EAST CENTRAL RALWAY

Office of the
DRM(Mlech ySPJ
Dated-25.08.2023
File No.- M 284 itemized RSP/2024-25

CDODBG, CDOJYG
AO/RXL, AMESHC, AME/DBG

Sub- Submissionof proposal for itemized Rolling Stock Programme for 2024-25.
enclosed).
Ref- HQ Letter No.-ECR-HÌOMech(RSPYI/2020 dated-23.08.2023.(copv
*****

Vide ref. above. itemized Rolling Stock items are io be proposed in itemized Roling
under itemized
Stock Programme for 2024-25. Therefore it is required to provide the list of items consolidated
Rolling Stock Programme for 2024-25 in the following prescribed format so that
Ist may be put up for short listing.
Anticipated Cost Justification
S. Item desceription Qty
No.

will be
It is mentioned that if no any proposal of items received up to 31.08.2023, it
assumed that no RSP item is required.

DA: As above.

Sr DME/C&W/SPJ

Copy to:- DEnIM/SPJ:For kind intornation and n'.


Sutata
2sla)as
East Central Railway Office of the
PCME
Hajipur- 844101

Dtd: 23.08.2023
ECR-HQOMech(RSP)/1/2020
Divisional Railway Manager
DNR, DDu, DHN, SEE &SPJ,
Chief Workshop Manager
CRWIHRT & SPJ

Sub: Itemised RollingStock Programme for 2024-25


As per trends of recent years, it is anticipated that letter from Raivway Board for
submission of ltemised RSP proposals for FY 2024-25 will be issued in September
2023.

As a measure to save time, it is requested to provide the description, aliocation,


proposed cost, qty. and justification of items pertaining to Coaching. Freight, MEMU.
DEMU&VWorkshop to be proposed under Itemised RSP 2024-25 so that the same may
be processed for approval of PCME before further processing at HQ level.
While submitting the list of proposals, quantities sanctioned under previous years
Itemised Rolling Stock Programmes, Bulk RSP, Umbrella RSP etc. should be taken into
account and quantity proposed should be as per norms of UES or consumption pattern
Supported with documentary evidence.
It may be noted that items required on additional account should invariably be
proposed in CAP and not on Development Funds as Railway Board is not allotting
sufficient funds in this allocation.

The above information may be submitted to this office by 07.09.2023.

(Atul Priyadarshi)
CWE/ECR