MEASUREMENT SHEET
Sr. No. Item Description No. Length Width Height/ Quantity Total Quantity Remarks
Depth
1 Dismantling of flexible pavements
Ch. 168+100 to Ch. 168+190 (Junction) 2 90.00 11.00 0.20 2098.80
Ch. 166+780 to Ch. 167+170
Exi. Service road 2 390.00 5.00 0.20 780.00
Ch. 169+558 to Ch. 169+840
Main carriage way 1 282.00 8.75 0.20 493.50
Ch. 169+840 to Ch. 170+214
Main carriage way 2 374.00 8.75 0.20 1309.00
5% extra 234.1
Total 4915.37 4916 Cum
2 Scarification
Ch. 166+780 to Ch. 167+170
Exi. Service road 2 390.00 5.00 3900.00
Main carriage way 2 390.00 11.70 9126.00
Ch. 169+558 to Ch. 169+840
Main carriage way 1 282.00 8.75 2467.50
Ch. 169+840 to Ch. 170+214
Main carriage way 2 374.00 8.75 6545.00
5% extra 1101.9
Total 23140.43 23141 Sqm
3 Box cutting
> Widening Road
Ch. 166+780 to Ch. 167+170 2 390.00 2.00 0.50 780.00
Ch. 169+558 to Ch. 169+840 1 282.00 5.75 0.50 810.75 Including
Ch. 169+840 to Ch. 170+130 2 290.00 5.75 0.50 1667.50 Separator
Ch. 170+130 to Ch. 170+214 2 84.00 5.75 0.50 483.00
(Merge with service road)
5% Extra 1336.58
Total 28068.10 28069 Cum
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
4 Embankment
> Widening Road
Ch. 166+780 to Ch. 167+170 2 390.00 2.00 1.00 1560.00
Ch. 169+558 to Ch. 169+840 1 282.00 5.75 1.00 1621.50 Including
Ch. 169+840 to Ch. 170+130 2 290.00 5.75 1.00 3335.00 Separator
Ch. 170+130 to Ch. 170+214 2 84.00 5.75 1.00 966.00
(Merge with service road)
> Island
Ch. 167+170 to Ch. 167+411 2 241.00 1.20 0.60 347.04
Ch. 167+411 to Ch. 168+000 2 589.00 1.20 0.60 848.16
Ch. 169+558 to Ch. 169+840 2 282.00 1.20 0.60 406.08
Ch. 169+840 to Ch. 170+214 2 374.00 1.20 0.60 538.56
5% Extra 1990.31
Total 41796.51 41797 Cum
5 Subgrade
> Widening Road
Ch. 166+780 to Ch. 167+170 2 390.00 2.00 0.50 780.00
Ch. 169+558 to Ch. 169+840 1 282.00 5.75 0.50 810.75
Ch. 169+840 to Ch. 170+130 2 290.00 5.75 0.50 1667.50
Ch. 170+130 to Ch. 170+214 2 84.00 5.75 0.50 483.00
(Merge with service road)
0
> Service Road
Ch. 167+170 to Ch. 168+100 2 930.00 7.00 0.50 6510.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 0.50 -158.90
Ch. 169+500 to Ch. 170+214 2 714.00 7.00 0.50 4998.00
5% Extra 1750.40
Total 36758.35 36759 Cum
6 GSB
> Widening Road
Ch. 166+780 to Ch. 167+170 2 390.00 2.00 0.20 312.00
Ch. 169+558 to Ch. 169+840 1 282.00 5.75 0.20 324.30
Ch. 169+840 to Ch. 170+130 2 290.00 5.75 0.20 667.00
Ch. 170+130 to Ch. 170+214 2 84.00 5.75 0.20 193.20
(Merge with service road)
0
> Service Road
Ch. 167+170 to Ch. 168+100 2 930.00 7.00 0.20 2604.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 0.20 -63.56
Ch. 169+500 to Ch. 170+214 2 714.00 7.00 0.20 1999.20
0
> Slip Road
Ch. 167+170 to Ch. 168+000 2 830.00 7.00 0.20 2324.00 Including
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 0.20 -63.56 Separator
Ch. 168+000 to Ch. 168+100 2 100.00 7.00 0.20 280.00
(Merge with service road)
Ch. 168+100 to Ch. 168+190 (Junction) 2 90.00 11.00 0.20 396.00
5% Extra 462.28
Total 9707.86 9708 Cum
7 WMM
> Widening Road
Ch. 166+780 to Ch. 167+170 2 390.00 2.00 0.25 390.00
Ch. 169+558 to Ch. 169+840 1 282.00 4.55 0.25 320.78
Ch. 169+840 to Ch. 170+130 2 290.00 4.55 0.25 659.75
Ch. 170+130 to Ch. 170+214 2 84.00 5.75 0.25 241.50
(Merge with service road)
5% Extra 691.66
Total 14524.78 14525 Cum
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
8 CTSB
> Slip Road
Ch. 168+190 to Ch. 168+450 2 260.00 11.00 0.20 1144.00
> Bridge approach
Ch. 167+170 to Ch. 167+530 1 360.00 25.00 0.20 1800.00
Ch. 169+558 to Ch. 169+840 1 282.00 16.00 0.20 902.40
> Ramp
Ch. 168+450 to Ch. 168+850 1 400.00 8.00 0.20 640.00
Ch. 168+450 to Ch. 168+690 1 240.00 8.00 0.20 384.00
5% Extra 243.52
Total 5113.92 5114 Cum
9 CTB
> Slip Road
Ch. 168+190 to Ch. 168+450 2 260.00 11.00 0.14 800.80
> Bridge approach
Ch. 167+170 to Ch. 167+530 2 360.00 12.75 0.14 1285.20
Ch. 169+558 to Ch. 169+840 1 282.00 16.00 0.14 631.68
> Ramp
Ch. 168+450 to Ch. 168+850 1 400.00 8.00 0.14 448.00
Ch. 168+450 to Ch. 168+690 1 240.00 8.00 0.14 268.80
5% Extra 171.72
Total 3606.20 3607 Cum
10 AIL
> Slip Road
Ch. 168+190 to Ch. 168+450 2 260.00 11.00 0.10 572.00
> Bridge approach
Ch. 167+170 to Ch. 167+530 2 360.00 12.65 0.10 910.80
Ch. 169+558 to Ch. 169+840 1 282.00 16.00 0.10 451.20
> Ramp
Ch. 168+450 to Ch. 168+850 1 400.00 8.00 0.10 320.00
Ch. 168+450 to Ch. 168+690 1 240.00 8.00 0.10 192.00
5% Extra 122.30
Total 2568.30 2569 Cum
11 Primer coat
> Widening / Exisitng carriage way
Ch. 169+558 to Ch. 169+840 1 282.00 13.00 3666.00
Ch. 169+840 to Ch. 170+130 2 290.00 13.00 7540.00
Ch. 170+130 to Ch. 170+214 2 84.00 14.50 2436.00
(Merge with service road)
5% Extra 3988.88
Total 83766.38 83767 Sqm
13 Tack coat for Wearing course
Quatntity as per above item 83767 Sqm
14 DBM
> Widening / Exisitng carriage way
Ch. 166+780 to Ch. 167+170 2 390.00 11.70 0.065 593.19
Ch. 169+558 to Ch. 169+840 1 282.00 13.00 0.065 238.29
Ch. 169+840 to Ch. 170+130 2 290.00 13.00 0.065 490.10
Ch. 170+130 to Ch. 170+214 2 84.00 14.50 0.065 158.34
(Merge with service road)
5% Extra 102.65
Total Qty in Cum 2155.73
Considering 2.48 MT/Cum 5346.21 5347 MT
16 50mm thick BC
Ch. 166+780 to Ch. 167+170
Existing Service road 2 390.00 5.00 0.05 195.00
Main carriage way 2 390.00 11.7 0.05 456.30
18 Cat eyes
main carriage way incl. bridge approach 8 1404 '@every 18 m 624.00
Service Road 6 2034 '@every 18 m 678.00
Slip Road 6 1020 '@every 18 m 340.00
Ramp 3 800 '@every 18 m 133.00
Existing ROB with approaches 6 790 '@every 18 m 263.00
Bus lay 2 110 73.00
Add 10 % Extra 212.00
Total 2323.00 2323 No.
19 Road furniture
Hazard board 8 8 8 No.
Hazard with direction 6 6 6 No.
90 cm equilateral triangle lile junction,
round about, give way. Left-right, merge 24 24 24 No.
traffic etc.
20 Precast Kerb
Ch. 167+170 to Ch. 168+000 6 830.00 4980.00
Ch. 169+558 to Ch. 170+130 4 572.00 2288.00
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
Ch. 169+840 to Ch. 170+214 (median) 2 374.00 748.00
5% Extra 400.80
Total 8416.80 8420 Rmt
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
21 Kerb marking
Ch. 167+170 to Ch. 168+000 6 830.00 0.20 996.00
Ch. 169+558 to Ch. 170+130 4 572.00 0.20 457.60
Ch. 169+840 to Ch. 170+214 (median) 2 374.00 0.20 149.60
5% Extra 80.16
Total 1683.36 1684 Sqm
22 Metal beam crash barrier
Ch. 166+780 to Ch. 168+000 2 1220.00 2440.00
Ch. 169+558 to Ch. 170+130 2 572.00 1144.00
Ch. 169+840 to Ch. 170+214 (median) 1 374.00 374.00
Total 3958.00 3960 Rmt
23 150mm dia PVC pipe for drainage at 5.0m interval
26 RCC Drain
Ch. 166+780 to Ch. 167+170 2 390.00 780.00
Ch. 167+170 to Ch. 167+530 2 360.00 720.00
Ch. 167+530 to Ch. 168+000 2 470.00 940.00
Ch. 168+190 to Ch. 168+450 2 260.00 520.00
Ch. 169+558 to Ch. 169+840 2 282.00 564.00
Ch. 169+840 to Ch. 170+214 2 374.00 748.00
Total Length = 4272.00
MEASUREMENT SHEET
Sr. No. Item Description No. Length Width Height/ Quantity Total Quantity Remarks
Depth
1 Dismantling of flexible pavements
Ch. 168+100 to Ch. 168+190 (Junction) 2 90.00 11.00 0.20 2098.80
Ch. 166+780 to Ch. 167+170
Exi. Service road 2 390.00 5.00 0.20 780.00
Ch. 169+558 to Ch. 169+840
Main carriage way 1 282.00 8.75 0.20 493.50
Ch. 169+840 to Ch. 170+214
Main carriage way 2 374.00 8.75 0.20 1309.00
5% extra 234.1
Total 4915.37 4916 Cum
2 Scarification
Ch. 166+780 to Ch. 167+170
Exi. Service road 2 390.00 5.00 3900.00
Main carriage way 2 390.00 11.70 9126.00
Ch. 169+558 to Ch. 169+840
Main carriage way 1 282.00 8.75 2467.50
Ch. 169+840 to Ch. 170+214
Main carriage way 2 374.00 8.75 6545.00
5% extra 1101.9
Total 23140.43 23141 Sqm
3 Box cutting
> Widening Road
Ch. 166+780 to Ch. 167+170 2 390.00 2.00 0.50 780.00
Ch. 169+558 to Ch. 169+840 1 282.00 5.75 0.50 810.75 Including
Ch. 169+840 to Ch. 170+130 2 290.00 5.75 0.50 1667.50 Separator
Ch. 170+130 to Ch. 170+214 2 84.00 5.75 0.50 483.00
(Merge with service road)
5% Extra 1336.58
Total 28068.10 28069 Cum
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
4 Embankment
> Widening Road
Ch. 166+780 to Ch. 167+170 2 390.00 2.00 1.00 1560.00
Ch. 169+558 to Ch. 169+840 1 282.00 5.75 1.00 1621.50 Including
Ch. 169+840 to Ch. 170+130 2 290.00 5.75 1.00 3335.00 Separator
Ch. 170+130 to Ch. 170+214 2 84.00 5.75 1.00 966.00
(Merge with service road)
> Island
Ch. 167+170 to Ch. 167+411 2 241.00 1.20 0.60 347.04
Ch. 167+411 to Ch. 168+000 2 589.00 1.20 0.60 848.16
Ch. 169+558 to Ch. 169+840 2 282.00 1.20 0.60 406.08
Ch. 169+840 to Ch. 170+214 2 374.00 1.20 0.60 538.56
5% Extra 1990.31
Total 41796.51 41797 Cum
5 Subgrade
> Widening Road
Ch. 166+780 to Ch. 167+170 2 390.00 2.00 0.50 780.00
Ch. 169+558 to Ch. 169+840 1 282.00 5.75 0.50 810.75
Ch. 169+840 to Ch. 170+130 2 290.00 5.75 0.50 1667.50
Ch. 170+130 to Ch. 170+214 2 84.00 5.75 0.50 483.00
(Merge with service road)
0
> Service Road
Ch. 167+170 to Ch. 167+530 2 360.00 7.00 0.50 2520.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 0.50 -158.90
Ch. 167+530 to Ch. 168+100 2 570.00 7.00 0.50 3990.00
Ch. 169+500 to Ch. 169+840 2 340.00 7.00 0.50 2380.00
Ch. 169+840 to Ch. 170+214 2 374.00 7.00 0.50 2618.00
5% Extra 1298.70
Total 27272.65 27273 Cum
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
6 GSB
> Widening Road
Ch. 166+780 to Ch. 167+170 2 390.00 2.00 0.20 312.00
Ch. 169+558 to Ch. 169+840 1 282.00 5.75 0.20 324.30
Ch. 169+840 to Ch. 170+130 2 290.00 5.75 0.20 667.00
Ch. 170+130 to Ch. 170+214 2 84.00 5.75 0.20 193.20
(Merge with service road)
0
> Service Road
Ch. 167+170 to Ch. 167+530 2 360.00 7.00 0.20 1008.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 0.20 -63.56
Ch. 167+530 to Ch. 168+100 2 570.00 7.00 0.20 1596.00
Ch. 169+500 to Ch. 169+840 2 340.00 7.00 0.20 952.00
Ch. 169+840 to Ch. 170+214 2 374.00 7.00 0.20 1047.20
0
> Slip Road
Ch. 167+170 to Ch. 167+530 2 360.00 7.00 0.20 1008.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 0.20 -63.56 Including
Separator
Ch. 167+530 to Ch. 168+000 2 470.00 7.00 0.20 1316.00
Ch. 168+000 to Ch. 168+100 2 100.00 7.00 0.20 280.00
(Merge with service road)
Ch. 168+100 to Ch. 168+190 (Junction) 2 90.00 11.00 0.20 396.00
5% Extra 462.28
Total 9707.86 9708 Cum
7 WMM
> Widening Road
Ch. 166+780 to Ch. 167+170 2 390.00 2.00 0.25 390.00
Ch. 169+558 to Ch. 169+840 1 282.00 4.55 0.25 320.78
Ch. 169+840 to Ch. 170+130 2 290.00 4.55 0.25 659.75
Ch. 170+130 to Ch. 170+214 2 84.00 5.75 0.25 241.50
(Merge with service road)
5% Extra 691.66
Total 14524.78 14525 Cum
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
8 CTSB
> Slip Road
Ch. 168+190 to Ch. 168+450 2 260.00 11.00 0.20 1144.00
> Bridge approach
Ch. 167+170 to Ch. 167+530 2 360.00 12.75 0.20 1836.00
Ch. 169+558 to Ch. 169+840 1 282.00 16.00 0.20 902.40
> Ramp
Ch. 168+450 to Ch. 168+850 1 400.00 8.00 0.20 640.00
Ch. 168+450 to Ch. 168+690 1 240.00 8.00 0.20 384.00
5% Extra 245.32
Total 5151.72 5152 Cum
9 CTB
> Slip Road
Ch. 168+190 to Ch. 168+450 2 260.00 11.00 0.14 800.80
> Bridge approach
Ch. 167+170 to Ch. 167+530 2 360.00 12.75 0.14 1285.20
Ch. 169+558 to Ch. 169+840 1 282.00 16.00 0.14 631.68
> Ramp
Ch. 168+450 to Ch. 168+850 1 400.00 8.00 0.14 448.00
Ch. 168+450 to Ch. 168+690 1 240.00 8.00 0.14 268.80
5% Extra 171.72
Total 3606.20 3607 Cum
10 AIL
> Slip Road
Ch. 168+190 to Ch. 168+450 2 260.00 11.00 0.10 572.00
> Bridge approach
Ch. 167+170 to Ch. 167+530 2 360.00 12.75 0.10 918.00
Ch. 169+558 to Ch. 169+840 1 282.00 16.00 0.10 451.20
> Ramp
Ch. 168+450 to Ch. 168+850 1 400.00 8.00 0.10 320.00
Ch. 168+450 to Ch. 168+690 1 240.00 8.00 0.10 192.00
5% Extra 122.66
Total 2575.86 2576 Cum
11 Prime coat
> Widening / Exisitng carriage way
Ch. 169+558 to Ch. 169+840 1 282.00 13.00 3666.00
Ch. 169+840 to Ch. 170+130 2 290.00 13.00 7540.00
Ch. 170+130 to Ch. 170+214 2 84.00 14.50 2436.00
(Merge with service road)
5% Extra 3997.88
Total 83955.38 83956 Sqm
13 Tack coat for Wearing course
Quatntity as per above item 83956 Sqm
14 DBM
> Widening / Exisitng carriage way
Ch. 166+780 to Ch. 167+170 2 390.00 11.70 0.065 593.19
Ch. 169+558 to Ch. 169+840 1 282.00 13.00 0.065 238.29
Ch. 169+840 to Ch. 170+130 2 290.00 13.00 0.065 490.10
Ch. 170+130 to Ch. 170+214 2 84.00 14.50 0.065 158.34
(Merge with service road)
5% Extra 283.39
Total Qty in Cum 5951.16
Considering 2.42 MT/Cum 14401.80 14402 MT
15 40mm thick BC
> Widening / Exisitng carriage way
Ch. 169+558 to Ch. 169+840 1 282.00 13.00 0.04 146.64
Ch. 169+840 to Ch. 170+130 2 290.00 13.00 0.04 301.60
Ch. 170+130 to Ch. 170+214 2 84.00 14.50 0.04 97.44
(Merge with service road)
0
> Slip Road
Ch. 167+170 to Ch. 167+530 2 360.00 5.50 0.04 158.40
Deduction minor bridge @ Ch. 167+271 -2 22.70 5.50 0.04 -9.99
Ch. 167+530 to Ch. 168+000 2 470.00 5.50 0.04 206.80
Ch. 168+000 to Ch. 168+100 2 100.00 7.00 0.04 56.00
(Merge with service road)
Ch. 168+100 to Ch. 168+190 (Junction) 2 90.00 11.00 0.04 79.20
5% Extra 102.65
Total Qty in Cum 2155.73
Considering 2.48 MT/Cum 5346.21 5347 MT
16 50mm thick BC
Ch. 166+780 to Ch. 167+170
Existing Service road 2 390.00 5.00 0.05 195.00
Main carriage way 2 390.00 11.7 0.05 456.30
18 Cate eyes
main carriage way incl. bridge approach 8 1404 '@every 18 m 624.00
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
Service Road 6 2034 '@every 18 m 678.00
Slip Road 6 1020 '@every 18 m 340.00
Ramp 3 800 '@every 18 m 133.00
Existing ROB with approaches 6 790 '@every 18 m 263.00
Bus lay 2 110 73.00
Add 10 % Extra 212.00
Total 2323.00 2323 No.
19 Road furniture
Hazard board 8 8 8 No.
Hazard with direction 6 6 6 No.
90 cm equilateral triangle lile junction,
round about, give way. Left-right, merge 24 24 24 No.
traffic
20 Precast Kerb
Ch. 167+170 to Ch. 167+530 6 360.00 2160.00
Ch. 167+530 to Ch. 168+000 6 470.00 2820.00
Ch. 169+558 to Ch. 169+840 3 282.00 846.00
Ch. 169+840 to Ch. 170+130 4 290.00 1160.00
Ch. 169+840 to Ch. 170+214 (median) 2 374.00 748.00
5% Extra 386.70
Total 8120.70 8130 Rmt
21 Kerb marking
Ch. 166+780 to Ch. 167+170 2 390.00 0.20 156.00
Ch. 167+170 to Ch. 167+530 4 360.00 0.20 288.00
Ch. 167+530 to Ch. 168+000 4 470.00 0.20 376.00
Ch. 169+558 to Ch. 169+840 3 282.00 0.20 169.20
Ch. 169+840 to Ch. 170+130 4 290.00 0.20 232.00
Ch. 169+840 to Ch. 170+214 (median) 2 374.00 0.20 149.60
5% Extra 68.54
Total 1439.34 1440 Sqm
22 Metal beam crash barrier
Ch. 166+780 to Ch. 167+170 2 390.00 780.00
Ch. 167+170 to Ch. 167+530 2 360.00 720.00
Ch. 167+530 to Ch. 168+000 2 470.00 940.00
Ch. 169+558 to Ch. 169+840 2 282.00 564.00
Ch. 169+840 to Ch. 170+130 2 290.00 580.00
Ch. 169+840 to Ch. 170+214 (median) 1 374.00 374.00
27 RCC Drain
Ch. 166+780 to Ch. 167+170 2 390.00 780.00
Ch. 167+170 to Ch. 167+530 2 360.00 720.00
Ch. 167+530 to Ch. 168+000 2 470.00 940.00
Ch. 168+190 to Ch. 168+450 2 260.00 520.00
Ch. 169+558 to Ch. 169+840 2 282.00 564.00
Ch. 169+840 to Ch. 170+214 2 374.00 748.00
Total Length = 4272.00
170214
90 cm equilateral triangle 6
Junction with merging 10
Round about 2
Give way 4
u turn 2
16000 3340
166780
42