11 PATTERNS WELL HOOK-UP AND ASSOCIATED WORKS,NORTH KUWAIT

DAILY PROGRESS REPORT

DATE PERMIT No.


BLOCK No. OF LABOURS
PATTERN

Sl# WORK DESCRIPTION UOM ACTUAL INSTALLATION REMARKS IF ANY

1 Ø120mm DWDC HDPE Duct Meters

2 Ø40mm HDPE Sub Duct Meters

3 Ø120mm Duct Coupler Nos.

4 Ø120mm End Caps Nos.

5 120mm Spacers Nos.

6 Ø40mm HDPE Sub-duct Coupler Nos.

7 Ø40mm HDPE Sub-duct Simplex plugs Nos.

8 Ø40mm HDPE Sub-duct Solid Duct Plug for spare sub-ducts Nos.

9 Splice Enclosure for 24F Nos.

10 Splice Enclosure for 60F Nos.

11 60 Port FO Patch Panel Nos.

12 24 Port FO Patch Panel Nos.

CABLE PULLED FROM CABLE READING


CABLE LAYING UOM ACTUAL INSTALLATION DRUM NO. COILED QTY
FROM TO FROM TO

13 24F FOC SM - Cable laying Meters

14 60F FOC SM - Cable laying Meters

15 Any Other works, please mention here

AYB SUPERVISOR/ENGINEER SHBC SUPERVISOR SHBC ENGINEER


Name: Name: Name:
Signature: Signature: Signature:
Date: Date: Date: