Dokumen No.

Date :
Inspection and
Test Plan For
UPS & Battery REV.
Charger
Repot No. : Page.
of

Project: Pangulir Gold Development Project Owner: PT. Sumbawa Juta Raya Project no.

LOCATION / AREA : ……………………………. REF. SPEC / DWG. NO: ……………………………………

NO QUALITY CONTROL TASK SPEC FUNCTION DATE RESULTS


YES NO
1 Visual Check
2 Check charging board component marking
3 check connections for conformance to reference
drawings and tightness
4 Bolting Connections
5 Termination and Wiring number
6 Grounding connection
7 Battery rack installation
8 Electrolyte
9 battery charger panel testing before energizing
10 Initial record of Battery
11 Initial Charge record of Battery
12 Initial Discharge record of Battery
13 Charge test and Discharge test using actual load
for Battery
14 Performance Test for Battery Charger
15 Sequence and Alarm Test for Battery Charger
16 Insulation Resistance Measurement for Battery
Charger
17 Performance Test for Inverter
18 Sequence and Alarm Test for Inverter
19 Insulation Resistance Measurement for Inverter
20
21
22
23

COMPLETE INSPECTIONS AND TEST PLAN (ITP) FOR UPS & BATTERY CHARGER

TEST INSTRUMENT COMMENT


Type
Range
Voltage
Serial No.
Manufacture
Calibration

Prepare by. Approved By

PT. CITEC ENGINEERING INDONESIA PMC SJR


Name Saipul Anwar
Dokumen No. Date :
Inspection and
Test Plan For
UPS & Battery REV.
Charger
Repot No. : Page.
of

Project: Pangulir Gold Development Project Owner: PT. Sumbawa Juta Raya Project no.