Dressing & leveling earth to design sections ordinary or hard soil upto cut or fill 6
1 03-21-c
inchs
@ Rs 1325 Rs 83393.97
3 06-05-i Pcc(1:4:8) in concrete is in road with cuiring compacting etc.
Hujra 1 30 14.00 0.25 = 105 cft
1 44 14.00 0.25 = 154 cft
Ghulam nabi 1 54 10 0.25 = 135 cft
1 85 13 0.25 = 276.25 cft
1 46 18 0.25 = 207 cft
Shahid 1 49 8 0.25 = 98 cft
1 100 7 0.25 = 175 cft
1 35 6 0.25 52.5 cft
1 31 13 0.25 = 100.75 cft
1 138 10 0.25 = 345 cft
1 22 9 0.25 = 49.5 cft
Mohsher 1 20 20 0.25 = 100 cft
1 42 16 0.25 168 cft
1 24 8 0.25 = 48 cft
1 59 4 0.25 = 59 cft
1 150 4 0.25 = 150 cft
2223
2223 / 35.32 = 62.94 cum
@ Rs 6004 Rs 377884.82
4 06-05-f Pcc(1:2:4) in concrete is in road with cuiring compacting etc.
Hujra 1 30 14.00 0.5 = 210 cft
1 44 14.00 0.5 = 308 cft
Ghulam nabi 1 54 10 0.5 = 270 cft
1 85 13 0.5 = 552.5 cft
1 46 18 0.5 = 414 cft
Shahid 1 49 8 0.5 = 196 cft
1 100 7 0.5 = 350 cft
1 35 6 0.5 105 cft
1 31 13 0.5 = 201.5 cft
1 138 10 0.5 = 690 cft
1 22 9 0.5 = 99 cft
Mohsher 1 20 20 0.5 = 200 cft
1 42 16 0.5 336 cft
1 24 8 0.5 = 96 cft
1 59 4 0.5 = 118 cft
1 150 4 0.5 = 300 cft
4446
4446 / 35.32 = 125.88 cum
@ Rs 7783 Rs 979706.06
Total 1449091.78