Professional Documents
Culture Documents
MANUAL
CD2010240
CSC-200 NUMERICAL PROTECTION
MANUAL
CD2010240
Version: V1.00
WARNING
1) During operation of electrical equipment, certain parts of this equipment are
under high voltage. Severe personal injury or significant equipment damage
could result from improper behavior.
2) Only qualified personnel should work on this equipment or in vicinity of the
equipment. These persons must be familiar with warning & service procedure
described in this manual, as well as with safety regulations.
3) Prerequisites to proper & safety operation of the equipment are proper
storage, setup, installation, operation & maintenance of the equipment.
4) In particularly cases, the general rules & safety regulations according to
relating standards (e.g. IEC, National standards or other International
standards) for work with high voltage equipment must be observed.
COPYRIGHT
All rights reserved.
Registered trademark
® are registered trademark of Beijing Sifang Automation Co., Ltd.
CONTENTS
Part I Technical Instruction of IED ........................................................................................................ 1
1. General ........................................................................................................................................... 1
1.1. Application....................................................................................................................................... 1
1.2. Main features ................................................................................................................................... 1
2. Technical Conditions .................................................................................................................... 2
3. Hardware ........................................................................................................................................ 4
3.1 Structure ........................................................................................................................................... 4
3.2 Overview of function module .......................................................................................................... 4
3.3 AC module (AC) .............................................................................................................................. 5
3.4 CPU module (CPU) ......................................................................................................................... 5
3.5 Logic module (LOG) ....................................................................................................................... 5
3.6 Digital output module (DO) ............................................................................................................. 6
3.7 AO module (AO) ............................................................................................................................. 6
3.8 Human-machine interface (HMI)..................................................................................................... 6
3.9 Power supply module (POW) .......................................................................................................... 6
4. Measurement and control function ............................................................................................. 6
4.1 Measurement meter .......................................................................................................................... 6
4.2 Breaker control ................................................................................................................................ 7
4.3 Operation mode control ................................................................................................................... 7
4.4 Programmable logic control ............................................................................................................. 7
4.5 Accident recording and analysis ...................................................................................................... 7
4.6 Communication ................................................................................................................................ 9
4.7 Diagnose function ............................................................................................................................ 9
4.8 EPPC® debugging and analysis software ....................................................................................... 10
5 CSC-241G Digital Plant (Station) Transformer Protection Measurement Control IED .... 11
5.1 Introduction of the device .............................................................................................................. 11
5.2 Protecting element ......................................................................................................................... 12
5.3 Setting value and setting instruction .............................................................................................. 21
5.4 IED terminal diagram .................................................................................................................... 24
Part II User Installation and Operation .................................................................................................... 25
6. Box opening check ..................................................................................................................... 25
7. Installation and debugging......................................................................................................... 25
7.1. Installation ..................................................................................................................................... 25
7.2. Check before power on .................................................................................................................. 25
7.3. Insulation resistance measurement................................................................................................. 25
7.4. Check of equipment power on ....................................................................................................... 25
7.5. Check of sampling precision .......................................................................................................... 26
7.6. Digital input and digital output check ............................................................................................ 26
7.7. Trip and close current keeping test ................................................................................................ 26
7.8. In-station communication test ........................................................................................................ 27
7.9. Protection function test .................................................................................................................. 27
7.10. Phase sequence check .................................................................................................................... 27
I
8. Man machine interface and its operation ................................................................................. 27
8.1. Front layout of equipment .............................................................................................................. 27
8.2. Display under normal operation ..................................................................................................... 29
8.3. Equipmentmenu ............................................................................................................................. 29
8.4. Description of menu function ......................................................................................................... 30
9. Operation and maintenance ...................................................................................................... 33
9.1. Equipment operation ...................................................................................................................... 34
9.2. Equipment operation ...................................................................................................................... 34
9.3. Notices in operation ....................................................................................................................... 34
9.4. Equipment maintenance ................................................................................................................. 34
9.5. Operation environment ................................................................................................................... 35
10. Transport and storage ................................................................................................................ 35
II
CSC-200 numerical protection measurement control equipment Manual
1. General
CSC-200 numerical protection measurement
control IED is applicable to the power system
below110kV power grid and power plant, which
is equipped with complete protection,
measurement, control and monitoring function,
provides complete solution for the protection and
control of the power system of the distribution
network and power plant, and can powerfully
guarantee the security and stability of operation
in distribution network and power plant.
1.1. Application
This instruction includes the type of CSC-200 IEDs and their applications, as shown in the table 1-1.
a) Embedded 32-bit microprocessor and high capability data collection system, with powerful
capability for data processing.
b) Flexible protection and control logic and programmable function, graphic editing of the
protection and control scheme, meet the personalized requirement.
1
CSC-200 numerical protection measurement control equipment Manual
scheme for the user.
e) Completely records of operation information and fault information, provide enough data for
operation optimization and fault analysis.
f) High-precision measurement meter system independent of the CPU system, meet the
requirement for operation monitoring and remote automatic meter reading.
g) Perfect software and hardware self-check function, adjustment-free circuit design, easy to
install and commissioning.
i) Network time synchronization, GPS impulse time synchronization, IRIG-B code time
synchronization, equipped with hardware clock system.
j) PC-based auxiliary analysis software, perform the protection and control logic customization,
fault analysis and virtual test easily.
l) Can be centrally grouped as screen, or be installed on the switch cabinet indoors or outdoors.
2. Technical Conditions
DC voltage: 220V/110V
phase voltage: 100V
Rated inputs Open-delta voltage:300V
AC current: 1A/5A
Frequency: 50Hz
Current: ≤ 3%
Accuracy Voltage: ≤ 5%
Direction: ≤ ±2
o
DC circuit: ≤ 35W
Power
AC current: phase ≤ 1VA (In=5A) or ≤ 0.5VA (In=1A)
consumption
3
CSC-200 numerical protection measurement control equipment Manual
3. Hardware
3.1 Structure
According to IEC60297-3 standard, the case size is 4U high and 19 width. It adopts whole built-in
2
mode and is wired in the rear. The dimension of the installation is shown as the figure 3-1.
4
CSC-200 numerical protection measurement control equipment Manual
AC module consists of the voltage convertor and current convertor, which convert the secondary current
and voltage of CT or VT into the signals processed by the data collection system and have an effect of
electric isolation. Different IED are equipped with different current and voltage converters.
It is the core module of IED, including CPU system, analog sampling system, binary input/output system,
real time hardware-clock system and high-speed communication system. The multi-layer printed circuit
and surface mount technology are used, including multiple anti-disturbance methods.
The logic module provides the protection tripping and closing control, remote tripping and closing control,
tripping/alarming signal output, and has an effect of electric isolation. Wherein, to avoid maloperation
caused by component damage, all important output can be executed after the startup relay is released.
5
CSC-200 numerical protection measurement control equipment Manual
The trip module provides the functions such as the breaker position monitoring, manual trip and close,
trip and close keeping and trip prevention. The keeping current of the trip and close is self-adapted within
0.5 ~ 4A, so the electric parameters of the loop can not be changed. The trip and close operation loop of
The HMI module exchanges data with CPU module by internal communication and provides the local
operation interface of the IED for the users, including LCD, LED, operation key and RS232 debugging
port.
The power supply module uses the inverse change principle to convert the 220V/110V input into the
required four groups of DC voltage, all of them do not have a common ground, and the floating mode is
used to separate the electricity. To improve the anti-interference performance of the power loop, the
anti-interference filtering component is installed in the DC input and 24V output power loop. The module
is equipped with the complete power supply protection function (undervoltage, overvoltage, overcurrent
and overpower) to avoid equipment damage caused by power fault. The power module provides the
6
CSC-200 numerical protection measurement control equipment Manual
internal memory when the IED powers on again.
b) Voltage Ua,Ub,Uc
e) Forward (or reverse) active power and forward (reverse) reactive power
The remote control is allowed when receiving “remote/local” binary input high level, the remote control is
blocked with low level, the local operation function is not affected by this binary input, remote or local
with high level can be selected by binary setting in inner parameter.
The IED provides 32-group setting management function, which will not be lost when power
disconnection and can meet the operation mode change in most cases.
Logical enabling or disabling the main protection element is provided. The user can enable or disable the
protection elements via the communication interface or operation interface to meet the operation
requirement and the linker status will not be lost when power disconnectio.
The efficient engineering configuration software provides the programmable control logic, which can be
used by the user to customize various protection and control function, binary input, binary output, LED
indicator, then trigger condition and length of the wave recording report to make the IED meet the user’s
requirement .
The IED can monitor and record the operation status, related secondary loop and operation state
real-time, including fault record, wave record, sequence of event record and operation record. The time
mark information for the recording comes from the clock system of the IED, and the time resolving power
is up to 1ms. The clock system supports the network time synchronization, precise GPS pulse time
synchronization and IRIG-B code time synchronization, distinguishes second pulse from minute pulse.
7
CSC-200 numerical protection measurement control equipment Manual
After the IED power disconnection, the internal lithium battery will supply operation power.
EPPC tool software is used to call the recording wave, the operation procedures are as follows: under
the debugging mode, to click main menu\accident record\record duplication, select the accident record
SN to read in the record duplication dialog, click “copy” to copy the records to the debugging window,
right click this record, and pop up the shortcut menu, to click “wave recording data”, the recording wave
figure is called.
8
CSC-200 numerical protection measurement control equipment Manual
4.6 Communication
The IED is equipped with a RS232 debugging port on the front panel to connect PC. The PC can set
parameters, test functions, download software and analyze data via the EPPC. The signal definitions of
the debugging port are shown as the figure 4-2.
DB9/M DB9
Pin Signal Pin Signal
2 RXD 2 RXD
3 TXD 3 TXD
5 GND 5 GND
Debugging port of
equipment PC RS232
To meet the networking requirement of the automated system, the IED provides the following
communication ports for the user to be selected, refer to IED wiring figure for Ethernet interface and 485
interface.
e) Two-channel DP interface
The IED supports IEC60870-5-103, profibus and CSC-2000 communication protocol. It can transmit real
time operation information (such as measurement data, CB position and event records) to the station
monitoring or SCADA system with the communication port and corresponding communication protocol.
The station-level devices can distribute the control command to the IED or remotely manage the
protection information via the communication interface.
The user can check the important hardware circuit via the test command provided by the IED, such as
AC loop, binary input loop and binary output loop.
To cooperate the implementation of the automated system project, the IED provides the remote point
testing function to quickly verify the information library of local monitoring and remote main station, which
9
CSC-200 numerical protection measurement control equipment Manual
makes the monitoring and remote communication personnel free of trivial manual point testing operation,
including tele-signalling point synchronization, tele-metering point synchronization, alarm event point
synchronization and operation event point synchronization. To check the communication status of the
IED and find the possible communication bug of the IED and its located network, the operation statistics
information of related communication ports is provided as the network diagnosis data.
EPPC debugging analysis software package will be issued together with the IED, it runs under Windows
98/2000/NT/XP environment, is easy for installation and using. The hardware test, protection
configuration and monitoring and control of the IED can be easily performed by using RS232 debugging
port of the front panel and PC advantage resource.
b) Linker setting, setting zone switching, time setting, and signal reset
f) Quickly update and upgrade support of configuration scheme and protection software
g) Monitoring and testing of IED AC loop, binary input and digital output loop
10
CSC-200 numerical protection measurement control equipment Manual
This equipment is applied to protection and measurement control of plant (station) transformer, and can
be installed to the switch cabinet in field.
Overcurrent protection
Earth fault protection, with definite time stage or inverse time stage
BIs→BOs protection
Telemetering of analog quality, such as Ua, Ub, Uc, Ia, Ib, Ic, P, Q, cosϕ, etc.
Fault recorder
4-20mA output
11
CSC-200 numerical protection measurement control equipment Manual
IQd is fixed threshold (equal to 0.2/e), iφ (t) is instantaneous value of phase current, T is sampling period.
Instruction: /e in this manual refers to rated secondary current of transformer high-voltage side, the same
below.
When any phase differential current is large than the setting value of instantaneous differential protection,
instantaneous differential protection instantaneously operates, and trips the CB of each side, the
operation criterion is: Id > Isd
12
CSC-200 numerical protection measurement control equipment Manual
5.2.2.2. Percentage differential protection
Differential loop may have the unbalance current, owning to the difference of CT performance and
transformation ratio of the transformer at each side, as well as the difference of winding connection at
each side. The characteristic of treble slope percent differential protection is used to prevent
maloperation frommaximum unbalanced current of external fault, and ensures the sensitivity of internal
fault clearing, the operating equation is shown below, as for the characteristic curve please refer to figure
1.
Wherein Ie is rated current for transformer, I1 and I2 is respectively the high-voltage side current and
low-voltage side current of the transformer, Icd is the setting value of stable percentage differential startup,
Id is differential current, Ir is restraint current, and k is setting value of percentage restraint coefficient (0.2
≤ k ≤ 0.7), the recommended setting value is k = 0.5.
It is discriminated in the program by phase, when any of the phases satisfies the conditions above, the
percentage differential operation operate. Percentage differential protection operate after the
discrimination of inrush current and CT secondary circuit supervision (optional).
13
CSC-200 numerical protection measurement control equipment Manual
5.2.2.3. The principle of inrush restraint
The ratio of secondary harmonic and fundamental wave of three-phase differential current is adopted as
the criterion of inrush restraint :
Wherein dφ 2 I is the secondary harmonic component of differential current, xb.2 K is the restraint
coefficient of secondary harmonic, Idφis the fundamental wave component of differential current.
The “or” gate is adopted for blocking, which means the inrush current of a certain phase in three-phase
differential current is discriminated , to percentage differential protection will be blocked.
The setting value of current and time of overcurrent protection can be set independently. The startup
condition is:
IOC/OC
Tn
IΦ>Idzn TRIP
14
CSC-200 numerical protection measurement control equipment Manual
Logical linker is used for enabling or disabling overload function.
Ttz
KG1.0=1 Trip
Overload
MAX(IΦ)>Ifh
Tgj
or Alarm
KG1.0=0
Note: Considering that the overloading time is usually long delay, the protection output time delay is
setting time without being reflected in the message.
c) CB closing
Acc
HWJ Trip
10s
TWJ
3s
High-voltage side zero-sequence current protection usually adopts the definite time stage, when
KG2.0=0, zero-sequence current at low-voltage side operates with tripping, when KG2.0=1,
15
CSC-200 numerical protection measurement control equipment Manual
zero-sequence current at low-voltage side issues the alarming signals. And the operating condition is as
follows:
Trip
EF
Alarm
Figure 5-5 Logic Diagram of Definite Time Stage of Zero-sequence Current Protection
Zero-sequence current protection at low-voltage side can be selected as definite time stage or inverse
time stage with binary setting, when KG2.1=0, zero-sequence current at low-voltage side operates with
tripping, when KG2.1=1, zero-sequence current at low-voltage side issues alarming signals. The
operating conditions of definite time stage are as follows:
a) 3I0d>Id0dz; Id0dz is the setting value of low-voltage zero-sequence current, 3I0d is the
zero-sequence current of low-voltage side.
Neutral point or zero-sequence current of low-voltage side can adopt the inverse time stage to cooperate
with the time characteristic of fusing time, the characteristic curve is:
Wherein IeL is the rated current of transformer of low-voltage side, has to be converted by the
transformation ratio of natural point CT when calculating the secondary value ; I0L is the present
zero-sequence current; IRE is the reference value to avoid the maximum unbalanced current of
low-voltage side under normal operation condition, usually adopts 0.25 times the low-voltage side rated
current; τis the time factor of low-voltage zero-sequence current that cooperate with the fuse.
a) Original voltage;
b) The three line voltages are all lower than the setting value of Under-voltage.
c) Current existence;
UV
Trip
VT fail
Original
voltage
Any UL>Udz
Note: Original voltage means that bus bar voltage used to be large than the setting value of low-voltage
for more than 2 seconds, namely low-voltage elements need to go through a sudden-change of bus bar
voltage from high to low in order to operate.
The Non-elec protection signal LED on the IED panel is named Non-elec1, Non-elec2, Non-elec3 and
Non-elec4, the specific meaning of each Non-elec is determined by the terminal wiring. Generally,
Non-elec1 is default as heavy gas input terminal, Non-elec2 is default as light gas input terminal, and
Non-elec3 is default as voltage-regulating heavy gas input terminal, Non-elec4 is voltage-regulating light
gas input terminal or over temperature input terminal.
Non-elec protection is enabled or disabled by logical linker, when the liner is disabled, these DIs are
used as tele-signalling .
Non-elec n
DI n KG alarm Alarming
KG tripping Tripping
17
CSC-200 numerical protection measurement control equipment Manual
2) One or two phase of the three phase current on the side have no current, and the three phase current
on the opposite side doesn’t change.
When the conditions above are satisfied, it is discriminated as CT secondary circuit failure.
After the secondary circuit failure of CT, the alarming signal is issued, and the differential protection
operation can be selected to be blocked or unblocked.
If Iclyx < 0.3Icd, using 0.3Icd, otherwise using the actual setting value.
FC blocking overcurrent function is enabled or disabled by binary setting, while the function enabled,
external fuse contact will be connected to BI6 (8X6) of the IED, and the IED will send alarming signal
when BI6 receive high level; when FC blocking current function is enabled, BI6 can be selected to trip or
not by binary setting; when the function is disabled, BI6 can only work as an tele-signalling.
Fuse tripping
Fuse alarming
Outtput blocking
18
CSC-200 numerical protection measurement control equipment Manual
Figure 5-9 F-C logic diagram of F-Covercurrent blocking function
Linker:
Binary setting:
Setting value:
a) If the three phase voltage are all lower than 8V and the sum of three phase voltage is lower than 8V,
meanwhile, a phase (a or c phase) has current, then it is considered as three-phase voltage loss.
b) If the sum of three phase voltage is greater than 8V, the minimum line voltage is lower than 16V, it will
be considered as two phase VT failure.
c) If the sum of three phase voltage is greater than 8V, and the difference of maximum line voltage and
minimum line voltage is greater than 16V, it is considered as single phase VT failure.
VT circuit monitoring function is enabled or disabled by the self-supervision binary setting of analog
quantity.
19
CSC-200 numerical protection measurement control equipment Manual
1) The 20mA interface is enabled through the Factory setting and module setting of the menu;
2) Setting the 4.5mA point and 19mA point through the Factory setting -> 20mA adjusting of the menu,
and adjust the linearity.
3) If the interface selects current measurement quality, based on the transformation ratio of CT, if 1A is
selected for CT, measuring current 1.2A is corresponding to 20mA output; when CT select 5A,
measuring current 6A is corresponding to 20mAoutputs .
4) If the interface selects voltage measurement quality, measuring voltage 120V is corresponding to
20mA output.
20
CSC-200 numerical protection measurement control equipment Manual
21
CSC-200 numerical protection measurement control equipment Manual
21 LV EF I......... (0.04~20)In A
22 LV EF T......... 0.00~32.00 s
23 EF INV I........ (0.05~10)In
24 ACC I........... (0.05~20)In A
25 ACC T........... 0.00~03.00 s
26 UV V............ 00~100 V Line voltage
27 UV T............ 0.10~32.00 s
28 NS I............ (0.05~20)In A
29 NS DEF T........ 0.10~32.00 s
30 Non-elec 1 T.... 0.00~32.00 s
31 Non-elec 2 T.... 0.00~32.00 s
32 Non-elec 3 T.... 0.00~32.00 s
33 Non-elec 4 T.... 0.00~32.00 s
34 I_F-C Blk....... (0.05~20)In A (1~20)Ie
VT,CT transformation ratio is measuring ratio, setting method: if primary CT ratio is 600/5=120, it is set
as 120/1000=0.12; if VT ratio for 10kv is 10000/100=100, it will be set for 100/1000=0.10. (Set by
internal binary setting).
0
1 Transformer connection
2
3 2ndHarm Res Dis 2ndHarm Res En
4 DIFF Alarm Dis DIFF Alarm En
5 CT Check Dis CT Check En
6 CT Fail Rel Prot CT Fail Blk Prot
7 VT Check Dis VT Check En
8 CC Broken Dis CC Broken En
9 3U0 Alarm Dis 3U0 Alarm En
10 Overload Alarm Overload Trip
11 NS OC Dis NS OC En
12 LV EF Def LV EF Inv
13 LV EF CT 5A LV EF CT 1A
14 HV EF CT 5A HV EF CT 1A
15 CT Rated 5A CT Rated 1A
22
CSC-200 numerical protection measurement control equipment Manual
0 HV EF Trip HV EF Alarm
1 LV EF Trip LV EF Alarm
2 Non-elec 1 Alarm Non-elec 1 Trip
3 Non-elec 2 Alarm Non-elec 2 Trip
4 Non-elec 3 Alarm Non-elec 3 Trip
5 Non-elec 4 Alarm Non-elec 4 Trip
6 8X6 No-trip 8X6 Trip
7 F-C OC Blk Dis F-C OC Blk En
8 Incoming Blk Dis Incoming Blk En
9~15 Spare Spare
0 0 0 No Ph-corr Test
0 0 1 Y/△-11
0 1 0 Y/△-1
0 1 1 △/Y-1
1 0 0 △/Y-11
0 0 1 Y/Y-12
1 1 0 Null
1 1 1 Null
c) All the list provided above are setting under standard configuration, and the content may not
accordance with the actual shown list, the actual shown list is used as the standard reference.
23
POWER TRIP LOGIC CPU AO AC2 AC2 AC1
8X 7X 6X 5X 4X 3X 2X 1X
1 DI1 1 +KM 1 Common 1 Rem/Loc 1 AO1 1 Ua 1 Ia1 1 I0L
6SF.004.297
2 DI2 2 Manual trip(in) 2 Trip1 2 Backup 2 AO1' 2 Ub 2 Ia1' 2 I0L'
3 DI3 3 Relay trip(in) 3 3 Overhaul 3 AO2 3 Uc 3 Ib1 3 Ia2
4 DI4 4 To trip coil 4 Common 4 Backup 4 AO2' 4 Un 4 Ib1' 4 Ia2'
5 DI5 5 To close coil 5 5 -24V 5 AO3 5 U0 5 Ic1 5 Ib2
6 DI6 6 Short to X7-5 6 Trip2 6 Backup/P 6 AO3' 6 U0' 6 Ic1' 6 Ib2'
7 DI7 7 Close(in) 7 Common 7 Backup/Q 7 I0H 7 Ic2
8 DI8(TWJ) 8 8 Remote trip 8 COM- 8 I0H' 8 Ic2'
-KM
9 DI9(HWJ) 9 Common 9 Remote close 9 SYNA+ 9 Mea Ia 9
10 DI (-) 10 TWJ 10 Common 10 SYNA- 10 Mes Ia' 10
11 +24V 11 HWJ 11 Operation 11 RS485A 11 Mea Ic 11 Mea Ib
12 -24V 12 12 Alarm 12 RS485B 12 Mea Ic' 12 Mea Ib'
5.4 IED terminal diagram
13 13
CC broken
DC 13
Backup1
14 Failure 14 14
TWJ 1RJ45
15 Not used 15 15
Backup2
16 DC(+) 16 Short to X7-4 16 CPU
17 Not used 17 17 5X
Backup3
18 DC(-) 18 18 1 Rem/Loc
CSC-200 numerical protection measurement control equipment
2RJ45
19 Not used 19 19 2 Overhaul
Backup4
24
20 GND 20 20 3 Backup
4 -24V
5 SYNA+
11 RS485A 11 RS485A 11 RS485A 11 RS485A
6 SYNA-
12 RS485B 12 RS485B 12 RS485B 12 RS485B
13 Lon-A 13 Resistance
14 Lon-B 14 RS485A
15 Not used 15 RS485B
16 Not used 16 Resistance
6SF.004.297
NOTE:The part in the broken line is optional.
Manual
Note: Plug-in is available to those dashed frame, and when DP is chosen for protocol, CPU uses
CSC-200 numerical protection measurement control equipment Manual
7.1. Installation
a) The equipment should be solidly fixed on the screen (cabinet) and all connection screws of the
equipment should be fixed.
b) The equipment ground and screen (cabinet) ground are reliably grounded with the system
ground and bus bar.
c) The wiring of the equipment should meet the requirement in the wiring drawing.
a) Plug all modules and check whether the mechanical parts and components of the modules are
loose, fall off, or mechanically damaged. Whether the wiring is solid.
b) Check whether the connectors of all modules are inserted in place and lock is reliable.
c) Check whether the man-machine interface (MMI) and panel are connected reliably.
Before you make an insulation check, you should guarantee that the equipment terminal has no electric
connection with the onsite secondary loop. Respectively short-connect the AC voltage loop, AC current
loop, DC power loop, switch/signal input loop, switch/signal output loop, use 500V meter to measure
insulation resistance of all loops to ground or to each other, which is required to be higher than 100MΩ.
After the equipment powers on, the steps are followed to check whether the equipment is normal.
25
CSC-200 numerical protection measurement control equipment Manual
a) LCD displays a normal image and no alarm information.
d) Check that the software information and configuration information of the equipment should be
consistent with the equipment type.
e) Check that the calendar clock of the equipment should be accurate and whether calibration is
required.
f) Enter the settings to the corresponding zone according to the setting list and switch the running
setting zone to the required one.
g) To set various protection functions via the link, the equipment should display no exceptional
information.
h) Check whether the modules of the factory menu are consistent with detailed engineering
technical requirements. For inconsistent contents, know the user requirement and make correct
setup.
The sampling precision of this equipment require no adjustment and the sampling error should not be
higher than 2%. Generally, the protection tester is used for qualitative calibration. For strict requirement,
the phase current input terminals of the equipment can be serial connected with 5A/1A current. The
phase PT is parallel connected with 50V voltage. The equipment should accurately display the input, the
value of all phase should be consistent, the phase of the analog channels should be correct.
Digital input loop calibration can be made via the digital input test commands on the operation interface
of the equipment.
Digital output loop calibration can be made via the digital output test commands on the operation
interface of the equipment, or made together with the setting calibration. Each channel of contact output
is checked for one time, for other tests, the signal indicators and LCD are observed. The close and trip
should be tested with breaker to validate that the breaker can correctly act.
Simulate a fault to make the protection act and trip, validate that the close and trip current keeps a
normal status. The manual close and open operation is made to validate the integrity of this loop..
26
CSC-200 numerical protection measurement control equipment Manual
If the equipment is connected to the local monitoring or SCADA system, test whether the communication
network between the local monitoring or SCADA system and equipment is perfect and the information
transmission is correct. The test is made via the remote communication test function on the operation
interface of the equipment, setting validation or secondary wiring calibration can be made at the same
time.
The protection function and action logic of the equipment are tested via simulation and other tests. The
onsite debugging is only used to validate the validity of all settings, others can be reliably guaranteed.
Observe whether all phase currents, voltages and other phase angles displayed by the LCD of the
equipment is consistent with the practical operation results after the line is powered.
a) The function definition of the keyboard meets the operation habits, the keyboard is used to
browse information, modify the setting and complete the corresponding control in the function
menu conveniently.
b) Monitor operation and control or operate operation mode simply and quickly.
c) Provide customization function of the display control image to meet the operation habit of the
27
CSC-200 numerical protection measurement control equipment Manual
user.
a) Circularly display the current time, measurement value, operating soft connector, and current
setting zone under the general status.
b) When the equipment starts up exceptionally or the protection acts, the background light of the
display screen is enhanced to actively display the event information via a highlighted mode.
c) Respond to the keyboard command and enhance the background light of the display screen to
display the man-machine dialog interface via the highlighted mode.
d) LCD is divided into LCD (320*240) and LCD(160*80), refer to the practical object for detailed
configuration.
8.1.2 Keyboard
The keyboard consists of [↑], [↓], [→], [←], [SET] and [QUIT] keys and can be used to complete all
man-machine dialog operations.
[SET] key
a) To press “SET” key, activate the main menu under circular display status.
b) When you make the operations such as switching link, setting, switching setting zone, setting
time, setting equipment address. “SET” key is equivalent to press Enter key. To press “SET” key,
you can confirm the execution.
[QUIT] key
a) Clear screen
b) When you operate the menu, to press “QUIT” key, you can cancel the operation, or return to the
higher menu.
b) When you enter a digit, you can use [←] and [→] key to move the cursor left and right to a digit,
and use [↑] and [↓] to increase or decrease the digit.
The first indicator of the CSC-200 equipment is “run /alarm” indicator, generally the “run/alarm” indicator
keeps constant green and shows that the equipment can work normally; the green indicator flickers after
28
CSC-200 numerical protection measurement control equipment Manual
the protection starts, and the indicator recovers to constant green after protection equipment is reset; the
indicator keeps constant red on when the equipment gives an alarm, and the indicator will recover to
constant green on status when the equipment resets.
Wherein 10 green indicators indicate “XXX protection function connector operate” and the red indicator
indicates that the protection function acts.
Special example:
a) The “reclosing” indicator for CSC-211 keeps constant green on and shows that the reclosing
function starts up and is fully charged; when the green indicator flickers, it shows that the equipment
is being charged; when the red indicator is constant on, it indicates the reclosing exit.
8.3. Equipmentmenu
29
CSC-200 numerical protection measurement control equipment Manual
When the equipment normally starts up, the default image will circularly display current time,
measurement value, computation value, link status, and operation setting zone. when the protection acts
or the alarm occurs, the equipment will automatically pop up the event information image. The
equipment can respond to the keyboard commands and display the tree menu or operation interface.
As shown in the figure 11-2, the equipment menu consists of main menu and multi-level sub-menu, the
menu at different levels is different in operation right. The information monitoring does not require
password validation, such as the operation information monitoring, setting view, and history report view.
The parameter setup and test control operation of the equipment such as the setting, link
commission/cease, and operation setting zone switching require the password validation to avoid
accidental modification to the important operation parameters of the equipment which leads to the
operation exceptionally of the equipment or mistaken action or rejection of the protection. The operation
password is 【8888】.
31
CSC-200 numerical protection measurement control equipment Manual
Note 1: 【Print Setup】 now the equipment support the network to share the print and 485 share print,
only a special print server is provided, the MMI print function can be used.
Note 2: 【Equipment Test】 when the digital output test and precision test command are used, to
prevent the equipment from leading to unnecessary information interference, the protection will
automatically exit. In principle, the equipment can be tested when it shuts down the operation.
Note 3: 【Measurement Calibration】 it is mainly used for the precision calibration of the measurement
module, a precise standard voltage power supply is required for coordination. If no special requirement ,
generally this operation is not executed at the site, otherwise, it may lead to insufficient precision of the
measurement module.
33
CSC-200 numerical protection measurement control equipment Manual
The following items should be carefully checked before the equipment starts up.
c) The settings of the equipment should be consistent with the setting list.
d) The operation setting zone and protection commission/cease link of the equipment should meet
the operation requirement.
The breaker location and other auxiliary switch locations of the equipment should be consistent with the
practical locations.
Because the equipment has a perfect software and hardware self-check function, the effective routine
maintenance means is to monitor the signal node and LED status of the equipment. Combining with the
LED and LCD under the normal operation, the equipment can show comprehensive operation status and
practical operation data of the equipment without manual interference.
If the protection action occurs, the corresponding saved fault records and recording wave data should be
called in time for accident analysis. After the accident is processed, the action signal contact and related
LED should be reset.
If the alarm call exception occurs, the event should be focused. The observed phenomena should be
recorded in detail. if it is the equipment operation exception (such as load and zero-current alarm), the
corresponding operation regulation is used for processing. If it is the key part exception of the equipment,
the equipment should stop for overhaul. After the alarm reason is eliminated, the alarm signal contact
and related LED of the equipment should be reset.
c) Do not modify the important operation parameters of the equipment during operation such as
the hardware test and setting to avoid the incorrect action of the equipment or influences on the
whole performance.
If the equipment encounters an exception which can not be solved, you should contact us as early as
possible, do not disassemble and repair it by self.
a) The repair must comply with the local or power regulations after the equipment starts up.
b) The repair must be performed by the professionals after the equipment starts up.
34
CSC-200 numerical protection measurement control equipment Manual
c) Some rear terminals of the equipment have a high voltage.
e) Do not make digital input drive, switch setting zone, change setting, switch link, and change
equipment address at random during operation.
f) When the alarm indicator of the equipment is on, you should instantly notify the relay protection
equipment staff to process.
b) The air does not include erosive materials such as acid and alkali.
c) The equipment can normally operate under -10℃ ~ +55℃ (in Celsius degree) temperature, if
the temperature is beyond this scope and is within -25℃ ~ +70℃, the LCD may display
exception and blurry front, but the protection is not affected, and the action deviation will not
exceed the allowed range.
35