Professional Documents
Culture Documents
HPGCL-DAC Verification For The Month of October-2022
HPGCL-DAC Verification For The Month of October-2022
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Partial / Total Availability for Availability for Total Availability
Date Time Reference claiming CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
6-Oct-22 5:00:00 27 203,008 203,008 58,105 58,105 - 58,105 58,105 - 58,105 101,504 101,504 203,008 0550 hrs NPCC demand half complex
0602 hrs achieved half complex base
6-Oct-22 6:00:00 27 203,008 203,008 100,281 100,281 - 100,281 100,281 - 100,281 100,281 102,727 203,008 load
6-Oct-22 7:00:00 29 200,325 200,325 100,382 100,382 - 100,382 100,382 - 100,382 100,382 99,943 200,325 -
6-Oct-22 8:00:00 32 196,023 196,023 99,259 99,259 - 99,259 99,259 - 99,259 99,259 96,764 196,023 -
6-Oct-22 9:00:00 33 194,517 194,517 98,482 98,482 - 98,482 98,482 - 98,482 98,482 96,035 194,517 -
6-Oct-22 10:00:00 34 192,978 192,978 97,661 97,661 - 97,661 97,661 - 97,661 97,661 95,317 192,978 -
6-Oct-22 11:00:00 36 189,801 189,801 95,933 95,933 - 95,933 95,933 - 95,933 95,933 93,868 189,801 -
6-Oct-22 12:00:00 35 191,405 191,405 96,999 96,999 - 96,999 96,999 - 96,999 96,999 94,406 191,405 -
6-Oct-22 13:00:00 35 191,405 191,405 96,652 96,652 - 96,652 96,652 - 96,652 96,652 94,753 191,405 -
6-Oct-22 14:00:00 34 192,978 192,978 97,719 97,719 - 97,719 97,719 - 97,719 97,719 95,259 192,978 -
a. 1548 hrs NPCC demand 55 MW
6-Oct-22 15:00:00 34 192,978 192,978 94,363 94,363 - 94,363 94,363 - 94,363 96,489 96,489 192,978 b. 1556 hrs achieved 55 MW
6-Oct-22 16:00:00 34 192,978 192,978 55,000 55,440 - 55,440 55,440 - 55,440 96,489 96,489 192,978 -
6-Oct-22 17:00:00 33 194,517 194,517 55,000 55,455 - 55,455 55,455 - 55,455 97,259 97,259 194,517 -
6-Oct-22 18:00:00 33 194,517 194,517 55,000 55,093 - 55,093 55,093 - 55,093 97,259 97,259 194,517 -
6-Oct-22 19:00:00 32 196,023 196,023 55,000 55,541 - 55,541 55,541 - 55,541 98,012 98,012 196,023 -
6-Oct-22 20:00:00 31 197,493 197,493 55,000 55,325 - 55,325 55,325 - 55,325 98,747 98,747 197,493 -
6-Oct-22 21:00:00 31 197,493 197,493 55,000 55,512 - 55,512 55,512 - 55,512 98,747 98,747 197,493 -
6-Oct-22 22:00:00 30 198,927 198,927 55,000 55,598 - 55,598 55,598 - 55,598 99,464 99,464 198,927 -
6-Oct-22 23:00:00 30 198,927 198,927 55,000 55,383 - 55,383 55,383 - 55,383 99,464 99,464 198,927 -
DAY 6 TOTAL 4,729,012 4,729,012 1,750,836 1,756,310 - 1,756,310 1,756,310 - 1,756,310 - - 2,371,654 2,357,358 4,729,012 ###
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
7-Oct-22 22:00:00 28 201,685 201,685 55,671 55,671 - 55,671 55,671 - 55,671 100,843 100,843 201,685 2255 hrs NPCC demand half complex
2307 hrs achieved half complex base
7-Oct-22 23:00:00 28 201,685 201,685 96,695 96,695 - 96,695 96,695 - 96,695 96,695 104,990 201,685 load
DAY 7 TOTAL 4,771,987 4,771,987 1,362,366 1,374,307 - 1,374,307 1,374,307 - 1,374,307 - - 2,381,846 2,390,141 4,771,987 ###
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
11-Oct-22 7:00:00 24 206,748 206,748 55,000 55,699 - 55,699 55,699 - 55,699 103,374 103,374 206,748 0755 hrs NPCC demand half complex
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)
Declared
Ambi /Revised NPCC Demand
ent Capacity at /Adjusted (kW) ACTUAL NEO (kW) ACTUAL NEO ACTUAL NEO Admissible Admissible Admissible Scheduled Availability for Availability for Total Availability
Partial / Total claiming
Date Time Reference CPP on claiming CPP on Remarks
Temp Conditions (KW) Capacity at on Gas (kW) on HSD (kW) NEO on Gas NEO on HSD NEO Outage Forced Outage Gas HSD for claiming CPP
(°C) Ambient Temp
(kW)
1. Checked "Declared/Revised/Adjusted Capacity column" only and found it as record obtained from NPCC Control Room and as provided by IPP.
2. Annexure-A is attached regarding Forced outages and other events.
Prepared By: Deputy Manager (LDs-VII)