General
PEB-1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 163
PEB-2 Scope. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 163
PEB-3 Optional Requirements for the Boiler Pressure Vessel. . . . . . . . . . . . . . . . . . . . . . . . . . . 163

Materials
PEB-5 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 163

Design
PEB-8 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 164
PEB-9 Welding. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 164
PEB-10 Inspection Openings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 164
PEB-11 Feedwater Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 164
PEB-12 Blowoff . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 164
PEB-13 Water Gages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 164
PEB-14 Pressure Gages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 165
PEB-15 Safety Valves. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 165
PEB-16 Automatic Devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 165
PEB-17 Hydrostatic Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 165
PEB-18 Inspection and Stamping of Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 165
PEB-19 Manufacturers’ Data Report for Electric Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 166

161
PART PEB
REQUIREMENTS FOR ELECTRIC
BOILERS

GENERAL by the passage of an electric current through a resistance


heating element immersed in water.
PEB-1 GENERAL
The rules in Part PEB are applicable to electric
boilers and parts thereof and shall be used in conjunction PEB-3 OPTIONAL REQUIREMENTS FOR
with the general requirements in Part PG as well as THE BOILER PRESSURE VESSEL
with the special requirements in the applicable Parts
The boiler pressure vessel may be constructed in
of this Section which apply to the method of fabrica-
compliance with the ASME Pressure Vessel Code Sec-
tion used.
tion VIII, Division 1, rules for unfired steam boilers
[UW-2(c)] subject to the following conditions:
PEB-3.1 The Manufacturer who certifies and stamps
PEB-2 SCOPE
the completed boiler shall specify to the “U” stamp
PEB-2.1 This Part contains special rules for construc- holder all additional requirements of Part PEB, which
tion of electric boilers both of the electrode and immer- are not requirements of Section VIII, Division 1, and
sion resistance element type. This Part does not include shall ensure that these requirements are satisfied.
electric boilers where the heat is applied to the boiler
PEB-3.2 These additional requirements are:
pressure vessel externally by electric resistance heating
elements, induction coils, or other electrical means. PEB-3.2.1 The materials of construction shall com- 98
These types of electric boilers shall be constructed in ply with the requirements of PEB-5.1 and PEB-5.3.
accordance with other applicable Parts of this Section.
PEB-3.2.2 Inspection openings shall comply with
PEB-2.2 Electric boilers shall be marked with the the requirements of PEB-10.
“S” or “M” symbol (except when the boiler pressure
PEB-3.3 The boiler pressure vessel shall be stamped
vessel is constructed under the provisions of PEB-3)
with the ASME Code “U” symbol and be documented
by the Manufacturer of the boiler pressure vessel. When
with the ASME U-1 or U-1A Data Report.
the trim, fixtures, and fittings such as valves, threaded
piping, and appurtenances are connected to the electric PEB-3.4 The master Data Report P-2A for the Elec-
boiler by a Manufacturer not authorized to apply the tric Boiler shall indicate “Boiler pressure vessel con-
“S” or “M” stamps, the boiler assembler shall apply structed to Section VIII, Division 1 as permitted by
an “E” stamp to the completed assembly. “E” stamp Part PEB.”
holders are limited to the use of assembly methods
that do not require welding or brazing.
PEB-2.3 An electrode type boiler is defined as an MATERIALS
electric boiler in which heat is generated by the passage PEB-5 GENERAL
of an electric current using water as the conductor.
PEB-5.1 Materials used in the construction of pres-
PEB-2.4 An immersion resistance element type boiler sure parts for electric boilers shall conform to one of
is defined as an electric boiler in which heat is generated the specifications in Section II and shall be limited to

163
PEB-5.1 1998 SECTION I PEB-13.2

those permitted by PG-6, PG-7, PG-8, and PG-9 for (0.14 m3) need not be fitted with washout or inspection
which allowable stress values are given in Tables 1A and openings.
1B of Section II, Part D, unless specifically permitted in
other applicable parts of this Section. PEB-10.2 Electric boilers of more than 5 cu ft
(0.14 m3) not provided with a manhole, shall have an
98 PEB-5.2 The plates or heads shall not be less than inspection opening or handhole located in the lower
3⁄ in. (4.8 mm) in thickness. portion of the shell or head. The inspection opening
16
shall not be smaller than NPS 3 (DN 80). In addition,
98 PEB-5.3 Electric boilers of the emersion element electric boilers of the resistance heating element type
type may be fabricated of austenitic stainless steel type designed for steam service shall have an inspection
304, 304L, 316 and 316L, of any material specification opening or handhole at or near the normal waterline.
listed in PG-6 and PG-9, under the following conditions:
(a) The vessel shall not exceed the diameter, volume,
or pressure limits of PMB-2 for miniature boilers.
(b) A precautionary statement that the boiler shall PEB-11 FEEDWATER SUPPLY
be operated on deionized water only, having a minimum PEB-11.1 The feedwater source to electric boilers
specific resistivity of 1 megohm-cm, shall be clearly shall be capable of meeting the applicable requirements
marked on the boiler in a visible location. of PG-61.
PEB-11.2 Feedwater connections to an electric boiler
shall not be smaller than NPS 1⁄2 (DN 15).
DESIGN
PEB-8 GENERAL
PEB-8.1 The rules in the following paragraphs apply PEB-12 BLOWOFF
specifically to the design of electric boilers and parts PEB-12.1 The blowoff piping for each electric boiler
thereof and shall be used in conjunction with the general pressure vessel having a normal water content not
requirements for design in Part PG, as well as with exceeding 100 gal (380 l) is required to extend through
the specific requirements for design in applicable Parts only one valve.
of this Section which apply to the method of fabrica-
tion used. PEB-12.2 The minimum size of blowoff pipes and
fittings shall be NPS 1 (DN 25), except that for boilers
PEB-8.2 Responsibility of design of electric boilers of 200 kW input or less the minimum size of pipe
to be marked with the “E” symbol shall be that of and fittings may be NPS 3⁄4 (DN 20).
the holder of the “E” stamp.

PEB-13 WATER GAGES


PEB-9 WELDING
PEB-13.1 Electric boilers of the electrode type shall
PEB-9.1 Electric boilers may be constructed by fusion have at least one water gage glass. The water gage
welding in accordance with all the requirements of this glass shall be located as to indicate the water levels both
Section except that neither postweld heat treatment nor at startup and under maximum steam load conditions as
radiography of the welded joints are required when the established by the Manufacturer. No low-water cutoff
following limitations are not exceeded: is required for electrode type boilers.
(a) 16 in. (406 mm) inside diameter of shell
(b) 100 psig (690 kPa) maximum allowable working PEB-13.2 Electric boilers of the resistance element
pressure type shall have at least one water gage glass. The
lowest visible part of the water gage shall be located
at least 1 in. above the lowest permissible water level
specified by the Manufacturer. Each electric boiler of
PEB-10 INSPECTION OPENINGS
this type shall also be equipped with an automatic low-
PEB-10.1 Electric boilers of a design employing a water cutoff on each boiler pressure vessel so located
removable cover which will permit access for inspection as to automatically cut off the power supply to the
and cleaning and having an internal volume (exclusive heating elements before the surface of the water falls
of casing and insulation) of not more than 5 cu ft below the visible part of the glass.

164
PEB-13.3 PART PEB — REQUIREMENTS FOR ELECTRIC BOILERS PEB-18.3.3

PEB-13.3 Tubular water glasses on electric boilers the requirements of PEB-18.2. Inspection of the boiler
shall be equipped with protective rods or shields. pressure vessel by the Authorized Inspector, during and
after construction, shall be in accordance with PG-90.1
and PG-90.3.
PEB-14 PRESSURE GAGES
PEB-18.1.1 Electric boilers having only threaded
PEB-14.1 Pressure gages shall meet the requirements
piping and exceeding the size limitations specified in
of PG-60.6.
PEB-18.1 shall have a final inspection by the Authorized
Inspector and who shall witness the hydrostatic test
called for in PEB-17.2.
PEB-15 SAFETY VALVES
PEB-15.1 Each electric boiler shall have at least one PEB-18.1.2 For electric boilers having welded
safety valve or safety relief valve, and if it has a power external trim the inspection requirements of PG-90.1
input more than 1100 kW, it shall have two or more and the hydrostatic test requirements of PG-99 apply.
safety valves or safety relief valves.
PEB-18.2 Each electric boiler Manufacturer shall
PEB-15.2 The minimum safety valve or safety relief
comply with the applicable requirements of PG-104
valve relieving capacity for electric boilers shall be
and PG-105. The facilities and organization of electric
31⁄2 lb /hr /kW (1.6 kg/hr/kW) input.
boiler Manufacturers or assemblers applying for or
renewing the “E” stamp shall be subject to a joint
review by his inspection agency and the legal jurisdic-
PEB-16 AUTOMATIC DEVICES
tion involved (see last paragraph of PG-105.4).
PEB-16.1 Electric boilers shall be provided with
pressure and /or temperature controls. PEB-18.2.1 Those Manufacturers holding an “E”
stamp and assembling units where the final shop inspec-
tion is not mandatory (see PEB-18.1) shall be subject
PEB-17 HYDROSTATIC TEST to review by his Authorized Inspector’s Agency on a
quarterly or more frequent basis if deemed necessary
PEB-17.1 Each electric boiler pressure vessel shall
by the Authorized Inspector’s Agency. However, subject
be hydrostatically tested at completion of fabrication
to written agreement between the Manufacturer and his
in accordance with PG-99 or PMB-21, as applicable.
inspection agency and the written approval of the
PEB-17.2 In addition to the above, after assembly appropriate legal authority under which the Authorized
of the boiler pressure vessel and the external threaded Inspector is commissioned, the frequency of this review
piping, the electric boiler shall be given a final hydro- may vary, but in no case shall it exceed the period
static test at a pressure not less than the safety valve of 6 months.
setting.
PEB-18.3 The stamping of electric boilers shall
PEB-17.3 When the electric boiler is to be marked
conform to the requirements of PG-106.
with the “E” symbol, the symbol shall be applied after
completion of the hydrostatic test of PEB-17.2.
PEB-18.3.1 The stamping of the boiler pressure
vessel shall be located as called for in PG-111.8 and
need not indicate the kW input or the maximum designed
PEB-18 INSPECTION AND STAMPING
steaming capacity.
OF BOILERS
A99 PEB-18.1 Inspection of electric boilers shall be as PEB-18.3.2 The stamping of the complete electric
required by PG-90.1 and PG-90.3, except that for boiler shall be on a separate metallic plate and shall
completed electric boilers having only threaded external be in accordance with PG-106.4.1. This plate shall be
piping and not exceeding either 800 kW per vessel or located on the assembly so that it is readily visible
600 V, inspection by the Authorized Inspector after from the operating floor.
completion of assembly and trim may be omitted pro-
vided the electric boiler Manufacturer shall make an PEB-18.3.3 For those electric boilers which do
equivalent examination of the completed electric boiler not receive final inspection by the Authorized Inspector
in accordance with a quality control procedure meeting (see PEB-18.1) the stamping required by PEB-18.3.2

165

ASME B&PVC sec1$$$u45 04-15-99 16:39:09 pd: sec1


PEB-18.3.3 1998 SECTION I PEB-19.2

need not be done in the presence of the Authorized


Inspector.
PEB-18.4 For boiler pressure vessels constructed
under the provisions of PEB-3, the inspection and
stamping requirements of Section VIII, Division 1 shall
be followed.

PEB-19 MANUFACTURERS’ DATA


REPORT FOR ELECTRIC BOILERS
PEB-19.1 This form consists of two parts. Part I is
to be completed by the Manufacturer of the boiler
pressure vessel who is the holder of the “S” or “M”
stamp and his inspection agency. Part II is to be
completed by the Manufacturer responsible for the
completed electric boiler who shall be authorized to
use any of the “S,” “M,” or “E” stamps.
PEB-19.2 When the boiler pressure vessel is con-
structed by a “U” stamp holder and certified on a U-
1 or U-1A Data Report, Part 1 shall be completed by
the “S,” “M,” or “E” stamp holder to the extent
indicated in Guide A-351.1.