MBB HELICOPTERS
MAINTENANCE MANUAL BB - BK 117
823 DUAL AC SYSTEM
Table of Contents
Paragraph Title Page
823-1 DESCRIPTION - DUAL AC SYSTEM 2... eee eee 3
823 - 2 TROUBLESHOOTING - DUAL AC SYSTEM... ee ee ee eee 3
823 - 3 INSPECTION SCHEDULE - DUAL AC SYSTEM 2. eee ee eee 5
823 - 4 FUNCTIONAL TEST - DUAL AC SYSTEM se ee eee eee 6
823 - 5 INSPECTION FOR CONDITION - DUAL AC SYSTEM 2... ee 7
823 - 6 REMOVAL - DUAL AC SYSTEM 2. eee ee ee eee eee 7
823 - 7 INSTALLATION ~ DUAL AC SYSTEM. oe eee ee ee eee 7
823 - 8 Testing conducting and blocking function of diodes... . 8 *
CHAPTER 823
Rev. 15 5 Page 1/2MBB HELICOPTERS
823-
Two
MAINTENANCE MANUAL MBB - BK 117
1 DESCRIPTION - DUAL AC SYSTEM
static inverters are installed below the cockpit floor at STA 2800 (pilot
seats) to supply AC consumers. The inverters convert 28 VDC of the electric
system into 26 V and 115 VAC and supply terminal junction 7B 819.
The
FLT
inverters 1 and 2 are supplied with 28 VDC from NO. 1 and NO. 2
ESS BUS via circuit breakers INV 1 and 2 (overhead console) and via
toggle switches INVERTER 1 and 2 (main switch panel/center console) .
The
terminal junction is supplied with 26 V and 115 VAC via circuit breakers
INVERTER 1/26 VAC/115 VAC and INVERTER 2/26 VAC/115 VAC. These circuit
breakers are installed in the roof area behind the pilot.
In the event of a malfunction or a failure the operative inverter takes over
the
functions of the defective inverter. This operation is controlled by
relays K808 and 818. Failure of an inverter is indicated by yellow caution
lights INV 1 or INV 2 on the annunciator panel.
EFFECTIVITY
The
power supply to the inverters on helicopters equipped with the DAFCS
system is modified as follows in comparison with those helicopters without
this system.
Each inverter is supplied with power through three feedlines connected respec-
tively to the No.1 and No.2 main buses and through a relay to the battery hot
bus.
Each of these feedlines is protected against reverse currents by a diode, so
that disconnection of the buses is ensured in the event of short circuiting
823-,
Rev.
2 TROUBLESHOOTING - DUAL AC SYSTEM
Perform troubleshooting procedures with EPU connected to the helicopter
(refer to paragraph 92-71).
NO. 1 and NO. 2 FLT ESS BUS must be energized,
Circuit breakers INV 1 and 2 must be pushed and toggle switches
INVERTER 1 and 2 set to position ON.
Caution lights INV 1 and 2 must be tested with caution light test switch
ANN PNL TEST.
For troubleshooting refer to wiring diagram 823 in the WDM.
Check that all electrical connectors are clean and tight, and perform
functional test on circuit breakers and toggle switches.
CHAPTER 823
15 Page 3
Helicopters S/N 7183 and prior, equipped with the DAFCS systemMBB HELICOPTERS
MAINTENANCE MANUAL MBB - BK 117
TROUBLESHOOTING (cont inued)
No. TROUBLE SYMPTOM PROBABLE CAUSE CORRECTIVE ACTION
1 Caution light Inverter 1 or 2 Check suspect inverter by
INV 1 or 2 (PS 801) defective temporarily swapping in-
illuminates verters, replace defective
inverter if necessary
28 V de power Check de inputs at connec:
supply of the re- tors P920 and P932, check
spective inverter circuit breakers, toggle
not assured switches and wires for
continuity; repair or
replace if necessary
Relay X808 or X818 Check relay functions
defective i.a.w. wiring diagram,
replace relay if necessary
2 Caution light Relay X808 or X818 Check the appropriate
INV 1 or 2 does
not illuminate
although inver-
ter ac power
supply is switched
off
defective
Electrical wire de-
fective
relay contacts for
continuity, replace relay
if necessary.
Check the appropriate wi-
res for continuity i.a.w.
wiring diagram; repair or
replace if necessary
Table 823-1
CHAPTER 823
Page 4
‘Troubleshoot ing@eurccopter MAINTENANCE MANUAL MBB - BK117
823-3 INSPECTION SCHEDULE (REFER TO APPENDIX A)
Revision 33 CHAPTER 823
Page 5MBB HELICOPTERS
MAINTENANCE MANUAL MBB - BK 117
823-4 FUNCTIONAL TEST - DUAL AC SYSTEM
Measuring instruments:
Digital
voltmeter
Frequency meter
NOTE
To get access to connections of circuit breakers
CB 865, CB 866, CB 867 and CB 868, it is
necessary remove the cabin ceiling panelling aft
of the pilot seat.
1. Connect external power unit (refer to chapter 92-71); circuit breakers
INV 1 and 2, INVERTER 1 and 2/26 VAC/115 VAC and WARN ANN I and
II must be pushed.
2. Set
3, Set
Caution lights INV 1 and 2 must illuminate.
toggle switch INVERTER 1 to position ON
Caution light INV 1 must extinguish.
The AC voltage measured at connecting points 2 of circuit breakers
CB 867 and CB 865 must be 26 V + 1.5 V and 400 Hz + 4 Hz.
The AC voltage measured at connecting points 2 of circuit breakers
CB 868 and CB 866 must be 115 V + 3.5 V and 400 Hz + 4 Hz.
toggle switch INVERTER 1 to position OFF and INVERTER 2 to
position ON.
4, Set
Caution light INV 1 must illuminate and caution light INV 2 must
extinguish.
The AC voltage measured at connecting points 2 of circuit breakers
CB 865 and 867 must be 26 V + 1.5 V and 400 Hz + 4 Hz.
The AC voltage measured at connecting points 2 of circuit breakers
CB 866 and CB 868 must be 115 V + 3.5 V and 400 Hz + 4 Hz.
toggle switch INVERTER 2 to position OFF.
Caution light INV 2 must illuminate.
5. Pull all the circuit breakers that were pushed under step 1.
CHAPTER
Page 6
823
Rev. 3MBB HELICOPTERS
MAINTENANCE MANUAL MBB - BK
823-5 INSPECTION FOR CONDITION - DUAL AC SYSTEM
1. Check electrical connectors and receptacles for corrosion and tight fit.
a. Eliminate corrosion or replace parts concerned
‘Tighten loose connectors or terminal connections
2, Check inverters and relays for damage, corrosion and security of
installation.
a. Replace damaged parts.
b. Tighten attachment screws of inverters and relays. *
823-6 REMOVAL - DUAL AC SYSTEM
1. Removal - inverter
a. Remove nose access door at STA 2800.
b. Disconnect electrical connectors P920 and P921 from inverter 1 (LH) *
and connectors P932 and P933 from inverter 2 and provide with caps. *
¢. Remove hexagon head screws to detach the inverter +
Inverter 2 must be swivelled around the longitudinal trim actuator. *
2. Removal - relay
Remove cabin ceiling panelling aft of the pilot seat.
b. Remove nuts and washers to detach the relay from its base.
823-7 INSTALLATION - DUAL AC SYSTEM
1, Installation - inverter *
Perform the installation in the reverse order of the removal. Prior to
installation of nose access door, perform functional test (refer to para-
graph 823-4).
2. Installation - relay
a. Insert relay with plug-in contacts in base and secure with washers and
nuts.
b. Prior to installation of cabin panelling, perform functional test
(refer to paragraph 823-4).
CHAPTER 823
Rev. 15 Page 7823-8
MBB HELICOPTERS
MAINTENANCE MANUAL MBB - BK 117
EFFECTIVITY Helicopters S/N 7183 and prior, if DAFCS system is installed
Testing conducting and blocking function of diodes
Special tools:
Multimeter - commercial item
1, ‘Testing of diodes in inverter 1 feedlines.
Disconnect power supply.
Set switches INVERTER 1 and INVERTER 2 to OFF.
Pull circuit breakers CB 893 and CB 894 on forward junction box (see
fig. 92-3).
Pull circuit breakers INV 1/MAIN 1, INV 1/MAIN 2, INV 2/MAIN 1 and
INV 2/MAIN 2
Connect battery.
Remove nose access door.
g. Set switch MASTER PWR SW to NORM.
h. Set switch DC PWR SEL SW to BAT.
i. Set switch BUS TIE SW to NORM
j. Press circuit breaker INV 1/MAIN 1 on overhead console.
k. Set switch INVERTER 1 to ON.
= indicator light INV 1 must extinguish.
1. Using multimeter, test blocking function of diodes CR 819 and CR 887:
= connect positive lead of multimeter to the diode input (4, fig.
823-1, DETAIL A) and negative lead to the fuselage.
- the multimeter shall indicate approx. 0 V. If voltage is indicated,
replace respective diode.
m, Set switch INVERTER 1 to OFF.
n, Pull circuit breaker INV 1/MAIN 1 on overhead console.
o. Press circuit breaker INV 1/MAIN 2 on overhead console
p. Set switch INVERTER 1 to ON.
- indicator Light INV 1 must extinguish.
CHAPTER 823
Page 8
Rev. 15y.
w
MBB HELICOPTERS
MAINTENANCE MANUAL MBB - BK 117
Using multimeter, test blocking function of diode CR 886:
= connect positive lead of multimeter to diode input and negative
lead to fuselage.
- the multimeter must indicate approx. 0 V. If voltage is indicated,
replace diode.
Set switch INVERTER 1 to OFF.
Pull circuit breaker INV 1/MAIN 2 on overhead console.
Press circuit breaker CB 893 on forward junction box.
Set switch INVERTER 1 to ON.
- indicator light INV 1 must extinguish.
Set switch INVERTER 1 to OFF.
Pull circuit breaker CB 893 on forward junction box.
Testing of diodes in inverter 2 feedlines.
a.
b.
Press circuit breaker INV 2/MAIN 1 in overhead console.
Set switch INVERTER 2 to ON.
= indicator light INV 2 must extinguish.
Using multimeter, test blocking function of diodes CR 820 and CR 888.
~ connect positive lead of multimeter to diode input and negative
lead to fuselage.
- the multimeter must indicate approx. 0 V. If voltage is indicated,
replace respective diode.
Set switch INVERTER 2 to OFF
Pull circuit breaker INV 2/MAIN 1 on overhead console.
Press circuit breaker INV 2/MAIN 2 on overhead console.
Set switch INVERTER 2 to ON.
= indicator Light INV 2 must extinguish.
Using multimeter, test blocking function of diode CR 889.
- connect positive lead of multimeter to diode input and negative
lead to fuselage.
- the multimeter must indicate approx. 0 V. If voltage is indicated,
replace diode.
CHAPTER 823
Page 9MBB HELICOPTERS
MAINTENANCE MANUAL MBB - BK 117
i, Set switch INVERTER 2 to OFF.
j. Pull circuit breaker INV 2/MAIN 2 on overhead console.
k. Press circuit breaker CB 894 on forward junction box.
1, Set switch INVERTER 2 to ON.
indicator light INV 2 must extinguish.
Set switch INVERTER 2 to OFF.
n, Press circuit breaker CB 893 on forward junction box.
Set switches BUS TIE SW, DC PWR SEL SW and MASTER PWR SW to OFF.
Pp. Press circuit breakers INV 1/MAIN 1, INV1/MAIN 2, INV 2/MAIN 1 and
INV 2/MAIN 2.
q. Remove mltimeter.
r. Reinstall nose access door.
s. Disconnect battery
CHAPTER 823
Page 10 Rev. 15MBB HELICOPTERS
MAINTENANCE MANUAL MBB - BK 117
EFFECTIVITY Helicopters $/N 7183 and prior, equipped with DAFCS system.
1. Heat sink with diode
cRese, Crste, CREB7
2 Heat sink with diode
(CR889, CR820, CRBSB
3 Diode
4 Tost point,
diode input
ests
Figure 823 - 1 Testing of diodes - schematic diagram
CHAPTER 823
Rev. 15 Page 11/12