HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)

PROJECT / OFFICE: SF108 DESCRIPTION OF JOB: STEEL WORK PREPARED BY: HILAL NAWAWI HIRARC NO. 01
REV. NO. 0

LOCATION: BERTAM, KEPALA LEGAL AND OTHER REQUIREMENTS: Occupational Safety And Health Act APPROVED BY: DAVID ONG TAI KHENG PAGE 1 of 8
BATAS 1994, section 17(2) under Occupational Safety And Health Act 1994, Section 35
under Factories And Machinery Act 1967, (Reg. 18(2)(b), Building Operations And
Works Of Engineering Construction (Safety) Regulations, 1986), (Reg. 18(1), ACKNOWLEDGE BY:
Building Operations And Works Of Engineering Construction (Safety) Regulations,
1986) , CPL 1997, USECH 2000

NO. WORK ACTIVITY HAZARD IDENTIFICATION EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER ACTION / PIC
R/ CONTROL CONTROL
NR/
AB L/Hood Severity Risk
Hazard Effect (A) (B) Level

1. Delivery of material NR Mechanical struck Minor injury machine must operate by 2 2 4 committee
loading and unloading by moving part of competent operator
(L) Refer existing control
material machine damage to
measure
(reinforcement bar, property / worker stay away from moving
timber, plywood, utilities machine
scaffolding acts) 2 4
Physical falling serious injury / machine must operate by 8 committee
object-during fatality competent operator (M) Refer existing control
lifting of material /
measure
steel bar damage to worker stay away from moving
property machine
2. stacking / storing NR Physical slip / fall / Minor injury machine must operate by 2 2 4 committee
material at site collapse of competent operator
(L)
material due to
poor material worker stay away from moving Refer existing control
arrangement machine measure

suitable track are provided and


inspected by designated person
NR Physical struck/ serious injury machine must operate by 2 3 6 committee
hit by moving part competent operator (M)
of material during
lifting activity worker stay away from moving Refer existing control
machine measure

suitable track are provided and


inspected by designated person
3. Tile laying R Physical worker Negligible Manual handling / lifting should be 2 2 4 Refer existing control committee
slip and fall injury carry out with correct method measure
(L)

HSE-P03-02
HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)

PROJECT / OFFICE: SF108 DESCRIPTION OF JOB: STEEL WORK PREPARED BY: HILAL NAWAWI HIRARC NO. 01
REV. NO. 0

LOCATION: BERTAM, KEPALA LEGAL AND OTHER REQUIREMENTS: Occupational Safety And Health Act APPROVED BY: DAVID ONG TAI KHENG PAGE 2 of 8
BATAS 1994, section 17(2) under Occupational Safety And Health Act 1994, Section 35
under Factories And Machinery Act 1967, (Reg. 18(2)(b), Building Operations And
Works Of Engineering Construction (Safety) Regulations, 1986), (Reg. 18(1), ACKNOWLEDGE BY:
Building Operations And Works Of Engineering Construction (Safety) Regulations,
1986) , CPL 1997, USECH 2000

NO. WORK ACTIVITY HAZARD IDENTIFICATION EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER ACTION / PIC
R/ CONTROL CONTROL
NR/
AB L/Hood Severity Risk
Hazard Effect (A) (B) Level

to ensure worker follow SOP


during loading & unloading
4. Embedded plate to NR Physical worker Fatality / to ensure operator & crane with 2 4 8 committee
wall steel plate fixing fall from height serious injury valid PMA and license (M)
Refer existing control
to ensure the hook & string is in
measure
good condition

to used safety harness


NR Physical hit by Fatality / work to be carried out by skill 2 4 8 committee
falling object- serious injury worker (M)
material / hand
tool
barricade / cordon the working
area
Refer existing control
measure
provide watchman with whistle to
warn workers at lower ground

to inform supervisor/ safety


personal before work commence
5. Welding / cutting the NR Chemical serious injury to ensure operator & crane with 2 4 8 Refer existing control committee
steel plate inhalation of (long term can valid PMA and license measure
(M)
welding fume impair worker
lung)
to ensure the hook & string is in
good condition

HSE-P03-02
HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)

PROJECT / OFFICE: SF108 DESCRIPTION OF JOB: STEEL WORK PREPARED BY: HILAL NAWAWI HIRARC NO. 01
REV. NO. 0

LOCATION: BERTAM, KEPALA LEGAL AND OTHER REQUIREMENTS: Occupational Safety And Health Act APPROVED BY: DAVID ONG TAI KHENG PAGE 3 of 8
BATAS 1994, section 17(2) under Occupational Safety And Health Act 1994, Section 35
under Factories And Machinery Act 1967, (Reg. 18(2)(b), Building Operations And
Works Of Engineering Construction (Safety) Regulations, 1986), (Reg. 18(1), ACKNOWLEDGE BY:
Building Operations And Works Of Engineering Construction (Safety) Regulations,
1986) , CPL 1997, USECH 2000

NO. WORK ACTIVITY HAZARD IDENTIFICATION EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER ACTION / PIC
R/ CONTROL CONTROL
NR/
AB L/Hood Severity Risk
Hazard Effect (A) (B) Level

to used safety harness


NR Radiation Eye serious injury Material handling should be 3 1 3 committee
injury (long term can carried out with correct method
(L)
impair worker Refer existing control
eye) Take a 2-3 minutes rest after measure
every 2 (two) hours

NR Physical burning Minor injury welding area must be free from 2 2 4 committee
due to welding / any flammable material
(L)
oxy cutter Refer existing control
damage to to provide fire extinguisher at measure
sparking
property activity area

NR Physical worker Minor injury oxy cylinder must be secure up- 2 2 4 committee
hit by oxy cylinder right/put in cylinder cage
(L)
provide flash back arrestor to all
Refer existing control
oxy cylinder
measure
empty cylinder must be remove
from activity area / put in storage
area
6. Line, level and bolting NR Physical worker fatality / provide proper working platform 2 4 8 committee
works fall from height serious injury for workers (M) Refer existing control
measure
used safety harness
Refer existing control
measure
NR Physical hit by serious injury work to be carried out by skill 2 4 8 Refer existing control committee
falling object- workers (M)

HSE-P03-02
HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)

PROJECT / OFFICE: SF108 DESCRIPTION OF JOB: STEEL WORK PREPARED BY: HILAL NAWAWI HIRARC NO. 01
REV. NO. 0

LOCATION: BERTAM, KEPALA LEGAL AND OTHER REQUIREMENTS: Occupational Safety And Health Act APPROVED BY: DAVID ONG TAI KHENG PAGE 4 of 8
BATAS 1994, section 17(2) under Occupational Safety And Health Act 1994, Section 35
under Factories And Machinery Act 1967, (Reg. 18(2)(b), Building Operations And
Works Of Engineering Construction (Safety) Regulations, 1986), (Reg. 18(1), ACKNOWLEDGE BY:
Building Operations And Works Of Engineering Construction (Safety) Regulations,
1986) , CPL 1997, USECH 2000

NO. WORK ACTIVITY HAZARD IDENTIFICATION EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER ACTION / PIC
R/ CONTROL CONTROL
NR/
AB L/Hood Severity Risk
Hazard Effect (A) (B) Level

material / hand
tool barricade / cordon the working measure
area
7. Steel erection lifting R Physical struck / damage to Crane must operate by competent 3 3 9 committee
and hoisting column hit by moving part property operator (M)
of steel column
lifting equipment to be inspect
before lifting activity

lifting lug to be used for lifting of


column activity

tag line to be used to control Refer existing control


column during lifting activity measure

proper communication between


signalman and crane operator

Designated person to supervise


lifting activity

workers stay away from hoisting


and lifting radius

HSE-P03-02
HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)

PROJECT / OFFICE: SF108 DESCRIPTION OF JOB: STEEL WORK PREPARED BY: HILAL NAWAWI HIRARC NO. 01
REV. NO. 0

LOCATION: BERTAM, KEPALA LEGAL AND OTHER REQUIREMENTS: Occupational Safety And Health Act APPROVED BY: DAVID ONG TAI KHENG PAGE 5 of 8
BATAS 1994, section 17(2) under Occupational Safety And Health Act 1994, Section 35
under Factories And Machinery Act 1967, (Reg. 18(2)(b), Building Operations And
Works Of Engineering Construction (Safety) Regulations, 1986), (Reg. 18(1), ACKNOWLEDGE BY:
Building Operations And Works Of Engineering Construction (Safety) Regulations,
1986) , CPL 1997, USECH 2000

NO. WORK ACTIVITY HAZARD IDENTIFICATION EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER ACTION / PIC
R/ CONTROL CONTROL
NR/
AB L/Hood Severity Risk
Hazard Effect (A) (B) Level

Physical falling serious injury Crane must operate by competent 3 3 9 committee


object (during operator (M)
lifting of material)
damage to
do not hoist other material
property
together with steel column Refer existing control
measure

8. Secure of column NR Physical worker fatality/ serious provide proper access and 2 4 8 committee
foundation bolt slip and fall from injury working platform for worker (M) Refer existing control
height measure
to used safety harness
NR Physical hit by serious injury work to be carried out by skill 2 3 6 committee
falling object- workers (M)
Refer existing control
material / hand
barricade/cordon the working area measure
tool

HSE-P03-02
HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)

PROJECT / OFFICE: SF108 DESCRIPTION OF JOB: STEEL WORK PREPARED BY: HILAL NAWAWI HIRARC NO. 01
REV. NO. 0

LOCATION: BERTAM, KEPALA LEGAL AND OTHER REQUIREMENTS: Occupational Safety And Health Act APPROVED BY: DAVID ONG TAI KHENG PAGE 6 of 8
BATAS 1994, section 17(2) under Occupational Safety And Health Act 1994, Section 35
under Factories And Machinery Act 1967, (Reg. 18(2)(b), Building Operations And
Works Of Engineering Construction (Safety) Regulations, 1986), (Reg. 18(1), ACKNOWLEDGE BY:
Building Operations And Works Of Engineering Construction (Safety) Regulations,
1986) , CPL 1997, USECH 2000

NO. WORK ACTIVITY HAZARD IDENTIFICATION EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER ACTION / PIC
R/ CONTROL CONTROL
NR/
AB L/Hood Severity Risk
Hazard Effect (A) (B) Level

9. Fix the bolt R Physical falling serious injury work to be carried out by skill 2 3 6 committee
object - hand tool / workers (M)
bolt
barricade/cordon the working area

Refer existing control


measure

10. Lifting and hoisting of R Physical struck / serious injury Crane must operate by competent 3 3 9 committee
main beam hit by moving part operator (M)
of main beam
lifting equipment to be inspect
before lifting activity

lifting lug to be used for lifting of


column activity
Refer existing control
tag line to be used to control
measure
column during lifting activity

proper communication between


signalman and crane operator

Designated person to supervise


lifting activity

workers stay away from hoisting

HSE-P03-02
HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)

PROJECT / OFFICE: SF108 DESCRIPTION OF JOB: STEEL WORK PREPARED BY: HILAL NAWAWI HIRARC NO. 01
REV. NO. 0

LOCATION: BERTAM, KEPALA LEGAL AND OTHER REQUIREMENTS: Occupational Safety And Health Act APPROVED BY: DAVID ONG TAI KHENG PAGE 7 of 8
BATAS 1994, section 17(2) under Occupational Safety And Health Act 1994, Section 35
under Factories And Machinery Act 1967, (Reg. 18(2)(b), Building Operations And
Works Of Engineering Construction (Safety) Regulations, 1986), (Reg. 18(1), ACKNOWLEDGE BY:
Building Operations And Works Of Engineering Construction (Safety) Regulations,
1986) , CPL 1997, USECH 2000

NO. WORK ACTIVITY HAZARD IDENTIFICATION EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER ACTION / PIC
R/ CONTROL CONTROL
NR/
AB L/Hood Severity Risk
Hazard Effect (A) (B) Level

and lifting radius


R Physical falling serious injury Crane must operate by competent 3 3 9 committee
object (during operator (M)
lifting of material)
damage to crane inspected before work Refer existing control
property commence measure

do not hoist other material


together with main beam
mechanical falling serious injury Crane must operate by competent 3 3 9 committee
of main beam - operator (M)
Refer existing control
due to broken of
damage to crane inspected before work measure
wire rope
property commence

11. Fix the bolt R Physical falling serious injury work to be carried out by skill 2 3 6 committee
object - hand tool / workers
(M) Refer existing control
bolt
barricade/ cordon the working measure
area

PILE CUTTING &


HACKING Refer existing control
measure

1. Excavation work NR Physical struck by serious injury machine operated by competent 2 3 6 committee
excavator moving into moving part of operator Refer existing control
(M)
the excavation area. machine measure

HSE-P03-02
HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)

PROJECT / OFFICE: SF108 DESCRIPTION OF JOB: STEEL WORK PREPARED BY: HILAL NAWAWI HIRARC NO. 01
REV. NO. 0

LOCATION: BERTAM, KEPALA LEGAL AND OTHER REQUIREMENTS: Occupational Safety And Health Act APPROVED BY: DAVID ONG TAI KHENG PAGE 8 of 8
BATAS 1994, section 17(2) under Occupational Safety And Health Act 1994, Section 35
under Factories And Machinery Act 1967, (Reg. 18(2)(b), Building Operations And
Works Of Engineering Construction (Safety) Regulations, 1986), (Reg. 18(1), ACKNOWLEDGE BY:
Building Operations And Works Of Engineering Construction (Safety) Regulations,
1986) , CPL 1997, USECH 2000

NO. WORK ACTIVITY HAZARD IDENTIFICATION EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER ACTION / PIC
R/ CONTROL CONTROL
NR/
AB L/Hood Severity Risk
Hazard Effect (A) (B) Level

Likelihood Rating Severity Description Risk Ranking


Very Unlikely, Probably Will Not Happen, Yearly 1 First Aid Injury / Non-Lost Time Minor injury or ill health requiring first aid only, LEVEL SCORE
Injury no lost of work time.
Unlikely, Rarely, 6 months 2 Minor Injury / Minor Ill Health / Moderate injury or ill health requiring L LOW (1-4)
No Lost Time Injury treatment.
Likely, Occasionally, 3 Major Injury / Major Ill Health / Serious bodily injury or serious work caused ill M MEDIUM (5-12)
Permanent Disability / Lost Time health.
Injury / Occupational Diseases
Very Likely, Monthly 4 Fatality & Property damage Death. H HIGH (15-25)
Most Likely, Frequently, Daily 5 Catastrophic Numerous fatalities, irrecoverable property H HIGH (15-25)
damage and productivity

Description

R ROUTINE
NR NON-ROUTINE
AB ABNORMAL

HSE-P03-02