FOUNDATION/SUB STRUCTURE
STEEL WORKS
FOOTING
560 PCS. D16 gr40 TOP & BOTTOM BARS 312,480.00
25 KGS #16 TIE WIRE 2,125.00
FOOTING TIE BEAM
180 PCS. D16 gr40 MAIN BARS 100,440.00
2 PCS. D10 WEB BARS 438.00
218 PCS. D10 gr40 STIRRUP 47,742.00
26 KGS #16 TIE WIRE 2,210.00
COLUMNS 2.00 meter high
65 PCS. D16 gr40 VERTICAL BARS 36,270.00
77 PCS. D10 gr40 LATERAL TIES 16,863.00
8 KGS #16 TIE WIRE 680.00
SEPTIC TANK
150 mmTHK BOTTOM SLAB
16 PCS. D12 gr40 TEMPERATURE BARS 20,096.00
125 mmTHK TOP SLAB
16 PCS. D12 gr40 TEMPERATURE BARS 20,096.00
150 mm THK CHB WALL
11 PCS. D10 gr40 VERTICAL BARS @400 2,409.00
11 PCS. D10 gr40 HORIZONTAL BARS @600 9,636.00
BOND BEAMS/STIFFENER COLUMNS
34 PCS. D16 gr40 MAIN BARS 75,888.00
43 PCS. D10 gr40 STIRRUP 37,668.00
11 KGS #16 TIE WIRE 935.00
685,976.00
CONCRETE
FOOTING
425 BAGS 40 KG. CEMENT (CLASS A) 106,250.00
24 CU. M RIVERSAND 21,600.00
28 CU. M 3/4" GRAVEL 28,000.00
FOOTING TIE BEAM/GROUND BEAM
80 BAGS 40 KG. CEMENT (CLASS A) 20,000.00
5 CU. M RIVERSAND 4,500.00
9 CU. M 3/4" GRAVEL 9,000.00
COLUMNS 2.00 meter high
34 BAGS 40 KG. CEMENT (CLASS A) 8,500.00
2 CU. M RIVERSAND 1,800.00
Prepared by:
GROUND FLOOR
STEEL WORKS
SLAB ON GRADE
325 PCS. D10 gr40 TEMPERATURE BARS @200 71,175.00
150 KGS #16 TIE WIRE 12,750.00
WALL FOOTING
10 PCS. D12 gr40 WALL FOOTING LONG. BARS 3,140.00
10 PCS. D12 gr40 TRANSVERSE BARS @200 3,140.00
2 KGS #16 TIE WIRE 170.00
COLUMNS 4.0 meter high
Prepared by:
Prepared by:
Prepared by:
Prepared by:
SECOND FLOOR
STEEL WORKS
SUSPENDED SLAB
456 PCS. D10 gr40 TEMPERATURE & EXTRA BARS 99,864.00
56 KGS #16 TIE WIRE 4,760.00
BEAMS
164 PCS. D16 gr40 MAIN BARS 91,512.00
261 PCS. D10 gr40 STIRRUP 57,159.00
32 PCS. D12 gr40 WEB BARS 10,048.00
26 KGS #16 TIE WIRE 2,210.00
COLUMNS 3.4 meter high
140 PCS. D16 gr40 MAIN BARS 78,120.00
541 PCS. D10 gr40 LATERAL TIES 118,479.00
80 KGS #16 TIE WIRE 6,800.00
468,952.00
CONCRETE
SUSPENDED SLAB
145 BAGS 40 KG. CEMENT (CLASS A) 36,250.00
8 CU. M RIVERSAND 7,200.00
16 CU. M 3/4" GRAVEL 16,000.00
Prepared by:
Prepared by:
Prepared by:
Prepared by:
Prepared by: