DETAIL OF ASSISMENT OF STREETS

S.NO MRS 2020-21 Discription of Items No's Length Width Hight/Depth Quantity Unti/Amount

Satreet Pavemrnt of Engaran yasir killy

Dressing & leveling earth to design sections ordinary or hard


1 03-21-c soil upto cut or fill 6 inchs
(7.2+5.7)/2
Gul satan 1 67 6.45 = 432.15 cft
Amjid 1 62 5 = 337.9 cft
(6.7+4.2)/2
Amzala 1 22 10 = 224.4 cft
Amzala 1 28 9.2 = 257.6 cft
1 36.7 13.65 = 501 cft
1 53.8 10.05 = 541 cft
(9.10+11)/2
1 42 5.11 = 215 cft
1 24 9.1 = 218 cft
Yasir 1 124 11.6 = 1438 cft
(9+13+12.8)/3
1 82.5 13.1 = 1081 cft
(13.2+13)/2
Ali rehman 1 24.9 13 = 324 cft
Mulazim kor 1 9 6.8 = 61 cft
1 124.8 10.2 = 1273 cft
1 15.8 9.5 = 150 cft
7053.825
7053.825 / 10.76 = 655.56
@ Rs 9.81 Rs 6431.04

2 16-22-c Supply & Spreading 1" -1.5" gauge shingle on road


(7.2+5.7)/2
Gul satan 1 67 6.45 0.25 = 108.0375 cft
Amjid 1 62 5 0.25 = 84.475 cft
(6.7+4.2)/2
Amzala 1 22 10 0.25 = 56.1 cft
Amzala 1 28 9.2 0.25 = 64.4 cft
1 36.7 13.65 0.25 = 125.23875 cft
1 53.8 10.05 0.25 = 135.1725 cft
(9.10+11)/2
1 42 5.11 0.25 = 53.655 cft
1 24 9.1 0.25 = 54.6 cft
Yasir 1 124 11.6 0.25 = 359.6 cft
(9+13+12.8)/3
1 82.5 13.1 0.25 = 270.1875 cft
(13.2+13)/2
Ali rehman 1 24.9 13 0.25 = 80.925 cft
Mulazim kor 1 9 6.8 0.25 = 15.3 cft
1 124.8 10.2 0.25 = 318.24 cft
1 15.8 9.5 0.25 = 37.525 cft
1763.45625
1763.45625 / 35.32 = 49.93

@ Rs 1325 Rs 66154.57
Pcc(1:4:8) in concrete is in road with cuiring compacting etc.
(7.2+5.7)/2
Gul satan 1 67 6.45 0.25 = 108.0375 cft
Amjid 1 62 5 0.25 = 84.475 cft
(6.7+4.2)/2
Amzala 1 22 10 0.25 = 56.1 cft
Amzala 1 28 9.2 0.25 = 64.4 cft
1 36.7 13.65 0.25 = 125.23875 cft
1 53.8 10.05 0.25 = 135.1725 cft
(9.10+11)/2
1 42 5.11 0.25 = 53.655 cft
1 24 9.1 0.25 = 54.6 cft
Yasir 1 124 11.6 0.25 = 359.6 cft
(9+13+12.8)/3
1 82.5 13.1 0.25 = 270.1875 cft
(13.2+13)/2
Ali rehman 1 24.9 13 0.25 = 80.925 cft
Mulazim kor 1 9 6.8 0.25 = 15.3 cft
1 124.8 10.2 0.25 = 318.24 cft
1 15.8 9.5 0.25 = 37.525 cft
1763.45625
1763.45625 / 35.32 = 49.93
@ Rs 6004 Rs 299767.59
Pcc(1:2:4) in concrete is in road with cuiring compacting etc.
(7.2+5.7)/2
Gul satan 1 67 6.45 0.5 = 216.075 cft
Amjid 1 62 5 0.5 = 168.95 cft
(6.7+4.2)/2
Amzala 1 22 10 0.5 = 112.2 cft
Amzala 1 28 9.2 0.5 = 128.8 cft
1 36.7 13.65 0.5 = 250.4775 cft
1 53.8 10.05 0.5 = 270.345 cft
(9.10+11)/2
1 42 5.11 0.5 = 107.31 cft
1 24 9.1 0.5 = 109.2 cft
Yasir 1 124 11.6 0.5 = 719.2 cft
(9+13+12.8)/3
1 82.5 13.1 0.5 = 540.375 cft
(13.2+13)/2
Ali rehman 1 24.9 13 0.5 = 161.85 cft
Mulazim kor 1 9 6.8 0.5 = 30.6 cft
1 124.8 10.2 0.5 = 636.48 cft
1 15.8 9.5 0.5 = 75.05 cft
3526.9125
3526.9125 / 35.32 = 99.86
@ Rs 7783 Rs 777178.94

Total 1149532.14