You are on page 1of 2

Project :............................................. ..........................................................

Cremation Ground /
Crematorium (Incinerator)

Distance to Nearby
District: Savanne Approx. 50m
Building/House (m):
Location: Bel Ombre
Standalone
Standalone or Combined
CG
Operational since: No information available. Wind Direction:

Neighbouring Land Uses: Settlement (less than 50m), trees surrounding the cremation ground region
Operating hours per week: No information available.

For Cremation Ground only:


Area of land use for Cremation Ground (m) : Approx. 450 square metres.
Fenced: Yes (Boundary blockwall) Covered: Yes (1 no.) / No (1 no.)
Number of Pyre: 2 (1 no. covered and 1 no. uncovered)
Pyre made of: Covered (Concrete platform/stubs + steel struts) and Uncovered (steel struts only)
Ignition Material: Wood and ruber observed on site.

For Crematorium (Incinerator) only:

Incinerator Brand:
Other Machines used:
Air Pollution Control Equipment:
Height of
Operating Temparature (⁰C):
Chimney Stack (m):
Residence Time of Internal Diameter
Second Chamber: of Stack (mm) :

Is Stack, Heat insulated or Mild steel ?


For forced draught fan blowing into stack,
- Horse Power (or KW): - Air feed rate in m3/sec
Design exit velocity at tip of stack (m/s):

Interview with locals


Noise during cremation:

Problem & Nuisances: Nearby settlements/people face nuisance


Smoke and odour affect people and children
Used 2-3 times every week
Numerous complaints have been made

Remarks on pictures taken:

Survey Done By :
Contact person Name:
Phone Number:
Cremation Ground /
Project :.............................................
.......................................................... Crematorium (Incinerator)

Any other remarks:

Survey Done By :
Contact person Name:
Phone Number:

You might also like