CVHE/F/G CenTraVac®

OPERATING REPORTS
I. Equipment Design Specifications:
JOB NAME:VILLA LA ESTANCIA Model #:
CVHE040FA3FW3UR2225Q1E5L1C0000000FA000000010002C0
LOCATION :CABO SAN LUCAS B.C.S. Serial #: L01A06701 Tag #: 1
NAMEPLATE: 460 volts 231RLA 60 HERZ
DESIGN: 460 volts 231RLA 60 HERZ 400 TONS
Caution: Changes to the chiller settings should be made by authorized personnel who are familiar with the installation and the
effects which these changes may produce.
II. Chiller Report:
A. B. C.
1. Operating Mode: Line 1
2. Operating Mode: Line 2
3. Active Chilled Water SP Deg Deg Deg

6. Front Panel CWS Deg Deg Deg

7. Evap Entering Wtr Temp Deg Deg Deg

8. Evap Lvg Wtr Temp Deg Deg Deg

9. Cond Ent Wtr Temp Deg Deg Deg

10. Cond Lvg Wtr Temp Deg Deg Deg

11. Active Current Limit SP 100 % 100 % 100 %


15. Chiller Tons (Opt) 400 400 400
19. Chill’d Water SP Source FRONT PANEL FRONT PANEL FRONT PANEL
20. Reset Condition NONE NONE NONE
21. Cur Limit SP Source FRONT PANEL FRONT PANEL FRONT PANEL
III. Refrigerant Report:
A. B. C.
1. Evap Rfgt Pressure
2. Cond Rfgt Pressure
3. Saturated Evap Temp Deg Deg Deg
4. Evap Rfgt Pressure
5. Saturated Cond Temp Deg Deg Deg
6. Cond Rfgt Pressure
7. Sat Evap Rfgt Temp Deg Deg Deg
8. Comp Discharge Temp Deg Deg Deg
9. Purge Operating Mode
10. Purge Status
11. Purge Alarm Message
12. Purge Suction Temp Deg Deg Deg
13. Purge Liquid Temp Deg Deg Deg
14. Purge Pumpout Rate Min/24 Hrs Min/24 Hrs Min/24 Hrs
15. Prg Max Pmpout Rate Min/24 Hrs Min/24 Hrs Min/24 Hrs
16. Prg Total Pmpout Time Min Min Min
17. Prg Total Run Time Hrs Hrs Hrs
18. Prg Adp Cyc T/Chlr On Hrs Hrs Hrs
20. Prg Adp Cyc T/Chlr Off Hrs Hrs Hrs
22. Svc Log Prg Pmp Time Min Min Min
23. Svc Log T/Last Reset Cal Days Cal Days Cal Days
24. 30 Day Prg Pmpout Avg Min Min Min
25. Chiller Avg Run Time Hr/Day Hr/Day Hr/Day
26. 30 Day Prg Pmpout Avg
Chiller Running Min Min Min
27. Lst 5 Cyc Pmpout Avg
Int Fr Sdn /3 Hrs/Shtdn Min Min Min
28. 30 Day Pmpout Avg
Int Fr/3Hrs/Shtdn/Start Min Min Min

Page 1
29. Evap Approach Temp Deg Deg Deg
30. Cond Approach Temp Deg Deg Deg

Page 2
IV. Compressor Report:
A. B. C.
1. Differential Oil Pressure
2. Oil Tank Temperature Deg Deg Deg
3. Discharge Oil Pressure
4. Oil Tank Pressure
5. Inlet Guide Vane Position % Open % Open % Open
6. Inlet Guide Vane Position Degrees Degrees Degrees
7. Compressor Phase Phase A % Phase A % Phase A %
Currents: %RLA Phase B % Phase B % Phase B %
Phase C % Phase C % Phase C %
8. Compressor Phase Currents: Phase A Amps Phase A Amps Phase A Amps
Amps Phase B Amps Phase B Amps Phase B Amps
Phase C Amps Phase C Amps Phase C Amps
9. (Opt) Compressor Phase AB Volts AB Volts AB Volts
Voltages BC Volts BC Volts BC Volts
CA Volts CA Volts CA Volts
10. (Opt) Compressor %PF % Power Factor % Power Factor % Power Factor
11. (Opt) Compressor KW KW KW KW
12. Comp Winding Temps W1 Deg F/C W1 Deg F/C W1 Deg F/C
W2 Deg F/C W2 Deg F/C W2 Deg F/C
W3 Deg F/C W3 Deg F/C W3 Deg F/C
12. Compressor Starts: Starts Starts Starts
13. Compressor Running Time: Hrs Min Hrs Min Hrs Min
14. Solid state starter heat sink F F F
V. Additional Information:
A. B. C.
1.Oil Level:
O O O
O O O
2. Chilled Water PD:
4. Cond Water PD:
4. Evp Press W/Test Gauge
5. Cnd PressW/Test Gauge

NOTAS Y COMENTARIOS:

______________________ _________________________
FREONIX SERVICIO Dpto. Mantenimiento
LOS CABOS Caboland Villa la Estancia