INDODE Comprehensive Maintenance Center ETS Works dispatching ledger (progress)

INDODE ETS Work Zone ADAMA ETS Work Zone MIESO ETS Work Zone
Work group METEHARA ETS Work Zone
Chinese Chinese Ethiopi
date Department progress employee Ethiopians progress Work progress Chine Ethiopians progress Chinese Ethiopians progress
Work progress Pictue employees se Work progress Pictue Work progress Pictue employ ans
s Pictue empl employees employees employees
ees: employ
oyees ees:

➣Comprehensive patrolling from Metehara to


Sirbakunkur and Sirbakunkur to Metehara
➣Performed Skylight Maintenance between
Comprehensive patrolling from Indode to Comprehensive patrolling from Adama to
OCS Lebu up and Lebu to Indode down line Meterhara and Methara to Adama Metehara and Feto station at K216+900- On duty
K200+000
➣Material Consumption:one rubber suspension
insulator

➣Visual inspection on appearance of ➣Visual inspection of substation


traction substation equipment. such as
transformer/instrument transformer/circuit equipments,daily measurment of voltage
and current and data recording of active
9/8/2023 Power breaker/hand-operated isolator/anti- __ __ on duty __ __ on duty __ __ Substation equipments including record __ __
lightening ring/flexible busbar/wall- filling of temperature for indoor and
penetrating bushing/micro computer-based
protective device and AC/DC system at outdoor transformers in both Mieso and
Sirba kunkur Substation.
Indode substation

Communication On duty On duty on duty On duty

➣Outdoor shaft checking, the close ➣ performed signal room health


contactness and fat edge of the turnout inspection,signal room equipment
inspection,outdoor shaft checking,
rail,adjust of notch of the indication rod and outdoor track circuit inspection and switch
Signal On duty locking,check weather external bolt and nuts on duty
are loose,turnout and area clean,add oil for sweep including greasing of the slide
the equipment at Mojo station board in Mieso station.