17 Calendar Drier Motor 1 Fondation

Grouting Area

253.5

96.5
CALENDOR DRIER MOTOR 1
Grouting Area
277

184.5
211

39.5

Volume
Luas1 2.77 x 2.11 = 5.8447
Luas 2 0.965 x 0.395 = 0.381175
Tot. Luas 5.8 + 0.38 = 6.18

Volume Luas x Tinggi


6.18 x 0.09 = 0.5562
18 Calendar Drier Motor 2 Fondation

Grouting Area

11

256

100
Grouting Area

CALENDOR DRIER MOTOR 2


277

186
41
215

Volume
Luas1 2.77 x 2.15 = 5.9555
Luas 2 1x 0.41 = 0.41
Tot. Luas 5.95 + 0.41 = 6.36

Volume Luas x Tinggi


6.36 x 0.11 = 0.6996
19 Calendar Drier Motor 3

Grouting Area

163

78.5
CALENDOR DRIER MOTOR 3
Grouting Area
256

176.5
122.5

Volume
Luas1 2.56 x 1.225 = 3.136
Luas 2 0.785 x 0.405 = 0.317925
Tot. Luas 3.136 + 0.318 = 3.454

Volume Luas x Tinggi


3.454 x 0.06 = 0.20724