You are on page 1of 11

Kayathar Windfarm Customers Meet

organized by
Everrenew Energy Pvt Limited
Everrenew at a Glance
SITE FEASIBILITY
WRA & DEVELOPMENT LAND MATERIAL SUPPLY COMMISSIONING

1 3 5 7

2 4 6 8
PERMIT & APPROVAL CIVIL PERMIT & APPROVAL ASSET MANAGEMENT

Cost Reduction Revenue Enhancement Risk Mitigation Value Creation

for Renewable Energy Generators

2969 MW 2122 MW 267 MW 580 MW


Overall Ongoing Projects Ongoing Wind Projects Ongoing Solar Ongoing Hybrid
Projects Projects

551 MW 225+ MW
Completed Assets Under
Projects Management

Fastest Growing Renewable Energy company, providing one-stop shop solutions for
Project Management & Asset Management
CONNECT : COLLABORATE : CO-CREATE © Everrenew Energy Private Limited
Venkatesh R
Everrenew Leadership Group CEO

Muthukumaravel Mohan Prakash P. Rajenthiran Veerasamy Rajendran Mohanram


Head Head Wind Head Head Head Rohitnath
Business Development Solar, BESS, Hydrogen Asset Management New Product Dep Head
Smart Meter

Sadeesh Kumar A
Sakthivel Ashish Sethi Aravind Jothiram
Head
Head Head
Head Engineering – Asset
Project & Development Solar Business Dep Operations (O&M)
Management

Guy Baeyens Suresh


Ponnurangam Mallikarujune Gowda
Head Head Head
International Head Solar Water Pump HSEQ
Business WRA

Ranganathan Thanigai Velan Dinesh Kumar


Head Head Head
Finance People & Culture Legal

Legendary Renewable Energy Leadership drives the Business in Everrenew


CONNECT : COLLABORATE : CO-CREATE © Everrenew Energy Private Limited
Everrenew’s efforts on Turbine Owners obtaining
Kayathar 10(1) Substation ownership
Kayathar Project Details :
Site Kayathar
Turbine Make & Model SGRE G97 – 2MW
Pooling Substation 10(1) SS - 230/33KV
PSS Present Ownership SGRE
Total MW 300
No. of Turbines 150
No. of Clients 82

Clients Pain Points (Shared Services)

- Pathway

- WTG road repair & maintenance

- Site security service

- Line BD, Poles, SEB coordination

- Pending Project Issues (Land & Pathway)


© Everrenew Energy Private Limited
Legal Opinion about 10(1) SS

© Everrenew Energy Private Limited


SGRE MOM dated 13 June 2023 Descopes

- SGRE proposed to de-scope the work


E-BoP, Security & Feeder Lines - Interested Clients to approach SGRE for descoping of the same
- Client to engage the third-party contractor to handle the same

- SGRE claims contractually not in-scope


ROW, Land & Pole issues - Client to manage the same directly in case of any issues and any
support required by SGRE in attending to the WTG breakdown

- SGRE proposed to transfer the ownership to clients.


Substation Ownership
- Clients to form association enabling SGRE transfer the ownership
Pathway In atorecent
- Client manageMeeting on 24
the same & 25th July 2023, SGRE Projects
directly
Department has proposed resolve under their scope. SGRE to
- SGRE project
identify teamtoshall
3rd Party whomsupport, clienttotopay
customer handle commercial
directly if
and adjust
Pending Project Issues
any. with WTG O&M Payment;

Gamesa descopes all above from their responsibilities & scope of work for any
future troubles / issues. © Everrenew Energy Private Limited
Everrenew Roles & Responsibility as Facilitator

1 Everrenew shall Facilitate in formation of Association / SPV

2 Allocation of proportionate share up to 99% in SPV, to Turbine Owners

3 Everrenew to hold 1% of the SPV shares to take it up with SGRE for transfer of PSS Ownership to SPV

4 Everrenew to spend initial expenses & charge back the Turbine Owners proportionately

5 Owners to authorize Everrenew to facilitate the entire process

6 Everrenew to act as a facilitator in this process and will take up the BoP O&M in full

© Everrenew Energy Private Limited


Everrenew Proposal

Everrenew propose to take up the Shared Service of the entire 300MW windfarm on long term contract

Everrenew shall cover all scope of work (PSS, Line & Feeder Maintenance, Pathway, Road Repair &
Maintenance, Security services, ROW management, SEB Coordination)

Everrenew shall enter into BoP O&M Contract with Individual Turbine Owners

Everrenew is ready to support the WTG O&M services as well, at Turbine Owners’ choice

© Everrenew Energy Private Limited


Thank you..

www.everrenew.com