANHOLE PIT & COVER | EDGE PROTECTION | MANHOLE PLATE | FOUNDATION PLATE

1,500 2,890 1,500 2,895 1,500 Slope: 1:100 2,895 Slope: 1:100 1,500 2,890 1,500
[-1,380.0] Footings' Top ▼ ▼ Footings' Top [-1,380.0]

[-1,730.0] Blinding Footing Top ▼ [-1,480.0] Excavation 02 (Mass conc Slab) ▼ [-1,480.0] Excavation 02 (Mass conc Slab) ▼ [-1,480.0] Excavation 02 (Mass conc Slab) ▼ [-1,480.0] Excavation 02 (Mass conc Slab) ▼ ▼ Blinding Footing Top [-1,730.0]

[-1,830.0] Excavation 01 (Footings) ▼ 1,700 2,690 1,700 2,695 1,700 2,695 1,700 2,690 1,700 ▼ Excavation 01 (Footings)[-1,830.0]

_
L STRUCTURAL LAYOUT_ SECTION VIEW 'A'-'A' L
GENERAL LAYOUT SCALE 1:40
DETAILING ALL STRUCTURAL MEMBERS: FOOTINGS | COLUMNS/PEDESTALS | RETAINING WALL | SIDE WALL | MANHOLE PIT & COVER | EDGE PROTECTION | MANHOLE PLATE | FOUNDATION PLATE

M M

N N

STRUCTURAL LAYOUT_ BASIC 3D CUTOUT VIEW [Cut Plane: Section 'D' -'D']
GENERAL LAYOUT SCALE : N/A
DETAILING ALL STRUCTURAL MEMBERS: FOOTINGS | COLUMNS/PEDESTALS | RETAINING WALL | SIDE WALL | MANHOLE PIT & COVER | EDGE PROTECTION | MANHOLE PLATE | FOUNDATION PLATE

O Project Name: DRURY'S WEIGHBRIDGE STRUCTURE [CIVIL WORKS] No. Description Date O
CONTRACTOR: DEUB ENGINEERING STRUCTURAL ENGINEERS: Essae Digitronics Pvt Ltd

DRAWN BY: DESIGN AFFILIATES:


STRUCTURAL LAYOUT_ BASIC 3D CUTOUT VIEW [Cut Plane: -255mm from Grid '1'] DEUB ENGINEERING SOLUTIONS MIKAB C.M. LTD
P.O.Box 2076, Kla - Ug
GENERAL LAYOUT SCALE : N/A P.O.Box 983, Jinja - Uganda, E.A mikabcm@gmail.com
DETAILING ALL STRUCTURAL MEMBERS: FOOTINGS | COLUMNS/PEDESTALS | RETAINING WALL | SIDE WALL | MANHOLE PIT & COVER | EDGE PROTECTION | MANHOLE PLATE | FOUNDATION PLATE deubeng@gmail.com | +256 - 200 - 928941 +256 - 39 - 3236406

GENERAL NOTES SPECIFIC NOTES Sign : DESIGN STAGE: CONSTRUCTION References :TSD-CV-STDR-42
1. This drawing is ONLY for construction references 1. FOUNDATIONS 2. CONCRETE MIXES 3. REINFORCEMENT 4. MINIMUM COVER TO REINF. IN 5. ABBREVIATIONS 6. OTHER NOTES Designed by : Verified : Approved : File : Date : Rev. Date:
P 2. Original Structural drawings by Essae supersedes this They shall generally be taken 1200mm min. below existing ground level Reinforced concrete to have a (a) Ribbed bars (>500N/mm²) to be Ribbed cold formed (a) Foundations = 50mm M.C = Mass Concrete All dimensions to be confirmed on site. D.E.S __ __ 10401 OCT.2022 CLIENT: DRURY AGRO PROCESSING LTD P
construction drawing incase of any Clarification. after removal of organic layer and all excavations to be confirmed by min. works cube strength of bars to BS4449 / IS:1786 and are marked "T" on these dwgs (b) Beams = 30mm R.C = Reinforced Concrete
CONSTRUCTION DRAWING: LOCATION: KAMPALA - UGANDA
TITLE:
CONSTRUCTION DRAWINGS: GENERAL OVERVIEW
3. This drawing is STRICTLY copyrighted to the designer. the Engineer before concrete blinding is laid. 25N/mm² at 28 days with 20mm (b) Any Mild steel bars (250N/mm²) marked "R" on these (c) Columns/ Pedestals = 40mm T = Top This drawing must be read in FOOTINGS, COLUMNS/PEDESTALS, RETAINING WALL
2. The designer takes no obligation for any faults and errors Weak pockets of bearing strata to be dug out and filled with 1:4:8 max. aggregate size dwgs to be round bars to BS4483 (d) Retaining Wall = 25mm B = Bottom conjunction with the original Structural FOUNDATION GUIDE DETAILS Dwg No.: 10401DWB/CD/01.01
in the Structural design on this project. Essae's Civil EXCAVATIONS & REINFORCED CONCRETE DETAILS: Revision:Sheet:
mass concrete. (c) Structural steel shall confirm to IS: 2062 drawings from Essae. Project No.:
Structural Drawings (STD-CV-STDR-42) takes precedence. [REFER TO INDICATED TITLES] 10401DWB/CD 00 01 of 05 A0 Scale AS INDICATED

GSPublisherVersion 0.0.100.100
1 2 3 4 5 6 7 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

.D
A B C D E
A
1 2 A

.B
600 2,500 600

845 4,395 4,395 4,395 4,395 845


+0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0
19,270

1,700 2,690 1,700 2,695 1,700 2,695 1,700 2,690 1,700


B B

65

65

65

65
-1.830

600

600
Excavation
-1.830

950

950

950
Bottom

1,830
2 Excavation
Bottom -1.830 -1.830 2
Excavation Excavation
Bottom Bottom

2,620
-1.830 -1.480 -1.830
-1.480 3,700
2,500

3,700

1,670

1,670

1,670

3,700

2,500
C .A -1.830 -1.480 Excavation -1.830 Excavation Excavation -1.830 .A C
Excavation
Excavation Excavation Bottom
Bottom
Excavation
Bottom Bottom -1.480 Excavation
Bottom Bottom Bottom Excavation Bottom
Bottom
[-1,830.0] Excavation 01 (Footings) ▼ 3,700 ▼ Excavation 01 (Footings)[-1,830.0]

-1.830 -1.830 SPECIFIC EXCAVATION LAYOUT_ SECTION VIEW 'B'-'B'

700
1,015

Excavation
1 Excavation
1

950

950
-1.830 -1.830 Bottom Bottom -1.830 EARTHWORKS SCALE 1:25
600

600
Excavation Excavation SLOPE RATIO, EXTERNAL MEASUREMENTS & LEVEL OF PRECISION FOR ONSITE EXCAVATION MAY DEFER DEPENDING ON GROUND CONDITIONS AND APPLICABLE WORK METHODS

315
Excavation
Bottom Bottom

65

65
Bottom
D D

685

685
-2.530
Excavation
Bottom
1,700 2,690 1,700 2,695 1,700 1,055 600 1,040 1,700 2,690 1,700

11,290 1,100 6,880

19,270

.B
E 845 4,395 4,395 4,395 4,395 845 E
A B C D E

.D
SPECIFIC EXCAVATION LAYOUT_ FLOOR PLAN
EARTHWORKS SCALE 1:40
SLOPE RATIO, EXTERNAL MEASUREMENTS & LEVEL OF PRECISION FOR ONSITE EXCAVATION MAY DEFER DEPENDING ON GROUND CONDITIONS AND APPLICABLE WORK METHODS
F F

G SPECIFIC EXCAVATION LAYOUT_ BASIC 3D CUTOUT VIEW [Cut Plane: Grid 'B'] G
EARTHWORKS SCALE : N/A
SLOPE RATIO, EXTERNAL MEASUREMENTS & LEVEL OF PRECISION FOR ONSITE EXCAVATION MAY DEFER DEPENDING ON GROUND CONDITIONS AND APPLICABLE WORK METHODS

2 1
2,500
H H
+0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0

1,480

1,480
I 4,320 I

1,830

2,530
350
SPECIFIC EXCAVATION LAYOUT_ BASIC ISOMETRIC TOP VIEW

1,050
[-1,830.0] Excavation 01 (Footings) ▼
J EARTHWORKS SCALE 1:40 J
SLOPE RATIO, EXTERNAL MEASUREMENTS & LEVEL OF PRECISION FOR ONSITE EXCAVATION MAY DEFER DEPENDING ON GROUND CONDITIONS AND APPLICABLE WORK METHODS

A B C D E
4,395 4,395 4,395 4,395
950 2,370 1,000 ▼ Excavation 01 (Footings)[-2,530.0]
19,270
+0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0

SPECIFIC EXCAVATION LAYOUT_ SECTION VIEW 'D'-'D'


K EARTHWORKS SCALE 1:25 K
1,480

1,480

1,480

1,480

1,480

1,480
1,830

1,830

1,830

1,830
SLOPE RATIO, EXTERNAL MEASUREMENTS & LEVEL OF PRECISION FOR ONSITE EXCAVATION MAY DEFER DEPENDING ON GROUND CONDITIONS AND APPLICABLE WORK METHODS

[-1,480.0] Excavation 02 (Conc. Slab) ▼ ▼ Excavation 02 (Conc. Slab) [-1,380.0]


350

350

350
[-1,830.0] Excavation 01 (Footings) ▼ 1,700 2,690 1,700 2,695 1,700 2,695 1,700 2,690 1,700 ▼ Excavation 01 (Footings)[-1,830.0]

L SPECIFIC EXCAVATION LAYOUT_ SECTION VIEW 'A'-'A' L


EARTHWORKS SCALE 1:40
SLOPE RATIO, EXTERNAL MEASUREMENTS & LEVEL OF PRECISION FOR ONSITE EXCAVATION MAY DEFER DEPENDING ON GROUND CONDITIONS AND APPLICABLE WORK METHODS

M M

N N

SPECIFIC EXCAVATION LAYOUT_ BASIC 3D CUTOUT VIEW [Cut Plane: Section 'D' -'D']
EARTHWORKS SCALE : N/A
SLOPE RATIO, EXTERNAL MEASUREMENTS & LEVEL OF PRECISION FOR ONSITE EXCAVATION MAY DEFER DEPENDING ON GROUND CONDITIONS AND APPLICABLE WORK METHODS

O Project Name: DRURY'S WEIGHBRIDGE STRUCTURE [CIVIL WORKS] No. Description Date O
CONTRACTOR: DEUB ENGINEERING STRUCTURAL ENGINEERS: Essae Digitronics Pvt Ltd

DRAWN BY: DESIGN AFFILIATES:


SPECIFIC EXCAVATION LAYOUT_ BASIC 3D CUTOUT VIEW [Cut Plane: -255mm from Grid '1'] DEUB ENGINEERING SOLUTIONS MIKAB C.M. LTD
P.O.Box 2076, Kla - Ug
EARTHWORKS SCALE : N/A P.O.Box 983, Jinja - Uganda, E.A mikabcm@gmail.com
SLOPE RATIO, EXTERNAL MEASUREMENTS & LEVEL OF PRECISION FOR ONSITE EXCAVATION MAY DEFER DEPENDING ON GROUND CONDITIONS AND APPLICABLE WORK METHODS deubeng@gmail.com | +256 - 200 - 928941 +256 - 39 - 3236406

GENERAL NOTES SPECIFIC NOTES Sign : DESIGN STAGE: CONSTRUCTION References :TSD-CV-STDR-42
1. This drawing is ONLY for construction references 1. FOUNDATIONS 2. CONCRETE MIXES 3. REINFORCEMENT 4. MINIMUM COVER TO REINF. IN 5. ABBREVIATIONS 6. OTHER NOTES Designed by : Verified : Approved : File : Date : Rev. Date:
P 2. Original Structural drawings by Essae supersedes this They shall generally be taken 1200mm min. below existing ground level Reinforced concrete to have a (a) Ribbed bars (>500N/mm²) to be Ribbed cold formed (a) Foundations = 50mm M.C = Mass Concrete All dimensions to be confirmed on site. D.E.S __ __ 10401 OCT.2022 CLIENT: DRURY AGRO PROCESSING LTD P
construction drawing incase of any Clarification. after removal of organic layer and all excavations to be confirmed by min. works cube strength of bars to BS4449 / IS:1786 and are marked "T" on these dwgs (b) Beams = 30mm R.C = Reinforced Concrete
CONSTRUCTION DRAWING: LOCATION: KAMPALA - UGANDA
TITLE:
CONSTRUCTION DRAWINGS: EARTH WORKS
3. This drawing is STRICTLY copyrighted to the designer. the Engineer before concrete blinding is laid. 25N/mm² at 28 days with 20mm (b) Any Mild steel bars (250N/mm²) marked "R" on these (c) Columns/ Pedestals = 40mm T = Top This drawing must be read in BASIC GUIDING PARAMETERS FOR EXCAVATIONS
2. The designer takes no obligation for any faults and errors Weak pockets of bearing strata to be dug out and filled with 1:4:8 max. aggregate size dwgs to be round bars to BS4483 (d) Retaining Wall = 25mm B = Bottom conjunction with the original Structural FOUNDATION GUIDE DETAILS Dwg No.: 10401DWB/CD/01.02
in the Structural design on this project. Essae's Civil EXCAVATIONS & REINFORCED CONCRETE DETAILS: Revision:Sheet:
mass concrete. (c) Structural steel shall confirm to IS: 2062 drawings from Essae. Project No.:
Structural Drawings (STD-CV-STDR-42) takes precedence. [REFER TO INDICATED TITLES] 10401DWB/CD 00 02 of 05 A0 Scale AS INDICATED

GSPublisherVersion 0.0.100.100
1 2 3 4 5 6 7 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

.D
A B C D E
A
1 2 A

.B
600 2,500 600

845 4,395 4,395 4,395 4,395 845

24xØ8/147 top
28xØ10/100 top

28xØ10/100 top

28xØ10/100 top

28xØ10/100 top

28xØ10/100 top

28xØ10/100 top

28xØ10/100 top

28xØ10/100 top
5xØ8/150 top

5xØ8/150 top

5xØ8/150 top

5xØ8/150 top
5xØ8/150 top

5xØ8/150 top

5xØ8/150 top

5xØ8/150 top
+0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0
19,270

l=1.50m
l=2.95m

l=2.95m

l=2.95m

l=2.95m
l=2.95m

l=2.95m

l=2.95m

l=2.95m
l=0.80m

l=0.80m

l=0.80m

l=0.80m

l=0.80m

l=0.80m

l=0.80m

l=0.80m
1,700 2,690 1,700 2,695 1,700 2,695 1,700 2,690 1,700
B B

11

11

11

11

1
11

11

11

11
10

10

10

10

10

10

10

10
65

65

65

65

65
-1.730
600

600
Blinding
-1.730 -1.730 -1.730

1,730
950

950

950

950

950
Blinding Blinding

1,830
2 Top
Top
Blinding
Top
Top 2
24xØ8/147 top 24xØ8/147 top
24xØ8/147 top 1 1
1 l=1.50m 35xØ10/100 top l=1.50m
3
24xØ8/147 top
1 -1.730 3
35xØ10/100 top l=1.50m
3
35xØ10/100 top l=1.50m
2
-1.730 top 3 35xØ10/100 top
10xØ8/150 -1.730 3
35xØ10/100 top
l=1.50m l=1.50m l=1.50m 15xØ10/96 top Blinding
l=3.50m l=1.50m l=1.50m
Blinding -1.730 -1.730 Blinding
2,500

3,700

1,670

1,670

1,670

1,670

1,670

3,700

2,500
.A 4 .A
C Top 15xØ10/96 top Blinding 15xØ10/96 top Blinding
l=3.50m
5xØ8/150 top
Top
15xØ10/96 top Top 15xØ10/96 top [-1,730.0] Blinding Footing Top ▼ ▼ Blinding Footing Top [-1,730.0]
C
4 10xØ8/150 top Top 4 12 5xØ8/150 top 4 4
10xØ8/150 top l=3.50m 2 l=3.50m Top l=1.25m l=3.50m l=3.50m
2 12
l=3.50m 10xØ8/150 top l=1.25m

100
l=3.50m 5xØ8/150 top
2 12 3,700 ▼ Excavation 01 (Footings)[-1,830.0]
l=3.50m 1,055 l=1.25m600 1,04012 5xØ8/150 top [-1,830.0] Excavation 01 (Footings) ▼
5xØ8/150 top l=1.25m

STRUCTURAL LAYOUT_ SECTION VIEW 'B'-'B'


13
l=0.90m
-1.730 -1.730 -1.730 -1.730
-1.730 Blinding
1 1

285
950

950

950

950

950
Blinding Blinding Blinding
Top
Blinding
Top Top
Top
CONC. BLINDING & BASIC REINFORCEMENT OVERVIEW SCALE 1:25
600

600
Top PLAIN CONCRETE BLINDING & BASIC REINFORCEMENT FOR: FOOTINGS OF THE COLUMNS/PEDESTALS, RETAINING & SIDE WALLS, MANHOLE PIT. Reinforcement details exclude cover and rebar layer spacers.

12xØ10/100 top 315


65

65

1065

65

65
1,000
D -2.430 D
10

10

10

10

10

10

10

10

10
11

11

11
11

11

11
685

2
Blinding
28xØ10/100 top

28xØ10/100 top

28xØ10/100 top

28xØ10/100 top

12xØ10/100 top

12xØ10/100 top

12xØ10/100 top

28xØ10/100 top

28xØ10/100 top
l=0.80m

l=0.80m

l=0.80m

l=0.80m

l=0.80m

l=0.80m

l=0.80m

l=0.80m

l=0.80m

l=0.80m
5xØ8/150 top

5xØ8/150 top

5xØ8/150 top
l=2.95m

l=2.95m

l=2.95m
5xØ8/150 top

5xØ8/150 top

5xØ8/150 top
l=2.95m

l=2.95m

l=2.95m

10xØ8/150 top
l=3.50m
Top

805 1,100 790

13
10

10

5xØ8/150 top
l=0.90m
9xØ10/100 top

9xØ10/100 top
l=0.80m

l=0.80m
1,700 2,690 1,700 2,695 1,700 1,055 600 1,040 1,700 2,690 1,700

.B
E E

A B C D E

.D
STRUCTURAL LAYOUT_ FLOOR PLAN
CONC. BLINDING & BASIC REINFORCEMENT OVERVIEW SCALE 1:40
PLAIN CONCRETE BLINDING & BASIC REINFORCEMENT FOR: FOOTINGS OF THE COLUMNS/PEDESTALS, RETAINING & SIDE WALLS, MANHOLE PIT. Reinforcement details exclude cover and rebar layer spacers.
F F

G STRUCTURAL LAYOUT_ BASIC 3D CUTOUT VIEW [Cut Plane: Grid 'B'] G


CONC. BLINDING & BASIC REINFORCEMENT OVERVIEW SCALE : N/A
PLAIN CONCRETE BLINDING & BASIC REINFORCEMENT FOR: FOOTINGS OF THE COLUMNS/PEDESTALS, RETAINING & SIDE WALLS, MANHOLE PIT. Reinforcement details exclude cover and rebar layer spacers.

2 1
2,500
H H
+0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0

1,480

1,480
I I

1,830

2,530
350
[-1,730.0] Blinding Footing Top ▼

STRUCTURAL LAYOUT_ BASIC ISOMETRIC TOP VIEW

1,050
[-1,830.0] Excavation 01 (Footings) ▼
J CONC. BLINDING & BASIC REINFORCEMENT OVERVIEW SCALE 1:40 J
PLAIN CONCRETE BLINDING & BASIC REINFORCEMENT FOR: FOOTINGS OF THE COLUMNS/PEDESTALS, RETAINING & SIDE WALLS, MANHOLE PIT. Reinforcement details exclude cover and rebar layer spacers.
▼ Blinding Footing Top [-2,430.0]

A B C D E
4,395 4,395 4,395 4,395 950 2,370 1,000 ▼ Excavation 01 (Footings)[-2,530.0]

+0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0

STRUCTURAL LAYOUT_ SECTION VIEW 'D'-'D'


K CONC. BLINDING & BASIC REINFORCEMENT OVERVIEW SCALE 1:25 K
1,480

1,480

1,480

1,480

1,480

1,480
PLAIN CONCRETE BLINDING & BASIC REINFORCEMENT FOR: FOOTINGS OF THE COLUMNS/PEDESTALS, RETAINING & SIDE WALLS, MANHOLE PIT. Reinforcement details exclude cover and rebar layer spacers.
1,730

1,730
1,830

1,830

1,830

1,830
350

350

350
[-1,730.0] Blinding Footing Top ▼ ▼ Blinding Footing Top [-1,730.0]
100

100

[-1,830.0] Excavation 01 (Footings) ▼ 1,700 2,690 1,700 2,695 1,700 2,695 1,700 2,690 1,700 ▼ Excavation 01 (Footings)[-1,830.0]

L STRUCTURAL LAYOUT_ SECTION VIEW 'A'-'A' L


CONC. BLINDING & BASIC REINFORCEMENT OVERVIEW SCALE 1:40
PLAIN CONCRETE BLINDING & BASIC REINFORCEMENT FOR: FOOTINGS OF THE COLUMNS/PEDESTALS, RETAINING & SIDE WALLS, MANHOLE PIT. Reinforcement details exclude cover and rebar layer spacers.

M M

N N

STRUCTURAL LAYOUT_ BASIC 3D CUTOUT VIEW [Cut Plane: Section 'D' -'D']
CONC. BLINDING & BASIC REINFORCEMENT OVERVIEW SCALE : N/A
PLAIN CONCRETE BLINDING & BASIC REINFORCEMENT FOR: FOOTINGS OF THE COLUMNS/PEDESTALS, RETAINING & SIDE WALLS, MANHOLE PIT. Reinforcement details exclude cover and rebar layer spacers.

O Project Name: DRURY'S WEIGHBRIDGE STRUCTURE [CIVIL WORKS] No. Description Date O
CONTRACTOR: DEUB ENGINEERING STRUCTURAL ENGINEERS: Essae Digitronics Pvt Ltd

DRAWN BY: DESIGN AFFILIATES:


STRUCTURAL LAYOUT_ BASIC 3D CUTOUT VIEW [Cut Plane: -255mm from Grid '1'] DEUB ENGINEERING SOLUTIONS MIKAB C.M. LTD
P.O.Box 2076, Kla - Ug
CONC. BLINDING & BASIC REINFORCEMENT OVERVIEW SCALE : N/A P.O.Box 983, Jinja - Uganda, E.A mikabcm@gmail.com
PLAIN CONCRETE BLINDING & BASIC REINFORCEMENT FOR: FOOTINGS OF THE COLUMNS/PEDESTALS, RETAINING & SIDE WALLS, MANHOLE PIT. Reinforcement details exclude cover and rebar layer spacers. deubeng@gmail.com | +256 - 200 - 928941 +256 - 39 - 3236406

GENERAL NOTES SPECIFIC NOTES Sign : DESIGN STAGE: CONSTRUCTION References :TSD-CV-STDR-42
1. This drawing is ONLY for construction references 1. FOUNDATIONS 2. CONCRETE MIXES 3. REINFORCEMENT 4. MINIMUM COVER TO REINF. IN 5. ABBREVIATIONS 6. OTHER NOTES Designed by : Verified : Approved : File : Date : Rev. Date:
P 2. Original Structural drawings by Essae supersedes this They shall generally be taken 1200mm min. below existing ground level Reinforced concrete to have a (a) Ribbed bars (>500N/mm²) to be Ribbed cold formed (a) Foundations = 50mm M.C = Mass Concrete All dimensions to be confirmed on site. D.E.S __ __ 10401 OCT.2022 CLIENT: DRURY AGRO PROCESSING LTD P
construction drawing incase of any Clarification. after removal of organic layer and all excavations to be confirmed by min. works cube strength of bars to BS4449 / IS:1786 and are marked "T" on these dwgs (b) Beams = 30mm R.C = Reinforced Concrete
CONSTRUCTION DRAWING: LOCATION: KAMPALA - UGANDA
TITLE:
CONSTRUCTION DRAWINGS: BLINDING & REBAR
3. This drawing is STRICTLY copyrighted to the designer. the Engineer before concrete blinding is laid. 25N/mm² at 28 days with 20mm (b) Any Mild steel bars (250N/mm²) marked "R" on these (c) Columns/ Pedestals = 40mm T = Top This drawing must be read in FOOTING'S BLINDING & REINFORCEMENT
2. The designer takes no obligation for any faults and errors Weak pockets of bearing strata to be dug out and filled with 1:4:8 max. aggregate size dwgs to be round bars to BS4483 (d) Retaining Wall = 25mm B = Bottom conjunction with the original Structural FOUNDATION GUIDE DETAILS Dwg No.: 10401DWB/CD/01.03
in the Structural design on this project. Essae's Civil EXCAVATIONS & REINFORCED CONCRETE DETAILS: Revision:Sheet:
mass concrete. (c) Structural steel shall confirm to IS: 2062 drawings from Essae. Project No.:
Structural Drawings (STD-CV-STDR-42) takes precedence. [REFER TO INDICATED TITLES] 10401DWB/CD 00 03 of 05 A0 Scale AS INDICATED

GSPublisherVersion 0.0.100.100
1 2 3 4 5 6 7 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

.D
A B C D E
A _ 1 2 A

.B
9xØ8/150 top 123xØ10/150 top
745 4,395 15
l=18.48m
4,395 8
l=2.00m
4,395 4,395 745 600 2,500 600
9xØ8/150 top
15
l=18.48m 14
123xØ10/150 top 5
19,070 l=1.90m

3xØ16/175 top

2xØ16/150 top

2xØ16/150 top

3xØ16/175 top

3xØ16/175 top

2xØ16/150 top

2xØ16/150 top

3xØ16/175 top

2755 3xØ16/175 top

2xØ16/150 top

2xØ16/150 top

3xØ16/175 top

3xØ16/175 top

2xØ16/150 top

2xØ16/150 top

3xØ16/175 top

3xØ16/175 top

2xØ16/150 top

2xØ16/150 top

3xØ16/175 top
+0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0
1,500 2,890 1,500 2,895 1,500 2,895 1,500 2,890 1,500

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m
520 450 3,945 450 3,945 450 3,945 450 3,940 450 525

425
[-470.0] Foundation Plates' Top ▼ ▼ Foundation Plates' Top [-470.0]

B 520 450 530 2,890 525 450 525 2,895 525 450 525 2,895 525 450 525 2,890 525 450 525 [-480.0] Columns/Pedestals' Top ▼ ▼ Columns/Pedestals' Top [-480.0] B

5
275

275

275

275
500

500

1,830
11xØ8/100 top 11xØ8/100 top 11xØ8/100 top 11xØ8/100 top 11xØ8/100 top

815

815

815

815
6 6 6 6 6
2 2

450

450

450

450

450
9xØ8/150 top l=1.70m l=1.70m l=1.70m l=1.70m l=1.70m
9
l=3.42m
11xØ8/100 top 11xØ8/100 top 11xØ8/100 top 11xØ8/100 top 11xØ8/100 top
9xØ8/150 top 7 7 7 -1.387 -1.382 7 7
9 l=1.30m l=1.30m l=1.30m
-1.384 l=1.30m 9xØ8/150 top l=1.30m
l=3.42m 9 [-1,380.0] Footings' Top ▼ ▼ Footings' Top [-1,380.0]
Mass Conc Slab's Top l=3.42m
With a Slop of 1:100
9xØ8/150 top
-1.380 -1.380
Towards Manhole
-1.380 -1.380 9 -1.380
-1.380 l=3.42m
2,500

2,500
.A -1.380 -1.380 -1.391 .A [-1,730.0] Blinding Footing Top ▼
3,500

2,050

1,870

3,500

2,050
1,870
3,500

2,050

1,870

1,870

2,050

3,500

2,050

3,500
C Mass Conc
-1.392 RC Footing Mass Conc RC Footing ▼ Blinding Footing Top [-1,730.0] C
RC Footing
RC Footing Mass Conc RC Footing
Slab's Top Top 23xØ10/149
Slab's Top top Top
Top Top 8
Top Slab's Top
11xØ8/100 top l=2.00m
7
l=1.30m
-1.398
[-1,830.0] Excavation 01 (Footings) ▼ 3,700 ▼ Excavation 01 (Footings)[-1,830.0]
11xØ8/100 top 11xØ8/100 top 11xØ8/100 23xØ10/149
top top
8 11xØ8/100 top
7 7 11xØ8/100 top -1.387 -1.384 7 l=2.00m 7
l=1.30m l=1.30m 6 l=1.30m l=1.30m
l=1.70m
23xØ10/149 top
l=2.00m
8 6
11xØ8/100 top
l=1.70m
6
11xØ8/100 top
l=1.70m
-1.400
6
11xØ8/100 top
l=1.70m
6
11xØ8/100 top
l=1.70m STRUCTURAL LAYOUT_ SECTION VIEW 'B'-'B'

591
1 1

450

450

450

450

450
RC FOOTERS & BASIC REINFORCEMENT OVERVIEW SCALE 1:25

815

815

815
-1.403
500

500
23xØ10/149 top
8 REINFORCED CONCRETE FOOTERS & BASIC VERTICAL REINFORCEMENT FOR: COLUMNS/PEDESTALS, RETAINING & SIDE WALLS, MANHOLE PIT. Reinforcement details exclude cover and rebar layer spacers.
l=2.00m

275

275

3xØ16/175 top 275

224

275

l=1.55m 275
D D

5
5

5
1,155 600 1,140

2xØ16/150 top
l=1.55m
3xØ16/175 top
l=1.55m

5
3xØ16/175 top

2xØ16/150 top

2xØ16/150 top

3xØ16/175 top

3xØ16/175 top

2xØ16/150 top

2xØ16/150 top

3xØ16/175 top

2xØ16/150 top

3xØ16/175 top

2xØ16/150 top

2xØ16/150 top

3xØ16/175 top

2xØ16/150 top

2xØ16/150 top

3xØ16/175 top
l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m

l=1.55m
3xØ16/175 top
l=1.55m
1,500 2,890 1,500 2,895 1,500 2,895 1,500 2,890 1,500

5xØ10/150 top 45xØ10/150 top


75xØ10/149 top
19 5xØ10/150 topl=2.00m 8 9xØ8/150 top
l=2.60m 19 17
9xØ8/150 top 14 5xØ10/150 top l=2.60m l=6.77m
16 l=1.90m 18 14xØ8/150 top
l=11.18m l=2.70m 20

.B
9xØ8/150 top 75xØ10/149 top l=2.25m 5xØ10/15045xØ10/150
top top 9xØ8/150 top
E 16 8 3xØ10/150 top 18 14 17 E
l=11.18m l=2.00m 19 14xØ8/150 top l=2.70m l=1.90m l=6.77m
l=2.60m 21
l=1.95m _

.D
A B C 18
6xØ10/150 top
l=2.70m
D E

STRUCTURAL LAYOUT_ FLOOR PLAN


RC FOOTERS & BASIC REINFORCEMENT OVERVIEW SCALE 1:40
REINFORCED CONCRETE FOOTERS & BASIC VERTICAL REINFORCEMENT FOR: COLUMNS/PEDESTALS, RETAINING & SIDE WALLS, MANHOLE PIT. Reinforcement details exclude cover and rebar layer spacers.
F F

G STRUCTURAL LAYOUT_ BASIC 3D CUTOUT VIEW [Cut Plane: Grid 'B'] G


RC FOOTERS & BASIC REINFORCEMENT OVERVIEW SCALE : N/A
REINFORCED CONCRETE FOOTERS & BASIC VERTICAL REINFORCEMENT FOR: COLUMNS/PEDESTALS, RETAINING & SIDE WALLS, MANHOLE PIT. Reinforcement details exclude cover and rebar layer spacers.

2 1
2,500
H H

+0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0

[-470.0] Foundation Plates' Top ▼ ▼ Foundation Plates' Top [-470.0]


[-480.0] Columns/Pedestals' Top ▼ ▼ Columns/Pedestals' Top [-480.0]

1,480

1,480
I I

1,830
Slope: 1:100

2,530
[-1,380.0] Footings' Top ▼

▼ [-1,480.0] Excavation 02 (Mass conc Slab)

350
STRUCTURAL LAYOUT_ BASIC ISOMETRIC TOP VIEW
[-1,730.0] Blinding Footing Top ▼

RC FOOTERS & BASIC REINFORCEMENT OVERVIEW SCALE 1:40

1,050
J [-1,830.0] Excavation 01 (Footings) ▼ ▼ Footings' Top [-2,080.0] J
REINFORCED CONCRETE FOOTERS & BASIC VERTICAL REINFORCEMENT FOR: COLUMNS/PEDESTALS, RETAINING & SIDE WALLS, MANHOLE PIT. Reinforcement details exclude cover and rebar layer spacers.

▼ Blinding Footing Top [-2,430.0]

A B C D _ E
4,395 4,395 4,395 4,395 950 2,370 1,000 ▼ Excavation 01 (Footings)[-2,530.0]

STRUCTURAL LAYOUT_ SECTION VIEW 'D'-'D'


+0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0

K RC FOOTERS & BASIC REINFORCEMENT OVERVIEW SCALE 1:25 K


425

200
[-470.0] Foundation Plates' Top ▼ 4,340 300
▼ Foundation Plates' Top [-470.0]
[-480.0] Columns/Pedestals' Top ▼ ▼ Columns/Pedestals' Top [-480.0]
REINFORCED CONCRETE FOOTERS & BASIC VERTICAL REINFORCEMENT FOR: COLUMNS/PEDESTALS, RETAINING & SIDE WALLS, MANHOLE PIT. Reinforcement details exclude cover and rebar layer spacers.
1,480

1,480

1,480

1,480

1,480

1,480
1,830

1,830

1,830

1,830
Slope: 1:100 Slope: 1:100
[-1,380.0] Footings' Top ▼ ▼ Footings' Top [-1,380.0]
350

350

350
[-1,730.0] Blinding Footing Top ▼ [-1,480.0] Excavation 02 (Mass conc Slab) ▼ [-1,480.0] Excavation 02 (Mass conc Slab) ▼ [-1,480.0] Excavation 02 (Mass conc Slab) ▼ [-1,480.0] Excavation 02 (Mass conc Slab) ▼ ▼ Blinding Footing Top [-1,730.0]

[-1,830.0] Excavation 01 (Footings) ▼ 1,700 2,690 1,700 2,695 1,700 2,695 1,700 2,690 1,700 ▼ Excavation 01 (Footings)[-1,830.0]

L STRUCTURAL LAYOUT_ SECTION VIEW 'A'-'A' _ L


RC FOOTERS & BASIC REINFORCEMENT OVERVIEW SCALE 1:40
REINFORCED CONCRETE FOOTERS & BASIC VERTICAL REINFORCEMENT FOR: COLUMNS/PEDESTALS, RETAINING & SIDE WALLS, MANHOLE PIT. Reinforcement details exclude cover and rebar layer spacers.

M M

N N

STRUCTURAL LAYOUT_ BASIC 3D CUTOUT VIEW [Cut Plane: Section 'D' -'D']
RC FOOTERS & BASIC REINFORCEMENT OVERVIEW SCALE : N/A
REINFORCED CONCRETE FOOTERS & BASIC VERTICAL REINFORCEMENT FOR: COLUMNS/PEDESTALS, RETAINING & SIDE WALLS, MANHOLE PIT. Reinforcement details exclude cover and rebar layer spacers.

O Project Name: DRURY'S WEIGHBRIDGE STRUCTURE [CIVIL WORKS] No. Description Date O
CONTRACTOR: DEUB ENGINEERING STRUCTURAL ENGINEERS: Essae Digitronics Pvt Ltd

DRAWN BY: DESIGN AFFILIATES:


STRUCTURAL LAYOUT_ BASIC 3D CUTOUT VIEW [Cut Plane: -255mm from Grid '1'] DEUB ENGINEERING SOLUTIONS MIKAB C.M. LTD
P.O.Box 2076, Kla - Ug
RC FOOTERS & BASIC REINFORCEMENT OVERVIEW SCALE : N/A P.O.Box 983, Jinja - Uganda, E.A mikabcm@gmail.com
REINFORCED CONCRETE FOOTERS & BASIC VERTICAL REINFORCEMENT FOR: COLUMNS/PEDESTALS, RETAINING & SIDE WALLS, MANHOLE PIT. Reinforcement details exclude cover and rebar layer spacers. deubeng@gmail.com | +256 - 200 - 928941 +256 - 39 - 3236406

GENERAL NOTES SPECIFIC NOTES Sign : DESIGN STAGE: CONSTRUCTION References :TSD-CV-STDR-42
1. This drawing is ONLY for construction references 1. FOUNDATIONS 2. CONCRETE MIXES 3. REINFORCEMENT 4. MINIMUM COVER TO REINF. IN 5. ABBREVIATIONS 6. OTHER NOTES Designed by : Verified : Approved : File : Date : Rev. Date:
P 2. Original Structural drawings by Essae supersedes this They shall generally be taken 1200mm min. below existing ground level Reinforced concrete to have a (a) Ribbed bars (>500N/mm²) to be Ribbed cold formed (a) Foundations = 50mm M.C = Mass Concrete All dimensions to be confirmed on site. D.E.S __ __ 10401 OCT.2022 CLIENT: DRURY AGRO PROCESSING LTD P
construction drawing incase of any Clarification. after removal of organic layer and all excavations to be confirmed by min. works cube strength of bars to BS4449 / IS:1786 and are marked "T" on these dwgs (b) Beams = 30mm R.C = Reinforced Concrete
CONSTRUCTION DRAWING: LOCATION: KAMPALA - UGANDA
TITLE:
CONSTRUCTION DRAWINGS: FOOTINGS & REBAR
3. This drawing is STRICTLY copyrighted to the designer. the Engineer before concrete blinding is laid. 25N/mm² at 28 days with 20mm (b) Any Mild steel bars (250N/mm²) marked "R" on these (c) Columns/ Pedestals = 40mm T = Top This drawing must be read in FOOTING & VERTICAL REINFORCEMENT
2. The designer takes no obligation for any faults and errors Weak pockets of bearing strata to be dug out and filled with 1:4:8 max. aggregate size dwgs to be round bars to BS4483 (d) Retaining Wall = 25mm B = Bottom conjunction with the original Structural FOUNDATION GUIDE DETAILS Dwg No.: 10401DWB/CD/01.04
in the Structural design on this project. Essae's Civil EXCAVATIONS & REINFORCED CONCRETE DETAILS: Revision:Sheet:
mass concrete. (c) Structural steel shall confirm to IS: 2062 drawings from Essae. Project No.:
Structural Drawings (STD-CV-STDR-42) takes precedence. [REFER TO INDICATED TITLES] 10401DWB/CD 00 04 of 05 A0 Scale AS INDICATED

GSPublisherVersion 0.0.100.100
1 2 3 4 5 6 7 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

.D
A B C D E
A 745 4,395 4,395 4,395 4,395
_
745
1 2 A

.B
200 435 2,500 435
300 245 4,395 4,395 4,395 4,395 5 745
60 60
150 450 2,050 450 150
18,465 +0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0

200 18,065 200

425
200 20 20

480
[-470.0] Foundation Plates' Top ▼ ▼ Foundation Plates' Top [-470.0]
300 450 3,945 450 3,945 450 3,945 450 3,940 450 200 305
B [-480.0] Columns/Pedestals' Top ▼ ▼ Columns/Pedestals' Top [-480.0] B

60 150
65

65

65

65
150

150
500

500
65
150

60

150
2 2

900
450

450
285
150
65 60 450 2,050 450 60 150

[-1,380.0] Footings' Top ▼ ▼ Footings' Top [-1,380.0]

350
2,500

2,500
.A .A
2,500

3,370

3,070

2,050

2,050

3,070

3,370
C [-1,730.0] Blinding Footing Top ▼ ▼ Blinding Footing Top [-1,730.0] C

100
[-1,830.0] Excavation 01 (Footings) ▼ 3,700 ▼ Excavation 01 (Footings)[-1,830.0]

STRUCTURAL LAYOUT_ SECTION VIEW 'B'-'B'


285

1 1
450

450
GENERAL OVERVIEW LAYOUT SCALE 1:25

150

150

150
500

500
150

60
150

150
DETAILING ALL ELEMENTS: FOOTINGS | COLUMNS/PEDESTALS | RETAINING WALL | SIDE WALL | MANHOLE PIT & COVER | EDGE PROTECTION | MANHOLE PLATE | FOUNDATION PLATE
60
65

215

65

65

65
D D

600
150
750
20 20
200 450 3,945 450 3,945 450 1,530 150 600 150 1,515 450 3,940 450 200

200 10,790 150 600 150 6,375 200

18,465

.B
E 4,395 4,395 4,395 4,395
E
_

.D
A B C D E

STRUCTURAL LAYOUT_ FLOOR PLAN


COLUMNS/PEDESTALS, RETAINING & SIDE WALLS SCALE 1:40
DETAILING : COLUMNS/PEDESTALS | RETAINING WALL | SIDE WALL | MANHOLE PIT
F F

.D
A B C D E
_
445 4,395 4,395 4,395 4,395 440
.B

200 195
245 200 3,995 200 200 3,995 200 200 3,995 200 200 3,990 205 245
45 45
200 400 3,995 400 3,995 400 3,995 400 3,990 400 200

G 25 400 25 3,945 25 400 25 3,945 25 400 25 3,945 25 400 25 3,940 25 400 25


STRUCTURAL LAYOUT_ BASIC 3D CUTOUT VIEW [Cut Plane: Grid 'B'] G
70 310 70 3,945 70 310 70 3,945 70 310 70 3,945 70 310 70 3,940 70 310 70 GENERAL OVERVIEW LAYOUT SCALE : N/A
DETAILING ALL ELEMENTS: FOOTINGS | COLUMNS/PEDESTALS | RETAINING WALL | SIDE WALL | MANHOLE PIT & COVER | EDGE PROTECTION | MANHOLE PLATE | FOUNDATION PLATE
200 125 60
150

150
45
185
185

125

500
65
335
2 1
435

60
125
100

2 2
45 110

200
100

200

200
125

125

125
435 2,500 1,185
H H
150 60 450 2,050 450 60 900
+0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0
2,500

2,500
.A .A
2,300

2,300

2,050

2,050

2,300

3,370
2,175

480
[-470.0] Foundation Plates' Top ▼ ▼ Foundation Plates' Top [-470.0]
45

[-480.0] Columns/Pedestals' Top ▼ ▼ Columns/Pedestals' Top [-480.0]


125

125
100

200

200

200
1 1
45 110

200
100

125

125
435

I I
185

500
335
60

900
125
185

2,080
60
150

150

65
900

Slope: 1:100
[-1,380.0] Footings' Top ▼

350
900 ▼ [-1,480.0] Excavation 02 (Mass conc Slab)
[-1,730.0] Blinding Footing Top ▼

1,025
100
J STRUCTURAL LAYOUT_ FLOOR PLAN [-1,830.0] Excavation 01 (Footings) ▼ ▼ Footings' Top [-2,080.0]
J

350
FOUNDATION PLATES SCALE 1:40
▼ Blinding Footing Top [-2,430.0]
DETAILING : FOUNDATION PLATE, COLUMNS/PEDESTALS | RETAINING WALL | SIDE WALL | MANHOLE PIT & COVER | EDGE PROTECTION | MANHOLE PLATE

A B C D _ E

100

100
950 2,370 1,000 ▼ Excavation 01 (Footings)[-2,530.0]

20
445 4,395 4,395 4,395 4,395 440 20
200 450 3,945 450 3,945 225 225 3,945 450 3,940 450 200
STRUCTURAL LAYOUT_ SECTION VIEW 'D'-'D'
+0.0 [GL] Retaining Wall Top ▼ ▼ Retaining Wall Top [GL] +0.0

K GENERAL OVERVIEW LAYOUT SCALE 1:25 K


425

200
[-470.0] Foundation Plates' Top ▼ 4,340 300
▼ Foundation Plates' Top [-470.0]
[-480.0] Columns/Pedestals' Top ▼ ▼ Columns/Pedestals' Top [-480.0]
DETAILING ALL ELEMENTS: FOOTINGS | COLUMNS/PEDESTALS | RETAINING WALL | SIDE WALL | MANHOLE PIT & COVER | EDGE PROTECTION | MANHOLE PLATE | FOUNDATION PLATE

1,500 2,890 1,500 2,895 1,500 Slope: 1:100 2,895 Slope: 1:100 1,500 2,890 1,500
[-1,380.0] Footings' Top ▼ ▼ Footings' Top [-1,380.0]

[-1,730.0] Blinding Footing Top ▼ [-1,480.0] Excavation 02 (Mass conc Slab) ▼ [-1,480.0] Excavation 02 (Mass conc Slab) ▼ [-1,480.0] Excavation 02 (Mass conc Slab) ▼ [-1,480.0] Excavation 02 (Mass conc Slab) ▼ ▼ Blinding Footing Top [-1,730.0]

[-1,830.0] Excavation 01 (Footings) ▼ 1,700 2,690 1,700 2,695 1,700 2,695 1,700 2,690 1,700 ▼ Excavation 01 (Footings)[-1,830.0]

L STRUCTURAL LAYOUT_ SECTION VIEW 'A'-'A' _ L


GENERAL OVERVIEW LAYOUT SCALE 1:40
DETAILING ALL ELEMENTS: FOOTINGS | COLUMNS/PEDESTALS | RETAINING WALL | SIDE WALL | MANHOLE PIT & COVER | EDGE PROTECTION | MANHOLE PLATE | FOUNDATION PLATE

M M

N N

STRUCTURAL LAYOUT_ BASIC 3D CUTOUT VIEW [Cut Plane: Section 'D' -'D']
GENERAL OVERVIEW LAYOUT SCALE : N/A
DETAILING ALL ELEMENTS: FOOTINGS | COLUMNS/PEDESTALS | RETAINING WALL | SIDE WALL | MANHOLE PIT & COVER | EDGE PROTECTION | MANHOLE PLATE | FOUNDATION PLATE

O Project Name: DRURY'S WEIGHBRIDGE STRUCTURE [CIVIL WORKS] No. Description Date O
CONTRACTOR: DEUB ENGINEERING STRUCTURAL ENGINEERS: Essae Digitronics Pvt Ltd

DRAWN BY: DESIGN AFFILIATES:


STRUCTURAL LAYOUT_ BASIC 3D CUTOUT VIEW [Cut Plane: -255mm from Grid '1'] DEUB ENGINEERING SOLUTIONS MIKAB C.M. LTD
P.O.Box 2076, Kla - Ug
GENERAL OVERVIEW LAYOUT SCALE : N/A P.O.Box 983, Jinja - Uganda, E.A mikabcm@gmail.com
DETAILING ALL ELEMENTS: FOOTINGS | COLUMNS/PEDESTALS | RETAINING WALL | SIDE WALL | MANHOLE PIT & COVER | EDGE PROTECTION | MANHOLE PLATE | FOUNDATION PLATE deubeng@gmail.com | +256 - 200 - 928941 +256 - 39 - 3236406

GENERAL NOTES SPECIFIC NOTES Sign : DESIGN STAGE: CONSTRUCTION References :TSD-CV-STDR-42
1. This drawing is ONLY for construction references 1. FOUNDATIONS 2. CONCRETE MIXES 3. REINFORCEMENT 4. MINIMUM COVER TO REINF. IN 5. ABBREVIATIONS 6. OTHER NOTES Designed by : Verified : Approved : File : Date : Rev. Date:
P 2. Original Structural drawings by Essae supersedes this They shall generally be taken 1200mm min. below existing ground level Reinforced concrete to have a (a) Ribbed bars (>500N/mm²) to be Ribbed cold formed (a) Foundations = 50mm M.C = Mass Concrete All dimensions to be confirmed on site. D.E.S __ __ 10401 OCT.2022 CLIENT: DRURY AGRO PROCESSING LTD P
construction drawing incase of any Clarification. after removal of organic layer and all excavations to be confirmed by min. works cube strength of bars to BS4449 / IS:1786 and are marked "T" on these dwgs (b) Beams = 30mm R.C = Reinforced Concrete
CONSTRUCTION DRAWING: LOCATION: KAMPALA - UGANDA
TITLE:
CONSTRUCTION DRAWINGS: FOUNDATION PLATES
3. This drawing is STRICTLY copyrighted to the designer. the Engineer before concrete blinding is laid. 25N/mm² at 28 days with 20mm (b) Any Mild steel bars (250N/mm²) marked "R" on these (c) Columns/ Pedestals = 40mm T = Top This drawing must be read in FOUNDATION PLATES & RETAINING WALL LAYOUT
2. The designer takes no obligation for any faults and errors Weak pockets of bearing strata to be dug out and filled with 1:4:8 max. aggregate size dwgs to be round bars to BS4483 (d) Retaining Wall = 25mm B = Bottom conjunction with the original Structural FOUNDATION GUIDE DETAILS Dwg No.: 10401DWB/CD/01.05
in the Structural design on this project. Essae's Civil EXCAVATIONS & REINFORCED CONCRETE DETAILS: Revision:Sheet:
mass concrete. (c) Structural steel shall confirm to IS: 2062 drawings from Essae. Project No.:
Structural Drawings (STD-CV-STDR-42) takes precedence. [REFER TO INDICATED TITLES] 10401DWB/CD 00 05 of 05 A0 Scale AS INDICATED

GSPublisherVersion 0.0.100.100