1 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Content
Chapter 1: Short Introduction to EPR™
Chapter 2: Nuclear Island Buildings
Chapter 3: Turbine Building
Chapter 4: Diesel Buildings
Chapter 5: Safety Concept for buildings

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


2 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Chapter 1

Short Introduction to EPR™

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


3 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
The EPRTM Story
1989: Agreement of cooperation between Framatome and
Siemens on development of common next generation PWR
(Founding of NPI – Nuclear Power International)
1989-1991: Development common product
1991-1994: Involvement of EDF and German utilities
Definition of EPR™ plant concept
1995-1997: Basic design studies by EDF, German utilities,
Framatome and Siemens
1998-2003: Post-basic design studies
2003: Order placed for OL3
2004: Decision to construct an EPR™ in France
2005: Proposal for four EPR™’s in China
New plants deployment BU formed in US
2007 Order placed for two EPR™’s in China

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


4 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
EPRTM - Built on Experience of 77 Plants
operated in France & Germany
EPRTM

N4 KONVOI

Evolutionary
development
keeps references

Solid Basis of Experience


with Outstanding Performance

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


5 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
N4 & KONVOI: Two Different Designs

N4 KONVOI
 Concrete cylindrical containment  Steel spherical containment
pre-stressed inner wall  Military aircraft Phantom
 Cessna, Lear jet  Spent fuel pit inside the reactor
 Fuel building building
 Safety systems:  Safety systems:
2 * 100 % trains w. connections 4 independent 50 % trains
spray system no spray system
 RHR inside the containment  Top mounted in-core
 Bottom in-core instrumentation instrumentation
 Computerized MCR  Main control room with dedicated
 Core: 205 FAs 17x17 panels
 Core: 193 FAs 18x18

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


6 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
EPR™ Development Objectives
Economically competitive with fossil plants
Large unit size: 1600 - 1800 MWe, economy of scale
High plant availability (90 to 92 %)
 Optimization of outages
 Accessible containment
 < 1 unplanned reactor trip/ year
60 years plant design life
 Structures and non- replaceable components: 60 years
 Other components: preferably 60, at least 40 years
 Replace ability of heavy components
 Exceptions: wear parts, consumables, & technologies with fast technical evolution (I&C
parts)

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


7 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
EPRTM Development Objectives – Fuel
Management

Flexible and economic fuel management


Plant optimized for UO2 fuel (< 5 % enrichment)
Plant design for batch burn-up > 55 MWd/kgU
Up to 50 % MOX capability
Flexibility for different loading schemes
Cycle lengths 12, 18 and 24 months

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


8 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
EPRTM Development Objectives – Load Follow
Operation Capability

Load follow operation capability


 Modulation slope for scheduled load variations: + 5 %/min
above 50 % rated power
 Remote control contribution: ± 10 %, < 1 %/min above 50 %
rated power
 Frequency control contribution: ± 2.5 %
 No restrictions for duration of part-load operation

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


9 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Design Philosophy
EPR™is a global product
 with a basic set of common design features adaptable to specific regulatory
 and commercial requirements of each country in which it is offered

EPR™design is based on combined design and operating


experiences of
 Framatome ANP and Siemens
 French and German utilities and safety authorities
 and with roots in the U.S. PWR fleet

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


10 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Design Philosophy - Objectives
EPR™ design philosophy is based on the following objectives
related to the current generation of PWRs
 Increase redundancy and separation concept

 Reduce core damage frequency (CDF)

 Reduce large release frequency (LRF)

 Mitigate severe accidents

 Protect safety related systems from external events

 Fitted with an improved man-machine interface (MMI)

 Extend response times for operator actions

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


11 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Main Data
Type of plants N4 EPR (OL3) KONVOI

Core thermal power (MWth) 4250 4300 3850


Electrical output (MWe) 1475 ≈ 1600 1365
N°of fuel assemblies 205 241 193
Type of fuel assemblies 17x17 17x17 18x18
Active length (cm) 427 420 390
Total F.A. length (cm) 480 480 483
Rod linear heat rate (W/cm) 179 155 167
N°of control rods 73 89 61
Total flow rate (kg/s) 19 420 22 245 18 800
Vessel outlet temp. (°C) 330 328 326
Vessel inlet temp. (°C) 292 296 292
S.G.: heat exch. Surface (m²) 7308 7960 5400
Steam Pressure (bar) 73 78 64.5

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


12 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Plant Overview
General Overview
Nuclear Island
Turbine Island
Diesel Buildings
Safety Concept, Safety Systems

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


13 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Plant – Overview (Example)

Reactor Building
Safeguard Building Division 1
Fuel Building

Diesel Building 1+2


Nuclear Auxiliary Building

Radioactive Waste Safeguard Building


Processing Building Division 2+3

Turbine Building
Safeguard Building
Division 4

Diesel building 3+4 Office Building Turbine Island


Electrical Building

Access Building

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


14 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Power Plant Site OL3

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


15 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
OL3 Plotplan

1 – Reactor Building
2 – Fuel Building
3 – Safeguard Buildings
4 – Diesel-Buildings
5 – Nuclear Auxiliary Building
6 – Waste Building
7 – Turbine Building

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


16 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Chapter 2

Nuclear Island Buildings

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


17 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Nuclear Island

Reactor Building
Safeguard Building Division 1
Fuel Building

Nuclear Auxiliary Building

Radioactive Waste Safeguard Building


Processing Building Division 2+3

Safeguard Building
Division 4

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


18 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
PWR – Function Principle

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


19 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Reactor Building - Arrangement
Reactor building

Primary system arrangement 2 1 2


characterized by: 2 2

1 Pressurizer in
separate area 2 2
2 2
2 Concrete walls
between loops 3

3 Double concrete wall


around the system

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


20 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Reactor Building – Main Components
Reactor building
+13.80 m

Reactor
Reactor Coolant
Coolant Pumps
Pumps
Steam
Steam Generators
Generators
Reactor
Reactor Pressure
Pressure Vessel
Vessel
Accumulator
Accumulator tanks
tanks
Pressurizer
Pressurizer tank
tank
Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL
21 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Reactor Building – Section View A

Steam Generator Loop 2

Reactor Coolant Pump Loop 3

Reactor Pressure Vessel

In Containment Refueling Water


Storage Tank (IRWST)

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


22 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Reactor Building – Section View B

Hatch, Material Lock


Pressurizer

Fuel Assembly
Pressurizer Relief Tank Transport Facility
Fuel Assembly
Personal Lock Transport Channel

Core Spreading Area


In Containment Refueling
Water Storage Tank (IRWST)

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


23 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Safeguard Buildings
Safeguard Building Division 1
Division 4
Division 2/3

 Safety Injection System (SIS)


 Component Cooling Water
System (CCWS)
 Part of Containment Heat
Removal System (CHRS)

 Main Control Room in division 2 and Technical


Support Center in division 3  Main Steam and Feedwater
 Equipment for I&C and electrical systems of the Valve Stations on upper level
Nuclear Island of division 1+4
 Emergency Feedwater System
 Safeguard Building Ventilation and Safety Chilled
Water Systems

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


24 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Safeguard Buildings – Section Views
Division 2 Division 1

Main Steam (Valve) Station


Main Control Room (MCR)

Personal Lock
Emergency
Feedwater Tank

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


25 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Fuel Building

 Storage of spent and new fuel assemblies outside


containment
 Sufficient storage capacity including full core unloading
Fuel Building
during outage
 Fuel assemblies are transferred via the transfer tube from
inside containment to the outside and vice versa
 Fuel transfer tube closed on both sides during normal
operation

 Fuel Pool Cooling System (FPCS)


 Extra Borating System (EBS)
 Chemical and Volume Control System
(CVCS)

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


26 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Fuel Building UFA (Example)

Fuel Assembly Transfer Compartment

Cask Loading Pit

New Fuel Assembly


Storage Compartment

Spent Fuel Pools

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


27 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Fuel Building UFA (Example)
Emergency Air-Lock

Hatch, Material Lock

Transport Shaft

Fuel Assembly Handling Floor

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


28 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Fuel Building (Example) – Section Views

Hatch, Material Lock

Cask Loading Pit


Spent Fuel Pools

Fuel Assembly Transfer Compartment

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


29 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Nuclear Auxiliary Building

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


30 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Nuclear Auxiliary Building (0 m)

Mixed Bed Filters

Filter Changing Machine

Mechanical Filtering Components

Coolant Storage Tanks

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


31 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Nuclear Auxiliary Building (+10,50/15,20 m)

Iodine Filter

Exhaust Air Fans

Supply Air Fans

HEPA-Filter Units
Supply Air Filters

Air Inlet for Ventilation System

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


32 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Nuclear Auxiliary Building – Section Views

Delay Beds

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


33 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Radioactive Waste Processing Building
 Collecting, storing and treatment of liquid and solid
radioactive waste
 Including waste water and concentrates

Radioactive Waste Processing Building

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


34 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Chapter 3

Turbine Building

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


35 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Turbine Building (Example)
Turbine Building

Low-Pressure Turbine
High-Pressure Turbine
Generator

Moisture Separatur/Preheater
Feedwater Tank

Condenser
Low Pressure Preheater
Main Steam Lines

Main Feedwater Lines

Main Feedwater Pumps


High Pressure Preheater

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


36 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Chapter 3

Diesel Buildings

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


37 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Diesel Buildings UBP

Emergency diesel division 1/2


Reactor
building
SBO diesel division 1
Fuel
building

Nuclear auxiliary
building

Waste
building
Turbine
building
Access
building

i ng
Emergency diesel division 3/4 ild
e bu
fi c
SBO diesel division 4 Of

Auxiliary standby transformer

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


38 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Diesel Buildings (Example)
Diesel Building
1/2

Diesel Building
3/4

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


39 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Diesel Buildings (Example)
4 * 7.7 MVA 2 * 1.7 MVA

Emergency Diesel Station Black Out


Generator (SBO) Diesel
Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL
40 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
View into the Plant (Example)

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


41 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Chapter 4

Safety Concept for Buildings

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


42 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Safety Concept for Buildings (1/3)
Structural design and physical arrangement of the buildings provide
protection from both external and internal hazards

Each safety system train is protected against propagation of internal


hazards (e.g. fire, high energy line break, flooding) from one train to any
other
 Allocation of each train into a specific area or division that is separated from the other
trains
 The 4 Safeguard Buildings correspond to the 4 safety divisions

All safety-related buildings are designed to withstand the effects of the


Safe Shutdown Earthquake and a Tornado

Some buildings are also designed to withstand an Aircraft Hazard and


Explosion Pressure Wave

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


43 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Safety Concept for Buildings (2/3)
Safety concept is a combination of hardened
structures and spatial separation:
 Fully hardened by means of a protection
 Shell for Safeguard Buildings (SGB) 2/3,
Reactor Building (RB), Fuel Building (FB)
 Main Control Room (MCR) and Remote
Shutdown Station (RSS) are located inside
fully hardened SGB 2/3
 Inner structures of SGB 2/3 and FB decoupled from outer protection walls to isolate the
consequences of an aircraft hazard
 SGB 1/4 physically separated, limiting potential destruction to one division
 Main Steam (MS) and Feedwater (FW) valve stations physically separated two-by-two
 Safety functions performed by systems installed in other buildings ensured by physical
separation
• e.g. Emergency Diesels and Essential Service Water System (ESWS)

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


44 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Safety Concept for Buildings (3/3)
All buildings and structures, are arranged based on economical
optimization, hazard potential, and operation factors

Turbine Building is independent from the Nuclear Island


 Turbine itself is located in a radial position with respect to the Reactor Building to
avoid the impact of a turbine missile.

Switchgear Building, containing the power supply and the


Instrumentation and Control (I&C) for the balance of plant, is located
next to the Turbine Building.
 Both buildings are designed on the basis of technical requirements and safety
regulations and do not impact the Nuclear Island.

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


45 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice
Safety Concept – Building Protection
Division 2 Division 3
ESWS ESWS EFWS Emergency Feedwater System
CCWS CCWS ESWS Essential Service water system
SIS/RHRS SIS/RHRS CCWS Component Cooling Water System
Control room SIS Safety Injection System
EBS Emergency Boration System
FPCS Fuel Pool Cooling System
Steam lines (SL) penetrations
Feedwater lines (FW) penetrations SL SL
FW IRWST FW

ESWS ESWS
CCWS CCWS
Division 1 Division 4
SIS/RHRS SIS/RHRS
SPREADING
AREA

EBS Spent Fuel Storage Pool FPCS


Airplane crash protected buildings

Training Center AREVA NP GmbH Proprietary - CONFIDENTIAL


46 B257.OL3.001 Intro to EPR™ 10/2011 © AREVA NP - All rights are reserved, see liability notice

You might also like