TS No.

033
SITE TESTING Page 1 of 4
SCHEDULE Revision 1

SITE TESTING SCHEDULE – TRANSDUCERS / INSTRUMENTATION


Client: Site:
Client Ref:
Client Rep:
Circuit: Contract Number:
Test Engineer: Date Tested:
Panel:

WARNING
The use of equipment out of calibration is strictly prohibited. Prior to the
commencement of any activity on this STS, confirmation that all requiring
calibration carries a current calibration label.

General

Use test equipment capable of producing a good waveform to simulate the measured quantities of
current/voltage/frequency over the range of the transducer/instrument under test.

Where possible, tests should include as much of the secondary wiring as practical. Conjunctive tests from the CT/VT
secondary side through to the indicating device are preferable

Inspect the equipment for any signs of transit damage

Confirm that the equipment corresponds to the relevant


General Arrangement

Ensure that the panel wiring has been checked to Wiring


Diagram No + rev

Disconnect Transducers from the measured system, i.e.


CT's & VT's

Ensure that with any equipment under test there are no


open circuit CT's & no possibility of back energising VT's

Inspect the equipment for any signs of transit damage

Kirby 2019 TS.033 TRANSDUCERS / INSTRUMENTATION


TS No. 033
SITE TESTING Page 2 of 4
SCHEDULE Revision 1

Test procedure

Meters
Inject values to check the accuracy of meters at Full Scale and, as near as possible, mid scale. Observe also the 'zero'
condition with no injection to the meter

Transducers
Before checking the accuracy of transducers apply nominal input quantities and allow the unit to 'soak' for 5
minutes. For transducers with 4 to 20mA output or similar, check at maximum and at minimum. For 'positive and
negative' output transducers, e.g. -1mA 0 +1mA check accuracy at the extremes of range and at zero

MW & MVar TRANSDUCER TESTS

MW Transducer serial No

MVar Transducer serial No

INJECTED NOMINAL LCC STANDBY


Volts Amps Ph Angle MW MVar MW MVar MW MVar
63.5 0 0
63.5 0.25 0
63.5 0.25 +90
63.5 0.25 180
63.5 0.25 -90
63.5 0.5 0
63.5 0.5 +90
63.5 0.5 180
63.5 0.5 -90
63.5 0.75 0
63.5 0.75 +90
63.5 0.75 180
63.5 0.75 -90
63.5 1 0
63.5 1 +30
63.5 1 +60
63.5 1 +90
63.5 1 +120
63.5 1 +150
63.5 1 180
63.5 1 -150
63.5 1 -120
63.5 1 -90
63.5 1 -60
63.5 1 -30

Instrument Manufacturer Serial No. Input/Output Auxiliary Values OUTPUT/INDICATION

Kirby 2019 TS.033 TRANSDUCERS / INSTRUMENTATION


TS No. 033
SITE TESTING Page 3 of 4
SCHEDULE Revision 1

type & supply Injected Value Monitored at


Drawing ref

REMARKS & TEST EQUIPMENT USED (Include Asset/Plant No’s.)

Kirby 2019 TS.033 TRANSDUCERS / INSTRUMENTATION


TS No. 033
SITE TESTING Page 4 of 4
SCHEDULE Revision 1

SIGNED ____________________ FOR KIRBY DATE ____________________

____________________ FOR CLIENT DATE ____________________

Kirby 2019 TS.033 TRANSDUCERS / INSTRUMENTATION