SERVICE REPORT

Service Representative Arfy A. Joya


**Project Name / Project No.**
Date Jan 26,2023
Company Name CPL Packaging INC
Address Lot No. B1-2 Carmelray Industrial Park II brgy Milagrosa Calamba City
Contact Person / Job Title Mr. Emmanuel P. Oña
Email Address Emmanuel.Ona@Suntory.com

Tel / Fax / Mobile 0908-866 9907

Industry Sector caps

Summary of the Visit

Project Dismantle and Installation

For Project Adjusted lay Out

> New Chiller will position near the rear wall


>The piping will be adjusted to have enough space in front
>The concrete will be replace by detachable Solid wall panel
>The Chiller Room size is same only the chiller position will adjust to utilize the chiller room area
50

940

Not possible to extend the Chiller Room due to Auxiliary outside the Bldg

Subcontractor scope
Opening of Concrete wall

Dismantle of Exhaust Ducting


Dismantle of Pipe
Dismantle of old chiller
Adjustment of Base Footing 2880x1525 (plus 10 on each side)
Chiller entry point is from Production Bay Loading

Assistance for positioning and Installation of New Chiller


Installation of Exhaust Ducting need to confirm if the Exhaust fan is 2pcs or 3pcs

Installation of Pipe supply and discharge 50 from wall to chiller


Top water supply and drain

Installation and replace of new breaker and power cable wire

Another Subcontractor will do the Vacuum discharge of gas and Charging of gas

Arfy A. Joya
Service Engineer