Plant Operation Testing Reading Sheet

Developer M. Nasir Uddin SCE 12-Dec-2011

Reviewer Sultan Shamshudeen Process Engineer 12-Dec-2011

Approver Rafi Ahmad Operation Manager 12-Dec-2011

Name Title Date Signature

Revision Date Description

00 12-Dec-2011 New Issue


Document Revision and Approval
Form No: NE/OPR/SP-008/LS-001
Form 690790437.docx
Title:
Plant Operation Testing Reading Sheet

Range /
Sr. # Activities / Details Reading Remarks
Criteria
Pre-Start Checks
All related valves are in lineup
1 Yes-No
position.

2 Diesel Oil tank level is sufficient. Yes-No

Diesel Engine Fire Pump Radiator


3 Yes-No
water level is sufficient.

4 System pressure is O.K. 100 - 110 psi

Batteries condition. (Water Level


5 Yes-No
and Terminals are proerly attached)
During Running

1 Pump sound is O.K. Yes-No

2 System pressure. 100 - 110 psi

3 Battery volts are normal.

4 Temperature

5 Exhaust smoke condition is O.K. Yes-No

After Stop checks


Yes-No
1 Diesel Oil tank level is refilled.

System pressure is maintaining after


2 100 - 110 psi
stopped.
Both pumps are on AUTO after the
3 Yes-No
test.

Checked By

Name: ________________________

Shift: ________________________

Signature: ________________________
Date and
Time: ________________________

FM. No: NE/OPR/SP-008/LS-001 Rev: 00 Date: 12-Dec-2011 Page 2 of 2