S.No Date Description of Hazard Action Immediate action Categories Concernes BU/ DPT. RCA Identification Picture Status Closing Picture Comments Column1
Name To Person Date
Informed to area HSE person to Barricade the area and place Nazeer
Roadside area is not barricaded while make barricade the area to Unsafe Road/ OCC Plant Lack of machines inspection notice and warning signages. Chishti
9 20-Mar civil works was in progress outside OCC ensure isolation of civil-works Condition Vehicles RJA Area and audits Provide training to workers on (Area HSE OPEN Waqas Saeed
plant 1. area from vehicle movement Hazards road safety. Control hazards Coordinator
area. through PTW. Do area visits )
regularly. Supervise all
construction activities
During inspection of Descon site, it was Immediately ask the workers to Barricade the excavation area
observed that the workers and move back and Informed to Finishing Lack of awareness, negligence, properly, place safety signs,
supervisor were found standing at the Falling Kausar (EHS- Workers were
11 20-Mar edge of excavation and hard barrication EHS supervisor to install hard Unsafe Act Hazard DESCON House no inspection, not following Follow protocols of excavation, DEL) 20-Mar Closed Asad Ali removed
was missing around excavation to barrication around excavation Marquee PB SOPs of excavation Give awareness to staff.
protect falling of person and objects area Ensure good supervisor at site