Professional Documents
Culture Documents
Sub-Total
ITEM 01 WALLS
A. WALLS- SMOOTH FINISHED 70,719.25 70,719.25
B. DRY WALLS 16,469.80 16,469.80
87,189.05
ITEM 02 CEILING 19,530.75 19,530.75
ITEM 03 ARCHITECTURAL FINISHES
A. DOORS AND WINDOWS 77,150.00 77,150.00
B. PAINTING 33105.00 33105.00
110,255.00
Total Material Cost: 159,894.00
Total Labor Cost: 58,430.80
Supervision 5% 10,916.24
Total Project Cost 229,241.04