Hydrostatic Test Report

Project Name: LTOM Package #5 MANFOUHA QR NO

Client: National Water Company Test Proceduer LTOM#5-QC-PvTP-001

Contractor: Alkhorayef Water and Power Technologies Report No.:

Area: Date

ITEM Location

Design Pressure Test pressure

Test Proceduer
Time Temperatuer Pressure Visual Test Remark

FINAL RESULT:

QA /QC Engineer QA/QC Manager NWC Representative

Name Ibrahim Hegazy Eng. Omar Shawkat

Signature