You are on page 1of 2

Project :............................................. ..........................................................

Cremation Ground /
Crematorium (Incinerator)

District: Savanne Distance to Nearby Approx.


Building/House (m): 100m
Location: Grand Bois
Combined
Standalone or Combined
CG/CR
Operational since: No information available. Wind Direction:

Neighbouring Land Uses: Places of worship, cemetery, houses, sugarcane plantation, tea plantation
Operating hours per week: No information available.

For Cremation Ground only:


Area of land use for Cremation Ground (m) : Approx. 1350 sqm (combined)
Fenced: Yes (Boundary blockwall) Covered: Yes (1 no.) / No (2 no.)
Number of Pyre: 3 (1 no. covered and 2 no. uncovered)
Pyre made of: Masonry stubs + steel struts
Ignition Material: Wood and rubber observed on site.

For Crematorium (Incinerator) only:

Incinerator Brand:
Other Machines used:
Air Pollution Control Equipment:
Height of
Operating Temparature (⁰C): about 4m
Chimney Stack (m):
Residence Time of Internal Diameter
Second Chamber: of Stack (mm) :

Is Stack, Heat insulated or Mild steel ?


For forced draught fan blowing into stack,
- Horse Power (or KW): - Air feed rate in m3/sec
Design exit velocity at tip of stack (m/s):

Interview with locals


Noise during cremation:

Problem & Nuisances:

Remarks on pictures taken:

Survey Done By :
Contact person Name:
Phone Number:
Cremation Ground /
Project :.............................................
.......................................................... Crematorium (Incinerator)

Any other remarks:

Survey Done By :
Contact person Name:
Phone Number:

You might also like