Professional Documents
Culture Documents
DP 2
60 1815/
966 000 1.5
ABBREVIATIONS:
55
/PE
987 5 5
DP
DP - Distribution Pressure
26
CH
IP - Intermediate Pressure
/PE
DP DP 10
TP - Transmission Pressure
921
26 15/20
2691
15 D
42
3.6
RI
PE - Polyethylene
18
000
4
991 .0
C2 555
P/P
964
ST
BO
PL
DP GAS MAINS
DP
3
E
IP GAS MAINS 928
60
IN
TP GAS MAINS 932 2
DEAD GAS MAIN
EE
60
A
995 1
PROPOSED GAS MAIN
11
.0 H
AS
DP
3.6
PL
LIVE GAS SERVICE PRESENT
114
936
N
MO
DP
923 967
A1
-3
14
-0
940 997
74
/1
98
1
962
927 965
MO
942
NA
A1-
SH
958
314
3.6
EE
963
42
-07
931 946
DP
4/19
PL
3.0
81
81
/19
74
A1
-0
-3
961
14
14
954
-0
-3
DIL
74
935
A1
/1
98
950
1
WOR
959
DP
TH
60
939
DR
955
(E OF) )
ED
UIR
Q
975 RE
941 IT
RM
2-941 PE
RT
1.0
951
GC
945
(O
P
HEE C
0.9
)T
3.0
65
(4
42 DP
9
3.
949
32
MONAS
91 93
9/19 9/19
81
025 -025 2670
16.7
5
-074/19
5 - 15
91-1
5 91- 3.0
3.6
TH DR
2436
E
9/1991
P/P 2431
42 D
1.0
/2003
A1-314
3
00 4500002262
/1
PE
115
3.3
91-155-025
3
DP/
1.0
113 114 D1-24
3/198 91-328/1991
42
111
42 DEAD/PE
DILWOR
109 1
ENTERPRISE
3.0
3.0
107
112
102
110
93
3.0 9/19
/PE
025
2435
55-
3.0 91-1
6 0 DP
965
104 108 2440
60 DP
2443
101 A1-31
4-074
/1981 2-2443 13
PE
106
1.0
103
DP/
105
42
13
91
-1 2428
55
-0 985 DILWORTH DR
25
9/
19
92 2690
8
9
E
/P
985 2447
DP
BC
13
60
9
10
00
5
/2
4.
.0
5.2
5
44
79
55500 60 DP/PE E
28
02879 /P
/2009 DP
00
15 DP
/PE
50
/PE 4
11
55
42 DP
11
/2009
5.3
1
02879
.1
980
BOC 2
55500 /PE
1992
4.7
60 DP
2655
-0259/
2
12 2.1 BO21
C
Y
WA
2674
91-155
SE
PE
22
13
60 DP/
4.5 I
PR
14 3
1992
0.9 OF
F PVMT R
TE
-0259/
/1981
N
/2009
4 23 E 3
4-074
3.
91-155
16 Unit 25 20 2670
0
)
8/
ED
02879
IR
49
A1-31
15 DP/
QU
00
17
(TYP) PE 0 2649
0
RE
55500
41
24
IT
3.0
RM
Unit 26
5
PE
GC
153.0
(O
DR
P
)T
6
3.0
25 E
/P
/2009
(TYP)
42 DP
18
65
15 DP/PE DP
ORTH
(4
4
11
81
2656
3.9
5
5550002879
19
/19
32
26 2643 2656
266
12
63.0
DILW
81-
2636
2.1 BOC
2.
0.6 OFF 2637
PVMT
7
)
(END OF
3.4 8
/PE
27
2421 Glacier Crt
60 DP
60
DP
20
P
DP
114 D
60
/P
E
2.4
41
21 28
Unit 1.2
00 60
278.5
00 D
NT
RESTAURA
49 P/P
9 BANQUET
3
/PE
00
98 E
4.0 /2
/2
DP
8 BC 111
00
9
49
3
Unit
60
00 26 DP/PE
4
10 0
41
0 34/2011 BLDG 2
29 55500050 08 109 110
0.2 106 107 1
60
1641
.0
DP
10
3
1-110
/P
/1
3.5
E
1.3
00
3
.1
11
05
CO 60 D
0.9
BOC 2
30 1677
41
0.9
IN 0 DP/PE
PE
RD
MM P/PE
4
P/
10
10
D 2631 1675
00
ER
4
11
1
3
04
6
12
10
S
SEE DWG. No.
DG
99
CE
2625
8/
BL
65
2
20
RR
10
9
/19
0.
01
X
03
81
NK
/2
AV
/2009
597
/19
96
JE
266
65-
48
E
1
0.9
02879
10
12
81-
13
10
9 41
0.
41
DP
00
00
55500
995
114
49
OIL AND GAS ACTIVITIES ACT (SEC. 76) 98 W-55310
REQUIRES 14 /2
00
2.7 3 13.
DP
4
WRITTEN PERMISSION MUST BE OBTAINED
LS 13
60
PRIOR TO ACTIVITY WITHIN THIRTY (30)
5 2619 21.
COMMERCE AVE 0
4
9.
5
METRES OF AN INTERMEDIATE PRESSURE 6
65- 0 DP
UB
15.
(N OF)
PIPELINE OR 597
ST
1642
/19
TRANSMISSION PRESSURE PIPELINE. 15
3.4
2621 65
https://www.fortisbc.com/Safety/NaturalGasSafety/Pages/Permits.aspx 131.8
MI
16 LL
ATTENTION: 2428 GLACIER COURT, KELOWNA S
DO NOT RELY ON THIS INFORMATION ALONE! RD
You must hand dig to expose the line at several locations to determine its exact location and depth before using
any mechanized equipment. All locations are approximate only. Gas lines built after the date shown, are not included TICKET # 20232212677
in this information package. FortisBC will not accept responsibility for errors or omissions. Gas line depths are not
available due to possible changes in grade. Record information provided is specific to location of original request
from BC One Call. Measurements displayed in meter(s). Page: 1 of 1 2023/05/26