The Resource Overhead Associations page enables you to associate overheads with resources.
You can assign resource cost as dollars per hour. If you enter a new resource, you can directly
enter a frozen unit cost. However, you cannot directly update the frozen unit cost for a
previously entered resource.
Additional Information
Procedure
Step Action
1. Begin by navigating to the Resources page.
Step Action
5. Click the M1 Seattle Manufacturing list item.
or Press [Alt+O].
7. Use the Resources page to enter a resource name to describe the resource.
Step Action
8. Click in the Resource field.
Step Action
9. Press [F11].
Step Action
10. Enter the desired information into the Resource field. Enter "HG_TST_MCH".
11. Press [Ctrl+F11].
12. Click the Overheads button.
or Press [Alt+a].
13. Use the Resource Overhead Associations page to associate overheads with
resources.
Step Action
14. Click in the Cost Type field.
15. Enter the desired information into the Cost Type field. Enter "Engineer".
16. Click in the Description field.
17. The Allow Updates check box indicates whether the cost type is defined as
updatable.
18. Click in the Overhead field.
19. Enter the desired information into the Overhead field. Enter "MfgEng".
20. Click in the Description field.