Professional Documents
Culture Documents
PREQUALIFICATION
DOCUMENTS
FOR STRUCTURAL STEEL WORKS
www.alhajiry.com
CONTENTS
4F-0284 Q1-3308
ISO 45001
1
IS
00
O
14
90
O
01
IS
Type
Registered Name
Registered Of fice
Trading Address
Tel No
Fax No
E-mail Address
Commercial Registration
OWNERSHIP
Type
Shareholding Pattern
www.alhajiry.com Al Hajiry Trading & Contracting - Mechanical Engineering Division - Company Profile
Al Hajiry
Group of Companies
www.alhajiry.com Al Hajiry Trading & Contracting - Mechanical Engineering Division - Company Profile
We Design, Fabricate and Erect the following products:
Pre-Engineered Building ie; Warehouse, Workshops, Process buildings, Store, Factory etc.
Structural Steel Buildings, High rise buildings, Towers, Shopping mall, Office, etc.
Canopy Structure
Carpark
Pipe rack, Sunshade, Pipe support
Platform, Cross-over
Bridges & Girders
Ladder, Stairs, Handrail, etc.
Sandwich panel
Single skin profile sheet
Decking sheet
Z & C Purlin
Cold room panel
Structural Steel for Gantries and Overhead Traveling Cranes
Mobile accommodation units and rig site offices
Mud systems including installation of mud cleaning and degassing equipment.
Catwalks, fixed and foldable units including pipe racks.
Complete substructures or modification work
Refurbishing of drilling rigs, well pulling hoists and brine filtration units.
Crude oil storage tanks with filtration units.
High-pressure pipe work for Koomey units.
Fabrication of mud labs.
Skid-mounted diesel and water tanks.
Pressure vessels
Silos and hoppers
Workshop shed elements and their erection.
Blasting and coating services.
Large storage tanks
Process pipe installation
www.alhajiry.com Al Hajiry Trading & Contracting - Mechanical Engineering Division - Company Profile
م.م.ﺷرﻛﺔ اﻟﮭﺎﺟري ﻟﻠﺗﺟﺎرة ش
AL HAJIRY TRADING LLC
www.alhajiry.com Al Hajiry Trading & Contracting - Mechanical Engineering Division - Company Profile
ﺷرﻛﺔ اﻟﮭﺎﺟري ﻟﻠﺗﺟﺎرة ش.م.م
AL HAJIRY TRADING LLC
Organization Chart
www.alhajiry.com
LEGEND:
Divisional Manager Divisional Manager Divisional Manager Divisional Manager Divisional Manager Divisional Manager
TTC ITD
4F-0284 Q1-3308
www.alhajiry.com
Chairman
Nasser Bin Khamis Al-Hashar
Managing Director
Sam Varghese Corporate Management
Representative
GM - SP & C
Director
PRO Blesson Sam Varghese
Admin In-Charge
Group HSE
Admin Assistant Manager
Fabricators
Machine Operator Welders Helpers Helpers Helpers Crane Operators Riggers
Forklift Operator Helpers Drivers Helpers
4F-0284 Q1-3308
www.alhajiry.com
Al Hajiry Group
Managing Director
Project Management
Project Manager
Engineering
QHSE Manager Planning Engineer Production Manager Project Coordinator
Manager
Legend :
Structural Designer Sr. Draftsman QHSE Engineer Production Engineer Site Engineer Site Part-time
Eng’ng Coordinator
Main Office Full-time
Site Full-time
Tekla Modelers QHSE Officer Site-in-Charge
Certificates
Metallic
Repairs and Alterations
At
Shop and Field Locations
Executive Director
CERTIFICATE OF
AUTHORIZATION
COMPANY:
SCOPE:
Manufacture of pressure vessels at the above location and field sites controlled
by the above location (This authorization does not cover impregnated graphite)
COMPANY:
SCOPE:
Manufacture and assembly of power boilers at the above location and field sites
controlled by the above location
CIVIL PRODUCTS
AVME NO. PRODUCT CATEGORY PRODUCT SUB CATEGORY COMMENTS & ALERTS MATERIALS Pressure Rating/Max Size(NB)
METALWORK
NOISE SUPPRES/INSULATION
METALWORK
Al Azwar Al Kindi-FPP5
Vendor Management & Procurement Support Lead
THIS CERTIFICATE IS VALID UNTIL : 03.09.2022 CERTIFICATE NUMBER : RE01001553-2020
PLEASE REFER OVERLEAF FOR DETAILS. Page 1 of 2
Duration of registration
An Agency:
As per the duration dates stated on the Ministry of Commerce and Industry Agency Certificate.
A local manufacturer:
As per the duration dates stated on the Manufacturer´s permit.
PDO has the right to extend or terminate the Vendor´s registration to suit its operational needs and business principles.
Renewal of registration:
On expiration, the registration is subject to renewal. The local agent/manufacturer is responsible to provide to PDO the renewal of their
certificates. The local agent/manufacturer is responsible to ensure that this certification is valid and updated. They are responsible to furnish to
PDO all relevant documentations for the renewal of this registration.
PDO reserve the right to remove any local agent/manufacturer from the approval list of vendors if they failed to renew their registration within 30
days from the expiry date of this certificate.
The Vendor shall address the request for registration renewal to:
Business Gateways International LLC
Office 14, Building 4, Knowledge Oasis Muscat (KOM)
Sultanate of Oman
Tel: +968 24170047 Fax: +968 24170045
Support centre email id: helpdesk@businessgateways.com
Failure to follow the above to renew the registration of your company upon the stated expiry date, PDO reserve the rights to remove your company
from AVME list without prior warning and PDO should not be held responsible.
Page 2 of 2
Company_Registration
Legal Type Limited Liability Company ﺷﺮﻛﺔ ﻣﺤﺪﻭﺩﺓ ﺍﻟﻤﺴﺆﻭﻟﻴﺔ ﺍﻟﺸﻜﻞ ﺍﻟﻘﺎﻧﻮﻧﻲ
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 1 of 46 46ﻣﻦ 1 ﺻﻔﺤﺔ
2020/06/21
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 2 of 46 46ﻣﻦ 2 ﺻﻔﺤﺔ
2020/06/21
492205:Airport shuttles(license pending) (ﺧﺪﻣﺎﺕ ﺍﻟﻨﻘﻞ ﺍﻟﺒﺮﻱ ﻟﻠﺮﻛﺎﺏ ﺑﺎﻟﻤﻄﺎﺭ )ﺍﻟﻨﺸﺎﻁ ﻏﻴﺮ ﻣﺮﺧﺺ:492205
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 3 of 46 46ﻣﻦ 3 ﺻﻔﺤﺔ
2020/06/21
561007:Cafés (cafes that offer meals mainly) ﺍﻟﻤﻘﺎﻫﻲ ﺍﻟﺘﻲ ﺗﻘﺪﻡ ﻭﺟﺒﺎﺕ ﺍﻟﻄﻌﺎﻡ ﺑﺸﻜﻞ ﺃﺳﺎﺳﻲ:561007
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 4 of 46 46ﻣﻦ 4 ﺻﻔﺤﺔ
2020/06/21
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 5 of 46 46ﻣﻦ 5 ﺻﻔﺤﺔ
2020/06/21
475301:Retail sale in specialized stores of carpets and rugs ﺍﻟﺒﻴﻊ ﺑﺎﻟﺘﺠﺰﺋﺔ ﻓﻲ ﺍﻟﻤﺘﺎﺟﺮ ﺍﻟﻤﺘﺨﺼﺼﺔ ﻟﻠﺴﺠﺎﺩ ﻭﺍﻟﻤﻮﻛﻴﺖ:475301
951100:Repair of computers and peripheral equipment ﺇﺻﻼﺡ ﻭﺻﻴﺎﻧﺔ ﺃﺟﻬﺰﺓ ﺍﻟﺤﺎﺳﻮﺏ ﻭﺍﻟﻤﻌﺪﺍﺕ ﺍﻟﻄﺮﻓﻴﺔ ﻟﻠﺤﺎﺳﻮﺏ:951100
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 6 of 46 46ﻣﻦ 6 ﺻﻔﺤﺔ
2020/06/21
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 7 of 46 46ﻣﻦ 7 ﺻﻔﺤﺔ
2020/06/21
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 8 of 46 46ﻣﻦ 8 ﺻﻔﺤﺔ
2020/06/21
292005:Manufacture of parts of trailors and semi-trailors ﺻﻨﻊ ﺃﺟﺰﺍﺀ ﺍﻟﻤﺮﻛﺒﺎﺕ ﺍﻟﻤﻘﻄﻮﺭﺓ ﻭﻧﺼﻒ ﺍﻟﻤﻘﻄﻮﺭﺓ:292005
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 9 of 46 46ﻣﻦ 9 ﺻﻔﺤﺔ
2020/06/21
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 10 of 46 46 ﻣﻦ10 ﺻﻔﺤﺔ
2020/06/21
591101:Production of motion pictures and videos ﺇﻧﺘﺎﺝ ﺍﻷﻓﻼﻡ ﺍﻟﺴﻴﻨﻤﺎﺋﻴﺔ ﻭﺃﺷﺮﻃﺔ ﺍﻟﻔﻴﺪﻳﻮ:591101
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 11 of 46 46 ﻣﻦ11 ﺻﻔﺤﺔ
2020/06/21
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 12 of 46 46 ﻣﻦ12 ﺻﻔﺤﺔ
2020/06/21
433003:Plastering, painting and decorating (ﺃﻋﻤﺎﻝ ﺗﻨﻔﻴﺬ ﺍﻟﺘﺼﻤﻴﻢ ﺍﻟﺪﺍﺧﻠﻲ )ﺍﻟﺘﺠﺼﻴﺺ ﻭﺍﻟﻄﻼﺀ ﻭﺍﻟﺘﺰﻳﻴﻦ:433003
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 13 of 46 46 ﻣﻦ13 ﺻﻔﺤﺔ
2020/06/21
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 14 of 46 46 ﻣﻦ14 ﺻﻔﺤﺔ
2020/06/21
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 15 of 46 46 ﻣﻦ15 ﺻﻔﺤﺔ
2020/06/21
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 16 of 46 46 ﻣﻦ16 ﺻﻔﺤﺔ
2020/06/21
561001:Restaurants ﺍﻟﻤﻄﺎﻋﻢ:561001
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 17 of 46 46 ﻣﻦ17 ﺻﻔﺤﺔ
2020/06/21
452001:Repair, polishing and painting of motors vehicles ﺇﺻﻼﺡ ﻭﺳﻤﻜﺮﺓ ﻭﺩﻫﺎﻥ ﺍﻟﻤﺮﻛﺒﺎﺕ:452001
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 18 of 46 46 ﻣﻦ18 ﺻﻔﺤﺔ
2020/06/21
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 19 of 46 46 ﻣﻦ19 ﺻﻔﺤﺔ
2020/06/21
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 20 of 46 46 ﻣﻦ20 ﺻﻔﺤﺔ
2020/06/21
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 21 of 46 46 ﻣﻦ21 ﺻﻔﺤﺔ
2020/06/21
563001:Cafés (cafes that offer mainly drinks) ﺍﻟﻤﻘﺎﻫﻲ ﺍﻟﺘﻲ ﺗﻘﺪﻡ ﻣﺸﺮﻭﺑﺎﺕ ﺑﺸﻜﻞ ﺃﺳﺎﺳﻲ:563001
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 22 of 46 46 ﻣﻦ22 ﺻﻔﺤﺔ
2020/06/21
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 23 of 46 46 ﻣﻦ23 ﺻﻔﺤﺔ
2020/06/21
Reg. Date: 27/05/2015 ID: 42638902 42638902 :ﺍﻟﺮﻣﺰ 2015/05/27 :ﺗﺎﺭﻳﺦ ﺗﺴﺠﻴﻞ
Bait Alfalaj / Muttrah / Muscat Governorate ﻣﺤﺎﻓﻈﺔ ﻣﺴﻘﻂ/ ﻣﻄﺮﺡ/ ﺑﻴﺖ ﺍﻟﻔﻠﺞ
Reg. Date: 05/05/2006 ID: 2938582 2938582 :ﺍﻟﺮﻣﺰ 2006/05/05 :ﺗﺎﺭﻳﺦ ﺗﺴﺠﻴﻞ
Al Wadi Al Kabeer / Muttrah / Muscat Governorate ﻣﺤﺎﻓﻈﺔ ﻣﺴﻘﻂ/ ﻣﻄﺮﺡ/ ﺍﻟﻮﺍﺩﻱ ﺍﻟﻜﺒﻴﺮ
474201:Retail sale in specialized stores of household appliances ،ﺍﻟﺒﻴﻊ ﺑﺎﻟﺘﺠﺰﺋﺔ ﻓﻲ ﺍﻟﻤﺘﺎﺟﺮ ﺍﻟﻤﺘﺨﺼﺼﺔ ﻟﻸﺟﻬﺰﺓ ﺍﻟﻤﻨﺰﻟﻴﺔ )ﺍﻟﺮﺍﺩﻳﻮ:474201
(radio, television etc.) (ﺇﻟﺦ.. ﺟﻬﺎﺯ ﺗﺸﻐﻴﻞ ﺍﻗﺮﺍﺹ ﺍﻟﻔﻴﺪﻳﻮ ﺍﻟﺮﻗﻤﻴﺔ،ﺍﻟﺘﻠﻔﺰﻳﻮﻧﻲ
475207:Retail sale in specialized stores of construction materials ﺍﻟﺒﻴﻊ ﺑﺎﻟﺘﺠﺰﺋﺔ ﻓﻲ ﺍﻟﻤﺘﺎﺟﺮ ﺍﻟﻤﺘﺨﺼﺼﺔ ﻟﻤﻮﺍﺩ ﺍﻟﺒﻨﺎﺀ:475207
475903:Retail sale in specialized stores of household appliances ﻣﻌﺪﺍﺕ،ﺍﻟﺒﻴﻊ ﺑﺎﻟﺘﺠﺰﺋﺔ ﻓﻲ ﺍﻟﻤﺘﺎﺟﺮ ﺍﻟﻤﺘﺨﺼﺼﺔ ﻟﻸﺟﻬﺰﺓ ﺍﻟﻤﻨﺰﻟﻴﺔ )ﺍﻟﺜﻼﺟﺎﺕ:475903
(refrigirators, kitchen equipment etc.) ( ﺇﻟﺦ... ﺍﻟﻤﻄﺎﺑﺦ
Reg. Date: 24/01/2011 ID: 20140893 20140893 :ﺍﻟﺮﻣﺰ 2011/01/24 :ﺗﺎﺭﻳﺦ ﺗﺴﺠﻴﻞ
Al Wadi Al Kabeer / Muttrah / Muscat Governorate ﻣﺤﺎﻓﻈﺔ ﻣﺴﻘﻂ/ ﻣﻄﺮﺡ/ ﺍﻟﻮﺍﺩﻱ ﺍﻟﻜﺒﻴﺮ
Reg. Date: 05/07/2008 ID: 12892049 12892049 :ﺍﻟﺮﻣﺰ 2008/07/05 :ﺗﺎﺭﻳﺦ ﺗﺴﺠﻴﻞ
Al Wadi Al Kabeer / Muttrah / Muscat Governorate ﻣﺤﺎﻓﻈﺔ ﻣﺴﻘﻂ/ ﻣﻄﺮﺡ/ ﺍﻟﻮﺍﺩﻱ ﺍﻟﻜﺒﻴﺮ
433003:Plastering, painting and decorating (ﺃﻋﻤﺎﻝ ﺗﻨﻔﻴﺬ ﺍﻟﺘﺼﻤﻴﻢ ﺍﻟﺪﺍﺧﻠﻲ )ﺍﻟﺘﺠﺼﻴﺺ ﻭﺍﻟﻄﻼﺀ ﻭﺍﻟﺘﺰﻳﻴﻦ:433003
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 24 of 46 46 ﻣﻦ24 ﺻﻔﺤﺔ
2020/06/21
Reg. Date: 21/07/2012 ID: 26309585 26309585 :ﺍﻟﺮﻣﺰ 2012/07/21 :ﺗﺎﺭﻳﺦ ﺗﺴﺠﻴﻞ
Uwayfiyah / Bahla / Al Dakhiliyah Governorate ﻣﺤﺎﻓﻈﺔ ﺍﻟﺪﺍﺧﻠﻴﺔ/ ﺑــﻬـــﻼﺀ/ ﻋﻮﻳﻔﻴﺔ
452001:Repair, polishing and painting of motors vehicles ﺇﺻﻼﺡ ﻭﺳﻤﻜﺮﺓ ﻭﺩﻫﺎﻥ ﺍﻟﻤﺮﻛﺒﺎﺕ:452001
Reg. Date: 20/03/2005 ID: 2938575 2938575 :ﺍﻟﺮﻣﺰ 2005/03/20 :ﺗﺎﺭﻳﺦ ﺗﺴﺠﻴﻞ
Al Wadi Al Kabeer / Muttrah / Muscat Governorate ﻣﺤﺎﻓﻈﺔ ﻣﺴﻘﻂ/ ﻣﻄﺮﺡ/ ﺍﻟﻮﺍﺩﻱ ﺍﻟﻜﺒﻴﺮ
251105:Manufacture and installation of metal products made of ﺻﻨﻊ ﻭﺗﺮﻛﻴﺐ ﺍﻟﻤﻨﺘﺠﺎﺕ ﺍﻟﻤﻌﺪﻧﻴﺔ ﺍﻟﻤﺼﻨﻮﻋﺔ ﻣﻦ ﺃﺟﺰﺍﺀ ﻓﻲ ﺍﻟﻮﺣﺪﺓ ﺫﺍﺗﻬﺎ:251105
parts in the same unit used in construction such as doors, windows ﻭﺍﻟﻤﺴﺘﺨﺪﻣﺔ ﻓﻲ ﺍﻟﺒﻨﺎﺀ ﻭﺍﻟﺘﺸﻴﻴﺪ ﻣﺜﻞ ﺍﻟﻨﻮﺍﻓﺬ ﻭﺍﻷﺑﻮﺍﺏ ﻭﺍﻟﺴﻼﻟﻢ ﻭﺍﻟﻤﻈﻼﺕ ﻭﺃﺷﻐﺎﻝ ﻣﻌﺪﻧﻴﺔ
and their frames, shutters and gates (metal workshops) (ﻣﻤﺎﺛﻠﺔ )ﻭﺭﺵ ﺍﻟﺤﺪﺍﺩﺓ
Reg. Date: 05/05/2006 ID: 2938588 2938588 :ﺍﻟﺮﻣﺰ 2006/05/05 :ﺗﺎﺭﻳﺦ ﺗﺴﺠﻴﻞ
Al Wadi Al Kabeer / Muttrah / Muscat Governorate ﻣﺤﺎﻓﻈﺔ ﻣﺴﻘﻂ/ ﻣﻄﺮﺡ/ ﺍﻟﻮﺍﺩﻱ ﺍﻟﻜﺒﻴﺮ
474102:Retail sale in specialized stores of computers and non- ﺍﻟﺒﻴﻊ ﺑﺎﻟﺘﺠﺰﺋﺔ ﻓﻲ ﺍﻟﻤﺘﺎﺟﺮ ﺍﻟﻤﺘﺨﺼﺼﺔ ﻷﺟﻬﺰﺓ ﺍﻟﺤﺎﺳﺐ ﺍﻵﻟﻲ ﻭﺍﻟﺒﺮﺍﻣﺞ ﻏﻴﺮ:474102
customized software ﺍﻟﻤﻌﺪﺓ ﻛﻄﻠﺐ ﺍﻟﻌﻤﻴﻞ
Reg. Date: 13/05/2007 ID: 8392894 8392894 :ﺍﻟﺮﻣﺰ 2007/05/13 :ﺗﺎﺭﻳﺦ ﺗﺴﺠﻴﻞ
Darsit / Muttrah / Muscat Governorate ﻣﺤﺎﻓﻈﺔ ﻣﺴﻘﻂ/ ﻣﻄﺮﺡ/ ﺩﺍﺭﺳﻴﺖ
561001:Restaurants ﺍﻟﻤﻄﺎﻋﻢ:561001
Reg. Date: 28/08/2001 ID: 2938567 2938567 :ﺍﻟﺮﻣﺰ 2001/08/28 :ﺗﺎﺭﻳﺦ ﺗﺴﺠﻴﻞ
Al Qurm / Bousher / Muscat Governorate ﻣﺤﺎﻓﻈﺔ ﻣﺴﻘﻂ/ ﺑﻮﺷﺮ/ ﺍﻟﻘﺮﻡ
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 25 of 46 46 ﻣﻦ25 ﺻﻔﺤﺔ
2020/06/21
Reg. Date: 01/01/2008 ID: 10549460 10549460 :ﺍﻟﺮﻣﺰ 2008/01/01 :ﺗﺎﺭﻳﺦ ﺗﺴﺠﻴﻞ
Sohar Industrial City (Madayn) / Sohar / North Al Batinah ﻣﺤﺎﻓﻈﺔ ﺷﻤﺎﻝ ﺍﻟﺒﺎﻃﻨﺔ/ ﺻﺤﺎﺭ/ (ﻣﺪﻳﻨﺔ ﺻﺤﺎﺭ ﺍﻟﺼﻨﺎﻋﻴﺔ )ﻣﺪﺍﺋﻦ
ﺻﻨﻊ ﺍﻷﺑﺪﺍﻥ ﺍﻟﻤﺼﻤﻤﺔ ﺑﻤﺎ ﻓﻴﻬﺎ ﺍﻟﻤﻘﺼﻮﺭﺍﺕ ﻟﺘﺮﻛﻴﺒﻬﺎ ﻋﻠﻰ ﻫﻴﺎﻛﻞ ﺫﺍﺕ:292001
292001:Manufacture of bodies, including cabs for motor vehicles
ﻣﺤﺮﻛﺎﺕ
Reg. Date: 10/12/2019 ID: 45639781 45639781 :ﺍﻟﺮﻣﺰ 2019/12/10 :ﺗﺎﺭﻳﺦ ﺗﺴﺠﻴﻞ
Ghala / Bousher / Muscat Governorate ﻣﺤﺎﻓﻈﺔ ﻣﺴﻘﻂ/ ﺑﻮﺷﺮ/ ﻏﻼﺀ
Reg. Date: 22/08/2001 ID: 2938565 2938565 :ﺍﻟﺮﻣﺰ 2001/08/22 :ﺗﺎﺭﻳﺦ ﺗﺴﺠﻴﻞ
Muttrah / Muttrah / Muscat Governorate ﻣﺤﺎﻓﻈﺔ ﻣﺴﻘﻂ/ ﻣﻄﺮﺡ/ ﻣﻄﺮﺡ
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 26 of 46 46 ﻣﻦ26 ﺻﻔﺤﺔ
2020/06/21
Reg. Date: 22/05/2005 ID: 2938553 2938553 :ﺍﻟﺮﻣﺰ 2005/05/22 :ﺗﺎﺭﻳﺦ ﺗﺴﺠﻴﻞ
Sohar / North Al Batinah Governorate / ﺍﻟﻬﻤﺒﺎﺭ ﻣﺤﺎﻓﻈﺔ ﺷﻤﺎﻝ ﺍﻟﺒﺎﻃﻨﺔ/ ﺻﺤﺎﺭ/ ﺍﻟﻬﻤﺒﺎﺭ
Reg. Date: 14/04/2015 ID: 41719183 41719183 :ﺍﻟﺮﻣﺰ 2015/04/14 :ﺗﺎﺭﻳﺦ ﺗﺴﺠﻴﻞ
Bait Alfalaj / Muttrah / Muscat Governorate ﻣﺤﺎﻓﻈﺔ ﻣﺴﻘﻂ/ ﻣﻄﺮﺡ/ ﺑﻴﺖ ﺍﻟﻔﻠﺞ
475301:Retail sale in specialized stores of carpets and rugs ﺍﻟﺒﻴﻊ ﺑﺎﻟﺘﺠﺰﺋﺔ ﻓﻲ ﺍﻟﻤﺘﺎﺟﺮ ﺍﻟﻤﺘﺨﺼﺼﺔ ﻟﻠﺴﺠﺎﺩ ﻭﺍﻟﻤﻮﻛﻴﺖ:475301
475901:Retail sale in specialized stores of household furniture ﺍﻟﺒﻴﻊ ﺑﺎﻟﺘﺠﺰﺋﺔ ﻓﻲ ﺍﻟﻤﺘﺎﺟﺮ ﺍﻟﻤﺘﺨﺼﺼﺔ ﻟﻸﺛﺎﺙ ﺍﻟﻤﻨﺰﻟﻲ:475901
Reg. Date: 28/06/2015 ID: 43400532 43400532 :ﺍﻟﺮﻣﺰ 2015/06/28 :ﺗﺎﺭﻳﺦ ﺗﺴﺠﻴﻞ
Bait Alfalaj / Muttrah / Muscat Governorate ﻣﺤﺎﻓﻈﺔ ﻣﺴﻘﻂ/ ﻣﻄﺮﺡ/ ﺑﻴﺖ ﺍﻟﻔﻠﺞ
951100:Repair of computers and peripheral equipment ﺇﺻﻼﺡ ﻭﺻﻴﺎﻧﺔ ﺃﺟﻬﺰﺓ ﺍﻟﺤﺎﺳﻮﺏ ﻭﺍﻟﻤﻌﺪﺍﺕ ﺍﻟﻄﺮﻓﻴﺔ ﻟﻠﺤﺎﺳﻮﺏ:951100
Reg. Date: 01/04/2013 ID: 29139970 29139970 :ﺍﻟﺮﻣﺰ 2013/04/01 :ﺗﺎﺭﻳﺦ ﺗﺴﺠﻴﻞ
Al Wadi Al Kabeer / Muttrah / Muscat Governorate ﻣﺤﺎﻓﻈﺔ ﻣﺴﻘﻂ/ ﻣﻄﺮﺡ/ ﺍﻟﻮﺍﺩﻱ ﺍﻟﻜﺒﻴﺮ
432203:Installation and maintenance of fire sprinkler systems ﺗﺮﻛﻴﺐ ﻭﺇﺻﻼﺡ ﻧﻈﻢ ﻣﺮﺷﺤﺎﺕ ﻭﻣﻘﺎﻭﻣﺔ ﺍﻟﺤﺮﻳﻖ:432203
The Commercial Registration is not considered as an approval or a ﻻ ﻳﻌﺘﺒﺮ ﻫﺬﺍ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻣﻮﺍﻓﻘﺔ ﺃﻭ ﺿﻤﺎﻧﺎ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺮﺧﻴﺺ ﺑﺎﺳﺘﻘﺪﺍﻡ ﻗﻮﻯ
warranty for a license of bringing in labour. .ﻋﺎﻣﻠﺔ ﻭﺍﻓﺪﺓ
: ﺇﻋﺎﺩﺓ ﻃﺒﺎﻋﺔ
IMAN ABDUL
ﺃﻣﺎﻧﺔ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ
Page 27 of 46 46 ﻣﻦ27 ﺻﻔﺤﺔ
2020/06/21
IN ACCORDANCE WITH
EN ISO 9001:2015
QUALITY MANAGEMENT SYSTEM REQUIREMENTS
EN ISO 14001:2015
ENVIRONMENTAL MANAGEMENT SYSTEM REQUIREMENTS
OHSAS 45001:2018
OCCUPATIONAL HEALTH & SAFETY MANAGEMENT SYSTEM REQUIREMENTS
This manual is the property of AL HAJIRY TRADING LLC and the Manual
Holder shall not transfer any information without written approval from
Managing Director.
CHAPTER
0B DESCRIPTION REV DATE ISO 9001 ISO 14001 OHSAS
Ref. Cl. Ref. Cl. 45001
Ref. Cl.
1 Cover Page 0 03-11-19 - - -
2 Table of Contents 0 03-11-19 - - -
3 Revision History 0 03-11-19 - - -
4 Abbreviations & Definitions 0 03-11-19 - - -
Company profile & Organization 0 03-11-19
5
Structure
Sec 5.1 Introduction
Sec 5.2 Our Vision
Sec 5.3 Our Mission
Sec 5.4 Context of the Organization 4.3 4.1 4.1
Sec 5.5 Internal /External Issues 4.3
Sec 5.6 Interested Parties 4.3 4.2 4.2
Sec 5.7 Corporate Profile
Sec 5.8 Organization Structure
6 IMS Scope Statement & Exclusions 0 03-11-19 - - -
Sec 6.1 Scope Statement 4.2.2 4.3 4.3
Sec 6.2 Exclusions 4.2.2
Divisions & Activities of 4.2.2
Sec 6.3
Al Hajiry Trading LLC
7 IMS Policy & System 0 03-11-19 - - -
Sec 7.1 IMS Policy Statement 5.3 5.2 5.2
Sec 7.2 Integrated Management System 4.1, 4.2 4.4 4.4
8 Management Commitment 0 03-11-19
Sec 8.1 Leadership 5.1 5.1 5.1
Responsibility, Authority, 5.5 5.3 5.3
Sec 8.2
Accountability & Communication
Sec 8.3 Participation & Consultation - 5.4 5.4
Sec 8.4 Customer Focus 5.2 - -
Sec 8.5 Management Review 5.6 9.3 9.3
IMS Planning & Resource 0 03-11-19
9
Management
4.1, 4.2, 6 6
Sec 9.1 IMS Planning
5.4
6.1, 6.2 7.1,7.2 7.1,7.2
Sec 9.2 Resource Management
Sec 9.3 Infrastructure 6.3
Sec 9.4 Work Environment 6.4
Sec 9.5 Risk & Management Analysis 6.1 6.1, 8.1.2 6.1, 8.1.2
Sec 9.6 Contingency Planning 6.3
10 IMS Implementation 0 03-11-19
Sec 10.1 Planning for Product Realization 7.1
Customer Related Process – 7.2
Sec 10.2
Realization Process
Design & Development – Realization 7.3
Sec 10.3
Process (EXCLUDED)
Sec 10.4 Purchasing – Realization Process 7.4
Product & Service Provision – 7.5
Sec 10.5
Realization Process
Sec 10.6 Control of Monitoring & Measuring 7.6
I I
fin compliance with ISO 9001 :2008, ISO 14001 :2004 and OHSAS 45001 :20181
� REV. 0 ISSUE 04 Page 1 of 1
AL HAJIRY DATED 03-11-19 DATED 03-11-19
Pre Checked B
Hana Al Haddi
Qua/it AUDITOR - HO
Marlene Varghese
Corporate Management
Representative (CMR)
S m Varghese
Mana in Director
-
CHAPTER 4
4.1 ABBREVIATIONS
AHT Al Hajiry Trading LLC (Incl. all its divisions & activities)
CAR Corrective and Preventive Action Request
CMR Corporate Management Representative
DM Divisional Manager
ED Executive Director
FM Finance & Administration Manager
GM – S P & C Strategic Planning & Control
HR Human Resources
HSE Health, Safety & Environment
IMS Integrated Management System
IMSM Corporate IMS Manual
ISO International Organization for Standardization
MD Managing Director
NC Non-Conformance
NCR Non-Conformance Report
OHSAS Occupational Health and Safety Assessment Series
QHSE Quality, Health, Safety & Environment
4.2 DEFINITIONS
Near Miss Any event which had the potential to cause injury
and/or damage and/or loss, but which was
avoided by circumstances.
CHAPTER 5
5.1 INTRODUCTION
AHT shall determine external and internal issues that are relevant to
its purpose and its strategic direction and that affect its ability to
achieve the intended result(s) of its quality management system.
AHT started as a modest steel fabrication facility in 1994. Over the years
the business has grown and diversified into number of areas. At present
the Company has twelve divisions, with the head office (Bait Al Hajiry) at
Gr. Muttrah, MBD, Ruwi Area and divisional offices at various locations (Al
Wadi Al Kabir, Qurum, Sohar etc.)
The Divisions and activities are as given below:
M.S & S.S); Pipe Fittings (Flanges, Gaskets etc.); Hammer Unions;
Hydraulic & Pneumatic Hoses; Compression Fittings; Pressure &
temperature gauges; Tools (manual & power)
Note: Please refer Appendix-1 for the Corporate Organization chart and
the Divisional Organization Charts
CHAPTER 6
The scope of IMS, which complies with the requirements of ISO 9001:2015
(Quality Management System requirements), ISO14001:2015
(Environmental Management System requirements) and OHSAS
45001:2018 (Occupational Health & Safety Management System
requirements), covered by the activities of AHT is as follows:
6.2 EXCLUSIONS
The following clauses of the standard ISO 9001:2015 are not applicable to
the IMS in context of AHT’s operations:
7.3 Design & Development – This clause is excluded for all divisions as
Design data and specifications are obtained from the customer. The work
or service offered is based on these documents. The customer designs the
product to be made by AHT.
CHAPTER 7
IMS Policy Statement (AHC-01-01, latest issue) has been displayed at all
key locations across the organization. This IMS Policy is a statement of
internal discipline and an external assurance of our intention to
consistently meet or exceed customer requirements, meanwhile ensuring
that we do not jeopardize the environment and the health and safety of
our employees or interested parties. It provides the basis for our IMS and
the guiding plan for all our activities. Also sufficient care has been taken to
meet all the statutory and regulatory requirements of the country in which
we operate (Sultanate of Oman) and also follow the international
standards and other requirements wherever applicable.
7.2.1.1 ISO 9001:2015 - The IMS takes into account the requirements of
this standard. It ensures a strong Quality perspective and
continual improvement of the system. The mandatory
documents & Records required by the standard are maintained
as follows:
DOCUMENTS:
• SCOPE OF THE MANAGEMENT SYSTEM
• QUALITY POLICY
• QUALITY OBJECTIVES
RECORDS:
• REVIEW OF REQUIREMENTS FOR PRODUCTS AND SERVICES
• DESIGN AND DEVELOPMENT.
• SUPPLIER EVALUATION
• UNIQUE IDENTIFICATION – (E.G. SERIAL / BATCH NUMBER) IF
TRACEABILITY IS REQUIRED
• CHANGE CONTROL – REVIEWS, ACTIONS, AUTHORISATIONS
7.2.1.3 OHSAS 45001:2018 – The third standard covered by the IMS is one
that focuses on the Occupational Health and Safety of the AHT
personnel at work and also ensuring that AHT activities do not
cause any harm to visitors or members of the public. The specific
requirement of this standard (AHT document no. in brackets) are
as follows:
• Hazard Identification, Risk Assessments and determination of
controls (AHC-03-04)
• Legal and Other requirements – Identification, Compliance &
Evaluation of compliance (AHC-03-02)
7.2.2.1 General
AHT maintains a documented IMS as described in the IMSM. The
documented system ensures product/service conformance to
customer requirements and conformance to the requirements of
standards. The following documents are maintained as part of
the implementation process:
b) IMS Manual
AHT has prepared a Corporate IMS Manual (AHC-01-02) that
describes the company’s methods for establishing, implementing
and maintaining its integrated management system that focuses
on meeting the requirements of the standards.
c) IMS Procedures
In addition to this manual, AHT has prepared documented
procedures consistent with the requirements of the standards
and Control of Documents (AHC-02-03) procedure. A list of IMS
Procedures (Corporate and Divisional) can be found at the end
of this manual in Appendix-3 & Appendix-4 respectively.
d) IMS Records
IMS records are maintained in a manner that facilitates retrieval
for the period of time specified in the relevant procedure. An IMS
procedure Control of Records (AHC-02-04) is used for
identification, storage, protection, retrieval, retention and
disposal of records.
CHAPTER 8
8.1 LEADERSHIP
8.2.2 Accountability
An important part our IMS implementation initiative is for employees
at all levels to take responsibility and be accountable for their
actions, which are under their control. This is particularly true for
activities related to health and safety. And this is communicated to
them in their job descriptions and it is the responsibility of their
department manager to ensure that all the systems are followed.
8.2.4 Communication
The management has established a system of communication.
Internal Communication – AHT has established an internal system of
communication. An IMS procedure (Internal & External
Communication AHC-02-05) is written to establish, implement and
maintain a system for internal communication among various levels
in the organization and for communication with contractors and
other visitors to the workplace.
External communication – AHT also has means of communicating
information externally. This may include the general public,
interested parties or anybody outside AHT, referred to as neighbor.
An IMS procedure (Internal & External Communication AHC-02-05) is
written to establish, implement and maintain a system for receiving,
documenting and responding to relevant communications from
external interested parties.
8.4.1 General
The focus shall always be on achieving customer requirements. All
requirements either identified by customer themselves or by AHT are
8.5.1 General
The management periodically reviews the IMS to determine its
continuing suitability and effectiveness in terms of the company IMS
policy and the requirements of the standard. The Managing
Director shall chair the Management Review meeting where they
evaluate the need for changes to the IMS, including Policy and
Objectives, where appropriate. The details are covered in the
Management Review and IMS Audits procedure (AHC-02-01)
CHAPTER 9
9.3 INFRASTRUCTURE
The AHT Management ensures that proper infrastructural needs are
identified in line with growth of the organization and that they are
provided without any delay. The Management Review meeting
forms one of the forums where the infrastructural requirements are
discussed. The Divisional managers (DM) will present their budgetary
requirements in the Budget meeting at the beginning of the year.
And also discuss their specific requirements with MD and implement
the same.
CHAPTER 10
IMS IMPLEMENTATION
CORPORATE IMS MANUAL [AHC-01-02]
Chapter 10 – IMS IMPLEMENTATION
[In compliance with ISO 9001:2015, ISO 14001:2015 and OHSAS 45001:2018]
REV. 0 ISSUE 04 Page 1 of 8
DATED 03-11-19 DATED 03-11-19
The AHT management team plans for the product realization by suitably
identifying the required processes. While some processes may already be
available, other new ones will have to be established and implemented.
The required verification, validation, monitoring, inspection and test
activities specific to the work will be identified and implemented. All
environmental and occupational health and safety aspects shall be
considered during the planning stage.
10.3.1 This clause (Cl.7.3) of the standard is EXCLUDED from the scope of
the IMS. This is due to the reason that AHT does not design any of its
products or provide design services for any of the activities within
the scope of the IMS. All activities are carried out as per the
customer requirements. Customer gives their requirements to AHT
and accordingly AHT provides the required product or service
Note: The Corporate IMS HSE procedures listed in Appendix III includes
Mandatory procedures applicable across all the divisions and
Operational Control procedures whose applicability depends upon
the activities of the respective division.
This forms the most important health & safety aspect of the IMS. The
hazards are always a part of the activities that we engage in and it is our
endeavor to ensure that they are eliminated or reduced. The risk factor
associated with these hazards is also determined and mitigation measures
are taken to reduce the impact of the hazard. Risk assessments are
carried out to assess the risk of the hazards. The risk assessments done in
the respective division is carefully documented and distributed to the
concerned party. These risk assessments are reviewed on a periodic basis
for their relevance and effectiveness to the current activities. The Hazard
Identification, Risk Assessment and Control (AHC-03-04) procedure details
the method for carrying out this process.
AHT will maintain a process for MOC, The facility will ensure that the
integrity of the QMS is maintained when changes to the QMS are planned
and implemented.
For Management of Change, the procedure: Risk Assessment,
Management, Contingency Planning (AHT-02-09) and Management of
Change (AHT-02-10) shall maintain a process for the management of
change, Identify the potential risks associated with the change and any
required approvals prior to the introduction of such changes and maintain
records of the Management of Change Activities.
When AHT determines the need for changes to the quality management
system, the changes shall be carried out in a planned manner and shall
consider the
CHAPTER 11
11.1 GENERAL
External Audits – External audits are usually of two categories viz. 2nd
Party and 3rd Party. 2nd party audits are conducted by customers on
the activities of AHT and 3rd party audits are conducted by
certification body on the IMS to verify conformity with requirements.
3rd party certifications audits are performed every 3 years and
surveillance audits are conducted every 9-12 months. These audit
reports are stored safely and all follow-up actions from these audits
are implemented on top priority basis.
data are collected on QHSE parameters. The data collected from these
requirements are analysed and evaluated in the Management Review
meeting and management takes suitable action for items that do meet
specified criteria.
11.6 IMPROVEMENT
APPENDIX - I
Provision of:
• Work Environment
• Infrastructure
• HSE Operational Control Procedures (AHC-03-07 to AHC-03-19)
DIVISION (OFS)
• IMS Policy (AHC-01-01)
• Corporate IMS Manual (AHC-01-02)
• Corporate IMS Mgt Procedures (AHC-02-01 to 07)
• Corporate IMS HSE Procedures (AHC-03-01 to 19)
Management • Job Descriptions Manual (OFS-05-01)
Responsibility
Provision of:
• Work Environment
• Infrastructure
• HSE Operational Control Procedures (AHC-03-07 to AHC-03-19)
Provision of:
• Work Environment
• Infrastructure
• HSE Operational Control Procedures (AHC-03-07 to AHC-03-19)
Provision of:
• Work Environment
• Infrastructure
• HSE Operational Control Procedures (AHC-03-07 to AHC-03-19)
Provision of:
• Work Environment
• Infrastructure
• HSE Operational Control Procedures (AHC-03-07 to AHC-03-19)
SERVICES (IPS)
• Corporate IMS Manual (AHC-01-02)
• Corporate IMS Mgt Procedures (AHC-02-01 to 07)
• Corporate IMS HSE Procedures (AHC-03-01 to 19)
Management • Job Descriptions Manual (IPS-05-01)
Responsibility
Provision of:
• Work Environment
• Infrastructure
• HSE Operational Control Procedures (AHC-03-07 to AHC-03-19)
Provision of:
• Work Environment
• Infrastructure
• HSE Operational Control Procedures (AHC-03-07 to AHC-03-19)
Customer Customer
ISO 14001:2015
Requirements Satisfaction
Environmental
Management System
Provision of:
• Work Environment
• Infrastructure
• HSE Operational Control Procedures (AHC-03-07 to AHC-03-19)
APPENDIX - II
ORGANIZATION CHARTS
ORGANIZATION CHARTS Appendix – II
Rev: 0, dtd03.11.19
Page 1 of
Issue: 04
11
CHAIRMAN
NASSER BIN KHAMIS AL-HASHAR
MANAGING DIRECTOR
GM- S P & C
SAM VARGHESE
(FINANCE/ADMIN)
CORPORATE MANAGEMENT GROUP HSE
REPRESENTATIVE (CMR) MANAGER
LEGEND:
MED – Mechanical Engineering; PRJ– Projects ; AMR– Al Maha rent-a-car;TTC – Technical
Transport Center; ITD – Information Technology;OFS – Oilfield Supplies and Services; TTD –
Tidytec and Tidyskip; IPS – Industrial Products and Services; AHE – Electronics;
; R&B – Roads & Bridges; S P & C – Strategic Planning & Control
GM- S P & C
Director
PRO Mechanical Engineering
Accountant
Sales / Sr. Sales QC HSE QA
Purchase Assistants Maintenance Estimators Marketing Engineer Inspectors Advisors Engineer
Assistants Technicians Engineers
PROJECTS DIVISION
Chairman
Nasser Bin Khamis Al-Hashar
Managing Director
Sam Varghese Corporate Management
Representative
GM- S P & C
Executive Director
Jason Sam Varghese
Group HSE
Manager
HOD
Projects Division
Chairman
Nasser Bin Khamis Al-Hashar
Managing Director
GM- S P & C Sam Varghese Corporate Management
Representative
Divisional Manager
Tidytec and Tidyskip Group HSE
Manager
HR Manager/
Admin Officer
PRO Operations/Administration
Accountant Sales Executives Operations Manager Executive
Accounts
Cleaning Supervisors Pest Control Supervisors Waste Management
Assistant
Supervisors
Indirect Link
CMR Link
Chairman
Nasser Bin Khamis Al-Hashar
Managing Director
GM- S P & C Sam Varghese Corporate Management
Representative
Divisional Manager
Oilfield Supplies & Group HSE
HR Manager/ Services Manager
Admin Officer
Sales
Coordinator
Delivery Men
Indirect Link
CMR Link
Chairman
Nasser Bin Khamis Al-Hashar
Managing Director
GM- S P & C Sam Varghese Corporate Management
Representative
Accounts Manager PRO Operations Manager Asst Sales Manager HSE Coordinator
Accountant
Drivers
Cashier
Indirect Link
CMR Link
Managing Director
GM- S P & C Sam Varghese Corporate Management
Representative
Divisional Manager
TechnicalTransportCenter
Indirect Link
CMR Link
Chairman
Nasser Bin Khamis Al-Hashar
Managing Director
Group HSE
GM- S P & C Sam Varghese Corporate Management
Manager
Representative
General Manager
HR Manager/ Al Maha rent-a-car HSE Coordinator
Admin Officer TechnicalTransportCenter&
Information Technology Secretary/Admin
Divisional Manager
Information Technology
ELECTRONICS DIVISION
Chairman
Nasser Bin Khamis Al-Hashar
Managing Director
GM- S P & C Sam Varghese Corporate Management Group HSE
Representative Manager
Divisional Manager
Electronics Division
HR Manager/ HSE Coordinator
Admin Officer
Supervisors
Indirect Link
CMR Link
Technicians Electricians Drivers
Asst. Technicians
FURNIISHING DIVISION
Chairman
Nasser Bin Khamis Al-Hashar
Managing Director
GM- S P & C Sam Varghese Corporate Management Group HSE
Group Finance Manager Representative Manager
Divisional Manager
Furnishing Division
Accounts Manager Hari S Nair HSE / Sales
Coordinator
Indirect Link
Site Supervisors
CMR Link
Technicians Driver
Managing Director
GM- S P & C Sam Varghese Corporate Management Group HSE
Representative Manager
Divisional Manager
Industrial Products &
HR Manager/ Services HSE Coordinator
Admin Officer
Indirect Link
Supervisors
CMR Link
Asst. Technicians
APPENDIX - III
The procedures listed below are applicable to all the divisions and their activities that fall within the scope of
the Integrated Management System. They fulfill the mandatory requirements of the standard. The procedures
are as follows:
APPENDIX - IV
In order to facilitate effective and efficient implementation of the Integrated Management System, each of
the divisions, based on the length and breadth of its scope, has separate IMS procedures and they are listed
below:
2.4 Incoming Weld MED-04-09 (IMS Verification-100% ASME Sec. II Part QC Inspector Weld H R R
Consumable Procedure- C. Consumable
Inspection (Incl. Inspection & Batch Certificates
Batch Certificate Testing Control) EN 10204 3.1
verification)
2.5 Welding consumable MED-06-02 [IMS Verification-100% Weld Consumable Store In-charge Electrode Backing H R R
storage and control Procedure- Batch Certificates & QC Inspector Register & and
welding Issue Record
consumable Weld consumables
control shall be free from
procedure] & damages, defects
Manufacturer’s and deterioration
Recommendation
2.6 Calibration of [IMS Procedure] - Verification-100% Valid Calibration QC Inspector Calibration Status H R R
Inspection, MED-04-12 & certificates & Record
Measuring & Testing Manufacture’s Accuracy as per [MED-08-116]
Equipments Procedure for product
calibration specification
Examination,
4.2 Review & Approval MED-04-10 Review 100% prior Shall comply with QC Inspector Subcontractor H R R
of NDT operators (IMS Procedure- to start of work s/c Written Practice NDT Operator's
qualifications Non-Destructive Qualification
Testing & Records
Examination
5.0 FABRICATION
5.1 Fit-up Inspections MED-04-09 & Dimensional Check Approved Drawings QC Inspector Dimension H R R
Approved – 100% Inspection Report
Drawings – MED-08-086
5.2 Weld Visual & MED-04-09, Visual & AWS D1.1 Sec 6.9 QC Inspector Weld Visual H S R
Dimensional Approved WPS Dimensional Check Inspection Report
Inspection - 100% -MED-08-087
5.3 Clearance for MED-04-09 Verification-100% Approved Drawing QC Inspector Weld Visual H R R
Blasting / Painting [Inspection & & Inspection Inspection Report
Testing Control Reports -MED-08-087
Procedure] &
BLASTING / PAINTING INSPECTION & DOCUMENTATION
6.0 SAFETY PRECAUTION
6.1 Working Practices
MED-04-09 (IMS Verification-100% Check requirements Blasting / - H R R
Surface - prior to start the for working on Painting
Preparation & job operating Supervisor
Coating Equipment
Procedure )
7.0 BLASTING EQUIPMENT
7.1 Check Moisture in MED-04-09 (IMS Verification-100% Trapped moisture Blasting / - W R R
Air compressor Surface - prior to start the by regular Purging Painting
Preparation & job & Supervisor
9.2 Measuring and MED-04-12 & Verification-100% Valid Calibration QC Inspector EMTE Calibration H R R
Testing Equipment’s
Manufacture’s certificates. Status Record
Procedure for [MED-08-116]
calibration
9.0 MATERIAL STORAGE
10.1 Abrasives MED-04-09 Verification-100% MED-06-03 QC Inspector Manufacturer’s W R R
[Steel Grit] Data sheet
10.2 Paint Material MED-04-09 Verification-100% MED-06-03 QC Inspector Manufacturer’s W R R
[Base, Solvent, Product Data
Thinner] sheet & Safety
Data Sheet
10.0 WEATHER CONDITION [BLASTING & PAINTING]
10.1 Check atmospheric MED-04-09 & prior to start of MED-06-03 & QC Inspector Painting H R R
conditions & Manufacturers blasting / Painting Manufacturer’s Inspection Report
Data sheet Process Product Data sheet [MED-08-090]
11.0 SURFACE PREPARATION
11.1 Check surface MED-04-09 & 100 % Visual MED-06-03 QC Inspector Painting H R R
condition prior to & Manufacturers Inspection Inspection Report
14.2 Intermediate coating MED-04-09 & Verification-100% 1 hour fire rated QC Inspector Painting H R R
to be 1 hour fire & Manufacturers Inspection Report
rated intumescent Data sheet [MED-08-090]
coating.
This is applicable
only for Primary
Members. This
activity shall be
Painting
inspection report
MED-08-090
16.0 ERECTION AT SITE
16.1 Installation of items Approved Visual Inspection All Materials should QC Inspector DO H R R
received from Drawings be suitably
workshop identified
16.2 Final dimension and AFC drawings Visual Inspection Dimensions shall be QC Inspector Job Completion H W W
alignment inspection as per GA drawings Certificate –
of erected item MED-08-166
Items shall be free
from visual weld
and mechanical
defects
Aligned as per GA
drawings
TECHNICAL
CAPABILITIES
ON THE DESIGN, MODELING
DETAILING & DOCUMENT MANAGEMENT
OF STRUCTURAL STEEL WORKS
www.alhajiry.com
Pre-qualification Document - Technical Capabilities
Engineering
Our
Engineering Team
Engineering Manager
Modeler
Designer Drafstman
Modeler
Drafstman
Checker
Doc Control
Modeler
Modeler
www.alhajiry.com
Pre-qualification Document - Technical Capabilities
Engineering
Structural Design
and Detailing Facility
www.alhajiry.com
Pre-qualification Document - Technical Capabilities
Engineering
Structural Design
Practices
Our Design practices are in line with the International Standards & Codes
www.alhajiry.com
For the Engineering, Fabrication, ISO 45001
1
IS
00
O
ISO 45001 S STAMP
14
Q1-3308
90
O
01
Building Products
IS
FABRICATION
FABRICATION RESOURCES
RESOURCES
&
& CAPABILITIES
CAPABILITIES
Sohar
area 20,000 m²
750 tons/month
Muscat
area 20,000 m²
500 tons/month
Samail
area 55,000 m²
Nizwa
area 40,000 m² 1,500 tons/month
60,000 m²/month
500 tons/month
04 Workshops
Fabrication workshops
in the Sultanate of Oman
60,000 m² /month
Production of profile sheets
and sandwich panel
Mechanical Engineering
www.alhajiry.com
Fabrication Workshop
1 no
1 no
1 no
1 no
1 no
1 no
1 no
Mechanical Engineering
www.alhajiry.com
Fabrication Workshop
2 nos
1 no
1 no
2 nos
1 no
2 nos
1 no
Mechanical Engineering
www.alhajiry.com
Fabrication Workshop
1 no
4 nos
4 nos
2 nos
Mechanical Engineering
www.alhajiry.com
Fabrication Workshop
20,000
750 tons/month
1 no
1 no
1 no
1 no
1 no
1 no
Mechanical Engineering
www.alhajiry.com
Fabrication Workshop
Muscat
20,000
500 tons/month
1 no
1 no
1 no
1 no
Mechanical Engineering
www.alhajiry.com
Fabrication
Resources and Capabilities
PRODUCT
GUIDE
Petrofac
دﻟﻳل
Al Ansari
اﻟﻣﻧﺗﺞ
A Division of
API Q1-3308 & 4F-0284
Al Hajiry ISO 9001:2015 (API,TUV,SUD) 4F-0284 Q1-3308
Almec ®
Trims & Accessories
www.alhajiry.com
Almec ® Almec ®
www.alhajiry.com
CC-02
06-11-21 V2
Almec ®
Sandwich Panel
AM WP 1000 ®
Micro Rib Flat Panel
www.alhajiry.com
Almec ®
Sandwich Panel
AM CP 1000 ®
Cold Room Panel
Multi-application
Cold Storage Panel
www.alhajiry.com
AM 45/250 ® Aluminum
Almec ®
Single Skin Profile Sheet
Specification
Almec ®
Single Skin Profile Sheet
AM 45/250 ®
www.alhajiry.com
AM 45/250 ® GI (Galvanized Iron)
Almec ®
Single Skin Profile Sheet
0.35 (28ga) 3.351 4.64 1.84 0.65
0.40 (26ga) 3.830 5.31 2.10 0.74
0.45 (25ga) 4.380 5.98 2.36 0.83 AM 38/200 ®
0.50 (24ga) 4.870 6.65 2.62 0.92
0.55 (23ga) 5.360 7.31 2.89 1.01
0.60 (22ga) 7.98 3.15 1.10
0.70 (21ga) 9.31 3.67 1.29
AM 38/200 ® Aluminum
www.alhajiry.com
AM 38/200 ® GI (Galvanized Iron)
Loads
KN/m² Stress L/100 L/150 L/200 Stress L/100 L/150 L/200 Stress L/100 L/150 L/200
www.alhajiry.com
Almec ®
Single Skin Profile Sheet
AM 35/250 ®
AM 35/250 ® Aluminum
www.alhajiry.com
AM 35/250 ® GI (Galvanized Iron)
www.alhajiry.com
Almec ®
Decking Profile Sheet
AM-45/150 ®
Specification
Thickness: 0.6 mm to 1.0 mm
www.alhajiry.com
Almec ®
Purlins 202Z20
AM Z 100-300 ®
AM C 100-300 ®
15 15 15 15 15 15 15 15
Specification
Thickness: 1.5 mm to 2.5 mm
Almec ®
Purlin
AM Z 100-300 ®
Note: Length, hole, pitch shall be as per
Client shop drawings
15
51
15 15 15 15 15 15 15 15
15
51
www.alhajiry.com
Almec ®
Purlin
AM C 100-300 ®
www.alhajiry.com
Almec ® All the flashing will be produced from the same material and finish as roof
and wall panels. Maximum length of flashing shall be 3000 mm
Trims & Accessories Color shall be as per RAL value
(ref. RAL color chart - back cover page)
Specification
Framed
Curved Sheet Eave Gutter Hood Trim Opening
www.alhajiry.com
TEST DESCRIPTION
RESULTS
VISUAL EXAMINATION OF COMPLETED WELD (QW-302.4) : ACCEPTABLE
VISUAL EXAMINATION REPORT NO AHT/QC/WQT/WV/2017/02
ALTERNATIVE VOLUMATRIC EXAMINATION RESULTS (QW-191): RT / UT : ACCEPTABLE [RT]
RADIOGRAPHIC TEST REPORT NO AHT/QC/WQT/2017/08
OTHER TESTS
FILM (OR) SPECIMENS EVALUATED BY: Atul Singh COMPANY: HITECH INSPECTION SERVICES
MECHANICAL TEST CONDUCTED BY: N/A LABORATORY TEST REPORT NO: N/A
WELDING SUPERVISED BY: Nidhin George Ipe
DATE OF WELD: 02.08.2017
WE CERTIFY THAT THE STATEMENTS IN THIS RECORD ARE CORRECT AND THAT TEST COUPONS WERE PREPARED , WELDED AND TESTED IN
ACCORDANCE WITH THE REQUIREMENTS OF ASMESEC IX ED 2015.
TEST DESCRIPTION
RESULTS
VISUAL EXAMINATION OF COMPLETED WELD (QW-302.4) : ACCEPTABLE
VISUAL EXAMINATION REPORT NO AHT/QC/WQT/WV/2017/05
ALTERNATIVE VOLUMATRIC EXAMINATION RESULTS (QW-191): RT / UT : ACCEPTABLE [RT]
RADIOGRAPHIC TEST REPORT NO AHT/QC/WQT/2017/15
OTHER TESTS
FILM (OR) SPECIMENS EVALUATED BY: SUNIL KUMAR COMPANY: HITECH INSPECTION SERVICES
MECHANICAL TEST CONDUCTED BY: N/A LABORATORY TEST REPORT NO: N/A
WELDING SUPERVISED BY: Nidhin George Ipe
DATE OF WELD: 04.10.2017
WE CERTIFY THAT THE STATEMENTS IN THIS RECORD ARE CORRECT AND THAT TEST COUPONS WERE PREPARED , WELDED AND TESTED IN
ACCORDANCE WITH THE REQUIREMENTS OF ASMESEC IX ED 2015.
TEST DESCRIPTION
RESULTS
VISUAL EXAMINATION OF COMPLETED WELD (QW-302.4) : ACCEPTABLE
VISUAL EXAMINATION REPORT NO AHT/QC/WQT/WV/2017/06
ALTERNATIVE VOLUMATRIC EXAMINATION RESULTS (QW-191): RT / UT : ACCEPTABLE [RT]
RADIOGRAPHIC TEST REPORT NO AHT/QC/WQT/2017/16
OTHER TESTS
FILM (OR) SPECIMENS EVALUATED BY: SUNIL KUMAR COMPANY: HITECH INSPECTION SERVICES
MECHANICAL TEST CONDUCTED BY: N/A LABORATORY TEST REPORT NO: N/A
WELDING SUPERVISED BY: Nidhin George Ipe
DATE OF WELD: 18.12.2017
WE CERTIFY THAT THE STATEMENTS IN THIS RECORD ARE CORRECT AND THAT TEST COUPONS WERE PREPARED , WELDED AND TESTED IN
ACCORDANCE WITH THE REQUIREMENTS OF ASMESEC IX ED 2015.
TEST DESCRIPTION
RESULTS
VISUAL EXAMINATION OF COMPLETED WELD (QW-302.4) : ACCEPTABLE
VISUAL EXAMINATION REPORT NO AHT/QC/WQT/WV/2017/02
ALTERNATIVE VOLUMATRIC EXAMINATION RESULTS (QW-191): RT / UT : ACCEPTABLE [RT]
RADIOGRAPHIC TEST REPORT NO AHT/QC/WQT/2017/09
OTHER TESTS
FILM (OR) SPECIMENS EVALUATED BY: SUNIL KUMAR COMPANY: HITECH INSPECTION SERVICES
MECHANICAL TEST CONDUCTED BY: N/A LABORATORY TEST REPORT NO: N/A
WELDING SUPERVISED BY: Nidhin George Ipe
DATE OF WELD: 11.09.2017
WE CERTIFY THAT THE STATEMENTS IN THIS RECORD ARE CORRECT AND THAT TEST COUPONS WERE PREPARED , WELDED AND TESTED IN
ACCORDANCE WITH THE REQUIREMENTS OF ASMESEC IX ED 2015.
TEST DESCRIPTION
RESULTS
VISUAL EXAMINATION OF COMPLETED WELD (QW-302.4) : ACCEPTABLE
VISUAL EXAMINATION REPORT NO AHT/QC/WQT/WV/2017/07
ALTERNATIVE VOLUMATRIC EXAMINATION RESULTS (QW-191): RT / UT : ACCEPTABLE [RT]
RADIOGRAPHIC TEST REPORT NO AHT/QC/WQT/2017/13
OTHER TESTS
FILM (OR) SPECIMENS EVALUATED BY: SUNIL KUMAR COMPANY: HITECH INSPECTION SERVICES
MECHANICAL TEST CONDUCTED BY: N/A LABORATORY TEST REPORT NO: N/A
WELDING SUPERVISED BY: Nidhin George Ipe
DATE OF WELD: 04.10.2017
WE CERTIFY THAT THE STATEMENTS IN THIS RECORD ARE CORRECT AND THAT TEST COUPONS WERE PREPARED , WELDED AND TESTED IN
ACCORDANCE WITH THE REQUIREMENTS OF ASMESEC IX ED 2015.
TEST DESCRIPTION
RESULTS
VISUAL EXAMINATION OF COMPLETED WELD (QW-302.4) : ACCEPTABLE
VISUAL EXAMINATION REPORT NO AHT/QC/WQT/WV/2017/02
ALTERNATIVE VOLUMATRIC EXAMINATION RESULTS (QW-191): RT / UT : ACCEPTABLE [RT]
RADIOGRAPHIC TEST REPORT NO AHT/QC/WQT/2017/09
OTHER TESTS
FILM (OR) SPECIMENS EVALUATED BY: SUNIL KUMAR COMPANY: HITECH INSPECTION SERVICES
MECHANICAL TEST CONDUCTED BY: N/A LABORATORY TEST REPORT NO: N/A
WELDING SUPERVISED BY: Nidhin George Ipe
DATE OF WELD: 11.09.2017
WE CERTIFY THAT THE STATEMENTS IN THIS RECORD ARE CORRECT AND THAT TEST COUPONS WERE PREPARED , WELDED AND TESTED IN
ACCORDANCE WITH THE REQUIREMENTS OF ASMESEC IX ED 2015.
TEST DESCRIPTION
RESULTS
VISUAL EXAMINATION OF COMPLETED WELD (QW-302.4) : ACCEPTABLE
VISUAL EXAMINATION REPORT NO AHT/QC/WQT/WV/2017/02
ALTERNATIVE VOLUMATRIC EXAMINATION RESULTS (QW-191): RT / UT : ACCEPTABLE [RT]
RADIOGRAPHIC TEST REPORT NO AHT/QC/WQT/2017/09
OTHER TESTS
FILM (OR) SPECIMENS EVALUATED BY: SUNIL KUMAR COMPANY: HITECH INSPECTION SERVICES
MECHANICAL TEST CONDUCTED BY: N/A LABORATORY TEST REPORT NO: N/A
WELDING SUPERVISED BY: Nidhin George Ipe
DATE OF WELD: 11.09.2017
WE CERTIFY THAT THE STATEMENTS IN THIS RECORD ARE CORRECT AND THAT TEST COUPONS WERE PREPARED , WELDED AND TESTED IN
ACCORDANCE WITH THE REQUIREMENTS OF ASMESEC IX ED 2015.
TEST DESCRIPTION
RESULTS
VISUAL EXAMINATION OF COMPLETED WELD (QW-302.4) : ACCEPTABLE
VISUAL EXAMINATION REPORT NO AHT/QC/WQT/WV/2017/02
ALTERNATIVE VOLUMATRIC EXAMINATION RESULTS (QW-191): RT / UT : ACCEPTABLE [RT]
RADIOGRAPHIC TEST REPORT NO AHT/QC/WQT/2017/09
OTHER TESTS
FILM (OR) SPECIMENS EVALUATED BY: SUNIL KUMAR COMPANY: HITECH INSPECTION SERVICES
MECHANICAL TEST CONDUCTED BY: N/A LABORATORY TEST REPORT NO: N/A
WELDING SUPERVISED BY: Nidhin George Ipe
DATE OF WELD: 11.09.2017
WE CERTIFY THAT THE STATEMENTS IN THIS RECORD ARE CORRECT AND THAT TEST COUPONS WERE PREPARED , WELDED AND TESTED IN
ACCORDANCE WITH THE REQUIREMENTS OF ASMESEC IX ED 2015.
TEST DESCRIPTION
RESULTS
VISUAL EXAMINATION OF COMPLETED WELD (QW-302.4) : ACCEPTABLE
VISUAL EXAMINATION REPORT NO AHT/QC/WQT/WV/2017/06
ALTERNATIVE VOLUMATRIC EXAMINATION RESULTS (QW-191): RT / UT : ACCEPTABLE [RT]
RADIOGRAPHIC TEST REPORT NO AHT/QC/WQT/2017/12
OTHER TESTS
FILM (OR) SPECIMENS EVALUATED BY: SUNIL KUMAR COMPANY: HITECH INSPECTION SERVICES
MECHANICAL TEST CONDUCTED BY: N/A LABORATORY TEST REPORT NO: N/A
WELDING SUPERVISED BY: Nidhin George Ipe
DATE OF WELD: 04.10.2017
WE CERTIFY THAT THE STATEMENTS IN THIS RECORD ARE CORRECT AND THAT TEST COUPONS WERE PREPARED , WELDED AND TESTED IN
ACCORDANCE WITH THE REQUIREMENTS OF ASMESEC IX ED 2015.
TEST DESCRIPTION
RESULTS
VISUAL EXAMINATION OF COMPLETED WELD (QW-302.4) : ACCEPTABLE
VISUAL EXAMINATION REPORT NO AHT/QC/WQT/WV/2017/02
ALTERNATIVE VOLUMATRIC EXAMINATION RESULTS (QW-191): RT / UT : ACCEPTABLE [RT]
RADIOGRAPHIC TEST REPORT NO AHT/QC/WQT/2017/09
OTHER TESTS
FILM (OR) SPECIMENS EVALUATED BY: SUNIL KUMAR COMPANY: HITECH INSPECTION SERVICES
MECHANICAL TEST CONDUCTED BY: N/A LABORATORY TEST REPORT NO: N/A
WELDING SUPERVISED BY: Nidhin George Ipe
DATE OF WELD: 11.09.2017
WE CERTIFY THAT THE STATEMENTS IN THIS RECORD ARE CORRECT AND THAT TEST COUPONS WERE PREPARED , WELDED AND TESTED IN
ACCORDANCE WITH THE REQUIREMENTS OF ASMESEC IX ED 2015.
TEST DESCRIPTION
RESULTS
VISUAL EXAMINATION OF COMPLETED WELD (QW-302.4) : ACCEPTABLE
VISUAL EXAMINATION REPORT NO AHT/QC/WQT/WV/2017/02
ALTERNATIVE VOLUMATRIC EXAMINATION RESULTS (QW-191): RT / UT : ACCEPTABLE [RT]
RADIOGRAPHIC TEST REPORT NO AHT/QC/WQT/2017/09
OTHER TESTS
FILM (OR) SPECIMENS EVALUATED BY: SUNIL KUMAR COMPANY: HITECH INSPECTION SERVICES
MECHANICAL TEST CONDUCTED BY: N/A LABORATORY TEST REPORT NO: N/A
WELDING SUPERVISED BY: Nidhin George Ipe
DATE OF WELD: 11.09.2017
WE CERTIFY THAT THE STATEMENTS IN THIS RECORD ARE CORRECT AND THAT TEST COUPONS WERE PREPARED , WELDED AND TESTED IN
ACCORDANCE WITH THE REQUIREMENTS OF ASMESEC IX ED 2015.
TEST DESCRIPTION
RESULTS
VISUAL EXAMINATION OF COMPLETED WELD (QW-302.4) : ACCEPTABLE
VISUAL EXAMINATION REPORT NO AHT/QC/WQT/WV/2017/06
ALTERNATIVE VOLUMATRIC EXAMINATION RESULTS (QW-191): RT / UT : ACCEPTABLE [RT]
RADIOGRAPHIC TEST REPORT NO AHT/QC/WQT/2017/12
OTHER TESTS
FILM (OR) SPECIMENS EVALUATED BY: SUNIL KUMAR COMPANY: HITECH INSPECTION SERVICES
MECHANICAL TEST CONDUCTED BY: N/A LABORATORY TEST REPORT NO: N/A
WELDING SUPERVISED BY: Nidhin George Ipe
DATE OF WELD: 04.10.2017
WE CERTIFY THAT THE STATEMENTS IN THIS RECORD ARE CORRECT AND THAT TEST COUPONS WERE PREPARED , WELDED AND TESTED IN
ACCORDANCE WITH THE REQUIREMENTS OF ASMESEC IX ED 2015.
TEST DESCRIPTION
RESULTS
VISUAL EXAMINATION OF COMPLETED WELD (QW-302.4) : ACCEPTABLE
VISUAL EXAMINATION REPORT NO AHT/QC/WQT/WV/2017/02
ALTERNATIVE VOLUMATRIC EXAMINATION RESULTS (QW-191): RT / UT : ACCEPTABLE [RT]
RADIOGRAPHIC TEST REPORT NO AHT/QC/WQT/2017/09
OTHER TESTS
FILM (OR) SPECIMENS EVALUATED BY: SUNIL KUMAR COMPANY: HITECH INSPECTION SERVICES
MECHANICAL TEST CONDUCTED BY: N/A LABORATORY TEST REPORT NO: N/A
WELDING SUPERVISED BY: Nidhin George Ipe
DATE OF WELD: 11.09.2017
WE CERTIFY THAT THE STATEMENTS IN THIS RECORD ARE CORRECT AND THAT TEST COUPONS WERE PREPARED , WELDED AND TESTED IN
ACCORDANCE WITH THE REQUIREMENTS OF ASMESEC IX ED 2015.
TEST DESCRIPTION
RESULTS
VISUAL EXAMINATION OF COMPLETED WELD (QW-302.4) : ACCEPTABLE
VISUAL EXAMINATION REPORT NO AHT/QC/WQT/WV/2017/07
ALTERNATIVE VOLUMATRIC EXAMINATION RESULTS (QW-191): RT / UT : ACCEPTABLE [RT]
RADIOGRAPHIC TEST REPORT NO AHT/QC/WQT/2017/13
OTHER TESTS
FILM (OR) SPECIMENS EVALUATED BY: SUNIL KUMAR COMPANY: HITECH INSPECTION SERVICES
MECHANICAL TEST CONDUCTED BY: N/A LABORATORY TEST REPORT NO: N/A
WELDING SUPERVISED BY: Nidhin George Ipe
DATE OF WELD: 04.10.2017
WE CERTIFY THAT THE STATEMENTS IN THIS RECORD ARE CORRECT AND THAT TEST COUPONS WERE PREPARED , WELDED AND TESTED IN
ACCORDANCE WITH THE REQUIREMENTS OF ASMESEC IX ED 2015.
TEST DESCRIPTION
RESULTS
VISUAL EXAMINATION OF COMPLETED WELD (QW-302.4) : ACCEPTABLE
VISUAL EXAMINATION REPORT NO AHT/QC/WQT/WV/2017/02
ALTERNATIVE VOLUMATRIC EXAMINATION RESULTS (QW-191): RT / UT : ACCEPTABLE [RT]
RADIOGRAPHIC TEST REPORT NO AHT/QC/WQT/2017/09
OTHER TESTS
FILM (OR) SPECIMENS EVALUATED BY: SUNIL KUMAR COMPANY: HITECH INSPECTION SERVICES
MECHANICAL TEST CONDUCTED BY: N/A LABORATORY TEST REPORT NO: N/A
WELDING SUPERVISED BY: Nidhin George Ipe
DATE OF WELD: 11.09.2017
WE CERTIFY THAT THE STATEMENTS IN THIS RECORD ARE CORRECT AND THAT TEST COUPONS WERE PREPARED , WELDED AND TESTED IN
ACCORDANCE WITH THE REQUIREMENTS OF ASMESEC IX ED 2015.
TEST DESCRIPTION
RESULTS
VISUAL EXAMINATION OF COMPLETED WELD (QW-302.4) : ACCEPTABLE
VISUAL EXAMINATION REPORT NO AHT/QC/WQT/WV/2017/06
ALTERNATIVE VOLUMATRIC EXAMINATION RESULTS (QW-191): RT / UT : ACCEPTABLE [RT]
RADIOGRAPHIC TEST REPORT NO AHT/QC/WQT/2017/12
OTHER TESTS
FILM (OR) SPECIMENS EVALUATED BY: SUNIL KUMAR COMPANY: HITECH INSPECTION SERVICES
MECHANICAL TEST CONDUCTED BY: N/A LABORATORY TEST REPORT NO: N/A
WELDING SUPERVISED BY: Nidhin George Ipe
DATE OF WELD: 04.10.2017
WE CERTIFY THAT THE STATEMENTS IN THIS RECORD ARE CORRECT AND THAT TEST COUPONS WERE PREPARED , WELDED AND TESTED IN
ACCORDANCE WITH THE REQUIREMENTS OF ASMESEC IX ED 2015.
TEST DESCRIPTION
RESULTS
VISUAL EXAMINATION OF COMPLETED WELD (QW-302.4) : ACCEPTABLE
VISUAL EXAMINATION REPORT NO AHT/QC/WQT/WV/2017/02
ALTERNATIVE VOLUMATRIC EXAMINATION RESULTS (QW-191): RT / UT : ACCEPTABLE [RT]
RADIOGRAPHIC TEST REPORT NO AHT/QC/WQT/2017/09
OTHER TESTS
FILM (OR) SPECIMENS EVALUATED BY: SUNIL KUMAR COMPANY: HITECH INSPECTION SERVICES
MECHANICAL TEST CONDUCTED BY: N/A LABORATORY TEST REPORT NO: N/A
WELDING SUPERVISED BY: Nidhin George Ipe
DATE OF WELD: 11.09.2017
WE CERTIFY THAT THE STATEMENTS IN THIS RECORD ARE CORRECT AND THAT TEST COUPONS WERE PREPARED , WELDED AND TESTED IN
ACCORDANCE WITH THE REQUIREMENTS OF ASMESEC IX ED 2015.
TEST DESCRIPTION
RESULTS
VISUAL EXAMINATION OF COMPLETED WELD (QW-302.4) : ACCEPTABLE
VISUAL EXAMINATION REPORT NO AHT/QC/WQT/WV/2017/02
ALTERNATIVE VOLUMATRIC EXAMINATION RESULTS (QW-191): RT / UT : ACCEPTABLE [RT]
RADIOGRAPHIC TEST REPORT NO AHT/QC/WQT/2017/07
OTHER TESTS
FILM (OR) SPECIMENS EVALUATED BY: COMPANY: HITECH INSPECTION SERVICES
MECHANICAL TEST CONDUCTED BY: N/A LABORATORY TEST REPORT NO: N/A
WELDING SUPERVISED BY: Nidhin George Ipe
DATE OF WELD: 02.08.2017
WE CERTIFY THAT THE STATEMENTS IN THIS RECORD ARE CORRECT AND THAT TEST COUPONS WERE PREPARED , WELDED AND TESTED IN ACCORDANCE
WITH THE REQUIREMENTS OF ASMESEC IX ED 2015.
TEST DESCRIPTION
RESULTS
VISUAL EXAMINATION OF COMPLETED WELD (QW-302.4) : ACCEPTABLE
VISUAL EXAMINATION REPORT NO AHT/QC/WQT/WV/2017/02
ALTERNATIVE VOLUMATRIC EXAMINATION RESULTS (QW-191): RT / UT : ACCEPTABLE [RT]
RADIOGRAPHIC TEST REPORT NO AHT/QC/WQT/2017/07
OTHER TESTS
FILM (OR) SPECIMENS EVALUATED BY: COMPANY: HITECH INSPECTION SERVICES
MECHANICAL TEST CONDUCTED BY: N/A LABORATORY TEST REPORT NO: N/A
WELDING SUPERVISED BY: Nidhin George Ipe
DATE OF WELD: 02.08.2017
WE CERTIFY THAT THE STATEMENTS IN THIS RECORD ARE CORRECT AND THAT TEST COUPONS WERE PREPARED , WELDED AND TESTED IN ACCORDANCE
WITH THE REQUIREMENTS OF ASMESEC IX ED 2015.
TEST DESCRIPTION
RESULTS
VISUAL EXAMINATION OF COMPLETED WELD (QW-302.4) : ACCEPTABLE
VISUAL EXAMINATION REPORT NO AHT/QC/WQT/WV/2017/02
ALTERNATIVE VOLUMATRIC EXAMINATION RESULTS (QW-191): RT / UT : ACCEPTABLE [RT]
RADIOGRAPHIC TEST REPORT NO AHT/QC/WQT/2017/07
OTHER TESTS
FILM (OR) SPECIMENS EVALUATED BY: COMPANY: HITECH INSPECTION SERVICES
MECHANICAL TEST CONDUCTED BY: N/A LABORATORY TEST REPORT NO: N/A
WELDING SUPERVISED BY: Nidhin George Ipe
DATE OF WELD: 02.08.2017
WE CERTIFY THAT THE STATEMENTS IN THIS RECORD ARE CORRECT AND THAT TEST COUPONS WERE PREPARED , WELDED AND TESTED IN ACCORDANCE
WITH THE REQUIREMENTS OF ASMESEC IX ED 2015.
TEST DESCRIPTION
RESULTS
VISUAL EXAMINATION OF COMPLETED WELD (QW-302.4) : ACCEPTABLE
VISUAL EXAMINATION REPORT NO AHT/QC/WQT/WV/2017/02
ALTERNATIVE VOLUMATRIC EXAMINATION RESULTS (QW-191): RT / UT : ACCEPTABLE [RT]
RADIOGRAPHIC TEST REPORT NO AHT/QC/WQT/2017/07
OTHER TESTS
FILM (OR) SPECIMENS EVALUATED BY: COMPANY: HITECH INSPECTION SERVICES
MECHANICAL TEST CONDUCTED BY: N/A LABORATORY TEST REPORT NO: N/A
WELDING SUPERVISED BY: Nidhin George Ipe
DATE OF WELD: 02.08.2017
WE CERTIFY THAT THE STATEMENTS IN THIS RECORD ARE CORRECT AND THAT TEST COUPONS WERE PREPARED , WELDED AND TESTED IN ACCORDANCE
WITH THE REQUIREMENTS OF ASMESEC IX ED 2015.
In relation with the initiatives for maximizing the industry’s contribution to social and economic development
in the Sultanate of Oman, We, Al Hajiry Mechanical Engineering LLC are in full support to the ICV’s growth.
Hence below products in line with Oman ICV.
SINGLE SKIN LINER SHEET Fabricated in Al Hajiry Samail Workshop Made in Oman
4F-0284 Q1-3308
www.alhajiry.com
List of Omani Employees